These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The operation of the existing Nelson Mandela service station in Windhoek, Khomas Region.
The operation of the existing Puma Eros service station in Eros, Windhoek, Khomas Region.
Attachment | Size |
---|---|
502_EMP_Puma Eros service station in Eros.pdf | 1.26 MB |
502_Retail Licence_Puma Eros service station in Eros.pdf | 162.6 KB |
502_Map_Puma Eros service station in Eros.pdf | 236.68 KB |
503_Screening Notice_Nelson Mandela service station in Windhoek_0.pdf | 53.74 KB |
Cremation of human bodies as an aternative to burial.
Attachment | Size |
---|---|
660_SR_Proposed ELSH Crematorium_Windhoek.pdf | 744.6 KB |
660_EMP_Proposed ELSH Crematorium_Windhoek.pdf | 333.24 KB |
660_Map_Proposed ELSH Crematorium_Windhoek.pdf | 283.89 KB |
The operation of a fuel retail facility for NAMCOR at the Hosea Kutako International Airport in Windhoek, Khomas Region.
The Proposed Establishment of a Namibian Correctional Service (NCS) Fully-fledged Facility and Irrigation Activities in Ohongajokatjo, Kaoko-Otavi Settlement in the Kunene Region.
Transfer of the ECC for the Puma Energy bulk fuel storage facility in Lüderitz to Coastal Infrastructure Terminals Namibia (Pty) Ltd.
Transfer of the ECC for the Puma Energy bulk fuel storage facility in Walvis Bay to Coastal Infrastructure Terminals Namibia (Pty) Ltd.
Urban Green cc (The Environmental Assessment Practitioner) has been appointed by GreeNam Electricity (PTY) Ltd (The Proponent) to apply for the transfer of an Environmental Clearance Certificate for the existing 66kV Power Transmission Line situated within the Mariental District, Hardap Region. The 66kV Power Transmission Line distributes electricity to the NamPower Hardap substation from the Hardap photovoltaic solar project.
The applicant Charcoal warehouse cc, intends to continue operating a charcoal processing and packaging facility in Walvis Bay town.
The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
HAZARDOUS SUBSTANCE TREATMENT, HANDLING AND STORAGE 9.1 The manufacturing, storage, handling or processing of a hazardous substance defined in the Hazardous Substances Ordinance, 1974. 9.2 Any process or activity which requires a permit, licence or other form of authorisation, or the modification of or changes to existing facilities for any process or activity which requires an amendment of an existing permit, license or authorisation or which requires a new permit, license or authorisation in terms of a law governing the generation or release of emissions, pollution, effluent or waste.
Mineral Exploration Activities on Exclusive Prospecting License (EPL) No. 7264 near Talismanis Settlement in the Omaheke Region, Namibia.
Irrigation and related activities on Farm Verweg, Otjozondjupa Region.
Renewal application for operations of existing irrigation-based agricultural activities of Frontier Grapes, Aussenkehr, //Karas Region.
Renewal Application for Operations of Existing Irrigation-based Agricultural Activities of Orange River Vineyards Investments, Aussenkehr, //Karas Region.
Renewal Application for Operations of Existing Irrigation-based Agricultural Activities of Aussenkehr Farms, Aussenkehr, //Karas Region.
Renewal Application for Operations of Existing Irrigation-based Agricultural Activities of Capespan Namibia, Aussenkehr, //Karas Region.
The Environmental Clearance Certificate renewal is for: Activity 10.1 - Infrastructure (j) – Masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission. 2.1 Title of the Activity Operation of a Broadcasting Base Station at Erf 507, Tamariskia, Swakopmund. 2.2 Location of Activity The Broadcasting Base Station (BBS) is located on a portion of Erf 507, Tamariskia Extension 2, Swakopmund.
The operation of the existing Van der Walt Motors service station in Windhoek, Khomas Region.
The operation of the existing Bach Street Puma service station in Windhoek, Khomas Region.
The operation of the existing Rhino Park service station in Windhoek, Khomas Region.
Reptilia Crocodile Farm and Park intends to construct and operate a crocodile farm in Usakos, to breed the Nile crocodiles for conservation purposes, tourism and hide production. The proposed site is located southwest of the Khan River on a portion of the remainder portion of farm Usakos. The component of the key activities envisaged includes the following: 1.
The ECC is for the proposed construction and operation of a telecommunication tower in Rocky Crest, Windhoek.
The ECC is for the proposed construction and operation of a telecommunication tower in Okuryangava in Windhoek.
The ECC is for a proposed telecommunication tower in Eros, Windhoek.
The proponent intends to carry out mineral exploration on Exclusive Prospecting Licence (EPL) 8841. The exploration process will involve geophysical surveys, stream sediment sampling, soil sampling, laboratory analysis, trenching, RC and diamond drilling. An environmental Assessment is needed to assess the potential environmental and socio-economic impacts as well as to achieve better developmental interventions through protecting human, physical, and biotic environments.
Attachment | Size |
---|---|
394_EIA_EPL 8841 in Karibib District.pdf | 2.79 MB |
394_EMP_EPL 8841 in Karibib District.pdf | 581.42 KB |
394_ECC Application_EPL 8841 in Karibib District.pdf | 284.14 KB |
394_Proof of Consultation_EPL 8841 in Karibib District.pdf | 2.73 MB |
394_Map_EPL 8841 in Karibib District.pdf | 86.24 KB |
394_Screening Notice_EPL 8841 in Karibib District.pdf | 99.51 KB |
Irrigation and Related Activities of Desert Fruit, //Karas Region, Namibia.
Application for ECC for closure of a Portion of Erf 9804, Extension 39 and the rezoning of Erf 9804 from 'Public Open Space' to 'Parastatal', Swakopmund, Erongo Region.
Attachment | Size |
---|---|
326_SR_Rezoning of Erf 9804_Swakopmund.pdf | 2.6 MB |
326_EMP_Rezoning of Erf 9804_Swakopmund.pdf | 535.01 KB |
326_ECC Application_Rezoning of Erf 9804_Swakopmund.pdf | 881.98 KB |
326_Proof of Consultation_Rezoning of Erf 9804_Swakopmund.pdf | 781.98 KB |
326_Map_Rezoning of Erf 9804_Swakopmund.pdf | 259.15 KB |
326_Screening Notice_Rezoning of Erf 9804_Swakopmund.pdf | 54.96 KB |
The existing municipal sewage treatment plant (STP) was commissioned in 2012 and replaced the old sewage treatment plant located in Tamariskia. The STP receives and treats all liquid waste generated from the town. The Municipality of Swakopmund obtained a Wastewater and Effluent Disposal Exemption permit for the operation of the STP which is valid until 2025. The STP does not have the required Environmental Clearance Certificate (ECC) since there was no environmental impact assessment (EIA) done at the time of its commissioning.
Amendment of ECC ML43 to include the construction of an Explosives Magazine.
Attachment | Size |
---|---|
304_Risk Assessment_Mining Licence 43 in Oranjemund.pdf | 66.95 KB |
304_ECC Application_Mining Licence 43 in Oranjemund.pdf | 391.98 KB |
304_ECC Old_Mining Licence 43 in Oranjemund.pdf | 440.72 KB |
304_Plan_Mining Licence 43 in Oranjemund.pdf | 444.78 KB |
ECC renewal application for Karingarab area in ML 43 and EPL 3749 for NAMDEB.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: Activity 5.1 – Land Use and Development Activities (a) – The rezoning of land from residential use to industrial or commercial use. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: Title of the Activity The Rezoning of Portion 32 of Portion 5 of the Farm Döbra No. 49, Brakwater form 'residential' to 'industrial'.
Akelii Mining cc seeks to operate their business activities within their proposed Exclusive Prospecting License (EPL 8555) in the Erongo Regions, in respect to Base and Rare Metals, Dimension Stone, Industrial Minerals and Precious Metals. Principally, Akelii Mining proposes to explore (desktop geological study, collection of bulk and or geological samples and identification of previous activity in the area where similar mineral mining were conducted) and to obtain bulk-samples for further laboratory analysis by use of hand-held equipment and to small degree drilling.
Attachment | Size |
---|---|
608_EMP_EPL 8555 Erongo Region.pdf | 121.54 KB |
608_EMP_EPL 8555 Erongo Region_0.pdf | 121.54 KB |
608_MME Consent_EPL 8555 Erongo Region.pdf | 402.74 KB |
608_Proof of Consultation_EPL 8555 Erongo Region.pdf | 1.25 MB |
608_NHC Consent_EPL 8555 Erongo Region.pdf | 190.49 KB |
608_Map_EPL 8555 Erongo Region.pdf | 292.14 KB |
608_Screening Notice_EPL 8555 Erongo Region.pdf | 207 KB |
Mining claim 73964-73973.
Attachment | Size |
---|---|
641_Proforma EC_Mining claim 73964_73973.pdf | 532.02 KB |
641_Environmental Questionaire_Mining claim 73964_73973.pdf | 900.09 KB |
Mining Claim 73528-73538.
Attachment | Size |
---|---|
640_Proforma EC_Mining 73528_73538.pdf | 568.05 KB |
640_Environmental Questionaire_Mining 73528_73538.pdf | 1.76 MB |
Semi precious stone on Mining Claim 72791-72795.
Mining Claim 73599-73608.
Attachment | Size |
---|---|
636_Proforma EC_Mining Claim 73599_73608.pdf | 639 KB |
636_Environmental Questionaire_Mining Claim 73599_73608.pdf | 2.59 MB |
Mining Claims 73719-73825.
Attachment | Size |
---|---|
635_Proforma EC_Mining Claim 73719_73825.pdf | 541.78 KB |
635_Environmental Questionaire_Mining Claim 73719_73825.pdf | 1.19 MB |
Mining Claims 73974 - 73983.
Attachment | Size |
---|---|
634_Proforma EC_Mining Claim 73974_73983.pdf | 529.98 KB |
634_Environmental Questionaire_Mining Claim 73974_73983_2022.pdf | 919.27 KB |
Semi-precious stones on Mining Claims 73706 and 73707.
Attachment | Size |
---|---|
633_Proforma EC_Mining Claims 73706_73707.pdf | 868.67 KB |
633_Environmental Questionaire_Mining Claims 73706_73707_2022.pdf | 3.71 MB |
221208000632: Mining Claims 71268, 71286 and 73478.
Attachment | Size |
---|---|
632_Proforma EC_Mining Claim 71268_71286_73478.pdf | 717.5 KB |
632_Environmental Questionaire_Mining Claim 71268_71286_73478.pdf | 920.45 KB |
Mining Claims 72527, 72528, 73630 and 73676.
Attachment | Size |
---|---|
631_Proforma EC_Mining Claim 72527_72528_73630_73676.pdf | 806.1 KB |
631_Environmental Questionaire_Mining Claim 72527_72528_73630_73676.pdf | 1006.68 KB |
The proponent intends to apply for the Rezoning of Erf 3156 located in Rundu Extension 7, from Single Residential with dentistry 1/300 to "Business" with density Bulk 1. The property (Erf 3156) is already occupied with a business property (Shebeen) thus, the proposed rezoning is necessary to formalize the existing situation in line with the Rundu Town Planning Scheme and obtain approval from the Urban and Regional Planning Board (URPB). This application has already been submitted on 06 September 2022.
Renewal of the ECC is for the proposed construction and operational activities on Erf 1239 in the fishing harbour of Walvis Bay.
Small scale mining on Mining Claims 73953-73959, Erongo Region.
Attachment | Size |
---|---|
629_Proforma EC_Mining Claims 73953_73959_Erongo Region.pdf | 680.48 KB |
629_Environmental Questionaire_Mining Claims 73953_73959_Erongo Region.pdf | 2.04 MB |
Small scale mining on Mining Claims 73940,73941,73942,73943, Erongo Region.
Small scale mining on Mining Claims 71866-71873, Karas Region.
Attachment | Size |
---|---|
627_Proforma EC_Mining Claims 71866_71873_Karas Region.pdf | 654.65 KB |
627_Environmental Questionaire_Mining Claims 71866_71873_Karas Region.pdf | 1.84 MB |
Small scale mining on Mining Claim 72574, Khomas Region.
Attachment | Size |
---|---|
626_Proforma EC_Mining Claim 72574_Khomas Region.pdf | 739.68 KB |
626_Consent Letter_Mining Claim 72574_Khomas Region.pdf | 1.4 MB |
Small scale mining on Mining Claim 72618, Erongo Region.
Attachment | Size |
---|---|
625_Proforma EC_Mining Claim 72618 Erongo Region.pdf | 575.14 KB |
625_Environmental Questionaire_Mining Claim 72618 Erongo Region.pdf | 930.63 KB |
Small scale mining on Mining Claims 72616-72617.
Attachment | Size |
---|---|
624_Proforma EC_Mining Claims 72616_72617.pdf | 555.6 KB |
624_Environmental Questionaire_Mining Claims 72616_72617.pdf | 942.36 KB |