These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2022, NamPower obtained an Environmental Clearance Certificate (ECC) for the operation and maintenance of operation and maintenance of existing 220kv Walmund - Kuiseb and 132 Kuiseb - Walvis Bay 1 and 2 Transmission lines Including Kuiseb and Walmund Substations and other associated infrastructures in Erongo Region.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2022 NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of the Gerus Transmission Station. NamPower would therefore like to apply for the renewal of the ECC for the Gerus Transmission Station to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Otjivero – Otjivero and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Leutwein - Omeya and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Van Eck - Matchless 1 electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for operation and maintenance of the Oamites - Oamites Military Base and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance Witvlei – Witvlei Farmers Reticulation and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for operation and maintenance of the Oanob - Oanob Dam electrical reticulation system and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Seeis - Seeis North and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Ombotozu - Ombotozu electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of the Von Bach Base - Osona reticulation and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for operation and maintenance of Ongeama - Ongeama electrical reticulation system and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of De Hoek - Talismanus electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Von Bach Booster 2 - Nubuamis electrical reticulation system and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Osona - Tower electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Detmond – Kutako electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of the Von Bach Booster 1 - Otjihavera reticulation and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as “energy distribution, transmission and generation” requires an Environmental Clearance Certificate (ECC) as it is a listed activity.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of an ECC for Hoffnung - Kapps and Hoffnung - Hoffnung Farm Reticulation System Including NBC Indoor Substation and other associated Infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Seeis - Dordabis and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Blumfelde - Hoachanas electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of the Aris - Aris electrical reticulation system and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Omaere - Dorsland and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Omaheke - Drimiopsis electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Hochfeld – Hochfeld 1 electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of an ECC for Hoffnung - Kapps and Hoffnung - Hoffnung Farm Reticulation System Including NBC Indoor Substation and other associated Infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Gobabis – Gobabis and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of an ECC for Von Bach Booster 2 - Döbra and Von Bach Booster 2 - Brakwater Reticulation System including other associated Infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Groot Aub - Groot Aub and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of an ECC for Omaere - Buitepos and Omaere - Kroonster Reticulation System including other associated Infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as “energy distribution, transmission and generation” requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Witvlei – Abbatoir and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
| Attachment | Size |
|---|---|
| 6145_EMP_Witvlei_abbatoir electrical reticulation system.pdf | 920.57 KB |
| Attachment | Size |
|---|---|
| 5867_EMP_Luderitz Water Supply Scheme.pdf | 594.42 KB |
| 5867_Declaration of Authorship_Luderitz Water Supply Scheme.pdf | 56.5 KB |
| 5867_ECC Old_Luderitz Water Supply Scheme.pdf | 68.14 KB |
| 5867_Map_Luderitz Water Supply Scheme.pdf | 293.46 KB |
| 5867_Screening Notice_Luderitz Water Supply Scheme.pdf | 11.79 KB |
| 5867_CV_Luderitz Water Supply Scheme.pdf | 163.59 KB |
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of the Konkiep - Bethanie electrical reticulation system and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
| Attachment | Size |
|---|---|
| 5868_EMP_Rosh Pinah Water Supply Scheme.pdf | 627.72 KB |
| 5868_Declaration of Authorship_Rosh Pinah Water Supply Scheme.pdf | 56.8 KB |
| 5868_ECC Old_Rosh Pinah Water Supply Scheme.pdf | 66.46 KB |
| 5868_Map_Rosh Pinah Water Supply Scheme.pdf | 311.47 KB |
| 5868_Screening Notice_Rosh Pinah Water Supply Scheme.pdf | 11.8 KB |
| 5868_CV_Rosh Pinah Water Supply Scheme.pdf | 163.59 KB |
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Aussenkehr - Aussenkehr North and South electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
| Attachment | Size |
|---|---|
| 5864_EMP_Gabis Water Supply Scheme.pdf | 438.79 KB |
| 5864_Declaration of Authorship_Gabis Water Supply Scheme.pdf | 56.18 KB |
| 5864_ECC Old_Gabis Water Supply Scheme.pdf | 76.49 KB |
| 5864_Map_Gabis Water Supply Scheme.pdf | 329.34 KB |
| 5864_CV_Gabis Water Supply Scheme.pdf | 163.59 KB |
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of the existing Kokerboom - Tses reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
| Attachment | Size |
|---|---|
| 5865_EMP_Gainachas Water Supply Scheme.pdf | 463.1 KB |
| 5865_Declaration of Authorship_Gainachas Water Supply Scheme.pdf | 55.13 KB |
| 5865_ECC Old_Gainachas Water Supply Scheme.pdf | 74.81 KB |
| 5865_Map_Gainachas Water Supply Scheme.pdf | 309.28 KB |
| 5865_Screening Notice_Gainachas Water Supply Scheme.pdf | 11.8 KB |
| 5865_CV_Gainachas Water Supply Scheme.pdf | 163.59 KB |
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the Lüderitz - Namibia Airports Company reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
| Attachment | Size |
|---|---|
| 5866_EMP_Kombat Mine Water Supply Scheme.pdf | 601.82 KB |
| 5866_Declaration of Authorship_Kombat Mine Water Supply Scheme.pdf | 54.81 KB |
| 5866_ECC Old_Kombat Mine Water Supply Scheme.pdf | 73.88 KB |
| 5866_Map_Kombat Mine Water Supply Scheme.pdf | 319.78 KB |
| 5866_Screening Notice_Kombat Mine Water Supply Scheme.pdf | 11.8 KB |
| 5866_CV_Kombat Mine Water Supply Scheme.pdf | 163.59 KB |
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for operation and maintenance of the Lorelei - Orange River and Lorelei - Spitskop including associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for 22kV Karas T-off - Grünau and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2021 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Otjikoto - Tsumeb transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Otjikoto - Tsumeb transmission line to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for Keetmanshoop - Naute in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for 66kV Aranos - Stampriet to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. This transmission line runs from Aranos substation to Stampriet substation in Hardap region and is 76.9 km in length. The line is constructed with wooden H - Pole structures.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for the operation and maintenance of Khurub – Noordoewer reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for 66kV Aus - Aus to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. The 11kV Aus - Aus power line is 16.9 km in length.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for existing 22kV Koichab T-off - Koichab in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
| Attachment | Size |
|---|---|
| 5653_EMP_22kV Koichab T_off_ Koichab.pdf | 849.98 KB |
| 5653_Declaration of Authorship_22kV Koichab T_off_ Koichab.pdf | 226.52 KB |
| 5653_Map_22kV Koichab T_off_ Koichab.pdf | 397 KB |
| 5653_CV_22kV Koichab T_off_ Koichab.pdf | 1.49 MB |