Title:
250408005642: The application for the Environmental Clearance for the operation and maintenance of an existing Aussenkehr - Aussenkehr North and South electrical reticulation system including Aussenkehr Substation and other associated infrastructures
Author(s):
Publication Year:
2025
Abstract:

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Aussenkehr - Aussenkehr North and South electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. This reticulation system runs northwards and southwards of Aussenkehr Substation along various routes supplying electricity to the farming community in and around Aussenkehr area in the // Kharas Region. This reticulation system is 38.8 km in length and is constructed with wooden pole structures. Aussenkehr substation covers an area of about 5 893 m². Other associated infrastructures are Aussenkehr Dam Substation, Namibia Grape Substation, New River Pump Station and River Pump substation as indicated on the map and they cover a footprint of about 152 m², 94.8 m², 75.4m² and 92.8 m² respectively.

Item Type:
Report
Language:
en
Last date for commenting on this EIA: Monday, 23 June 2025

This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.