These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Renewal of validity period for the: Environmental Clearance for the construction and operation of a new sewerage pump station and rising main in Kuisebmond, Walvis Bay, Erongo Region. The Environmental Clearance Certificate issued expired on 04 August 2024. The construction of the new sewerage pump station and rising main in Kuisebmond could not be done within the validity period of the environmental clearance certificate, as the bid for construction was cancelled on two occasions. Procurement Bid No.
Attachment | Size |
---|---|
5419_SR_EPL 9121 at Opuwo Area.pdf | 1.5 MB |
5419_EMP_EPL 9121 at Opuwo Area.pdf | 546.61 KB |
5419_Declaration of Authorship_EPL 9121 at Opuwo Area.pdf | 185.4 KB |
5419_Proof of Consultation_EPL 9121 at Opuwo Area.pdf | 4.29 MB |
5419_Map_EPL 9121 at Opuwo Area.pdf | 205.66 KB |
5419_NHC Letter_EPL 9121 at Opuwo Area.pdf | 152.93 KB |
5419_Screening Notice_EPL 9121 at Opuwo Area.pdf | 110.13 KB |
5419_CV_EPL 9121 at Opuwo Area.pdf | 179.38 KB |
Attachment | Size |
---|---|
5417_SR_EPL 9547 at Opuwo Area.pdf | 1.84 MB |
5417_EMP_EPL 9547 at Opuwo Area.pdf | 550.89 KB |
5417_Declaration of Authorship_EPL 9547 at Opuwo Area.pdf | 185.57 KB |
5417_Proof of Consultation_EPL 9547 at Opuwo Area.pdf | 4.29 MB |
5417_Consent Letter_EPL 9547 at Opuwo Area.pdf | 173.53 KB |
5417_Map_EPL 9547 at Opuwo Area.pdf | 123.57 KB |
5417_NHC Letter_EPL 9547 at Opuwo Area.pdf | 152.93 KB |
5417_Screening Notice_EPL 9547 at Opuwo Area.pdf | 109.68 KB |
5417_CV_EPL 9547 at Opuwo Area.pdf | 179.38 KB |
The Environmental Clearance Certificate being renewed and amended is for the Layout Approval and Township Establishment on Consolidated Erf 2579, Tsumeb.
RE-ISSUE OF CLERANCE CERTIFICATE FOR WASTE MANBAGEMEBNT DISPOSAL: :I make reference to the letter from the then EC Mr. T. Nghitila, dated 21 November 2018 (find attached). Due to COVID 19, Zovu Elephant Lodge was closed and has only now as of 1 March 2024, commenced with their operation.
The Proponent ascribes to environmental, social, and governance (ESG) practices. The Proponent would like to meet demand for housing in Katima Mulilo Town but with minimal negative environmental and social impacts. The proponent understands Township Establishment of the proposed Katima Mulilo Extensions 55 and 56 on Erf 2818 Katima Mulilo Extension 10, creation of street and installation of services will have negative environmental and social impacts. For this reason, the Proponent commits to renew the current ECC before undertaking the proposed construction of houses.
NamPower’s focus remains on expanding renewable energy. The Omburu Power Project showcases NamPower's commitment to affordable, renewable energy. By harnessing the power of the sun, we reduce costs and meet our nation's energy needs sustainably. The Omburu (with a current capacity of 20 MW) Solar PV Power Station, NamPower’s first fully owned and operated renewable energy project, serves as an exemplary demonstration of the capabilities of such technologies.
Attachment | Size |
---|---|
5404_EMP_Kaap Agri Rehoboth Service Station.pdf | 825.41 KB |
5404_Declaration of Authorship_Kaap Agri Rehoboth Service Station.pdf | 155.69 KB |
5404_Map_Kaap Agri Rehoboth Service Station.pdf | 381.44 KB |
5404_Screening Notice_Kaap Agri Rehoboth Service Station.pdf | 135.03 KB |
5404_CV_Kaap Agri Rehoboth Service Station.pdf | 192.16 KB |
The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
Attachment | Size |
---|---|
4617_SR_EPL 9652_Erongo Region.pdf | 2.51 MB |
4617_EMP_EPL 9652_Erongo Region.pdf | 1.3 MB |
4617_MME Grant_EPL 9652_Erongo Region.pdf | 6.02 MB |
4617_Receipt_EPL 9652_Erongo Region.pdf | 47.87 KB |
4617_Proof of Consultation_EPL 9652_Erongo Region.pdf | 666.68 KB |
4617_Map_EPL 9652_Erongo Region.pdf | 487.79 KB |
4617_NHC Consent_EPL 9652_Erongo Region.pdf | 129.44 KB |
4617_Screening Notice_EPL 9652_Erongo Region.pdf | 254.93 KB |
4617_CV_EPL 9652_Erongo Region.pdf | 359.76 KB |
The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
Attachment | Size |
---|---|
4616_SR_EPL 9725_Erongo Region.pdf | 2.61 MB |
4616_EMP_EPL 9725_Erongo Region.pdf | 1.3 MB |
4616_MME Grant_EPL 9725_Erongo Region.pdf | 5.81 MB |
4616_Receipt_EPL 9725_Erongo Region.pdf | 47.87 KB |
4616_Proof of Consultation_EPL 9725_Erongo Region.pdf | 666.69 KB |
4616_Map_EPL 9725_Erongo Region.pdf | 505.68 KB |
4616_NHC Consent_EPL 9725_Erongo Region.pdf | 122.49 KB |
4616_Screening Notice_EPL 9725_Erongo Region.pdf | 255.62 KB |
4616_CV_EPL 9725_Erongo Region.pdf | 359.76 KB |
Attachment | Size |
---|---|
3122_ESA_EPL 9012_north of Cape Cross.pdf | 1.9 MB |
3122_EMP_EPL 9012_north of Cape Cross.pdf | 364.42 KB |
3122_MME Grant_EPL 9012_north of Cape Cross.pdf | 170.86 KB |
3122_Proof of Consultation_EPL 9012_north of Cape Cross.pdf | 3.84 MB |
3122_Map_EPL 9012_north of Cape Cross.pdf | 107.65 KB |
3122_NHC Consent_EPL 9012_north of Cape Cross.pdf | 436.1 KB |
3122_Screening Notice_EPL 9012_north of Cape Cross.pdf | 58.46 KB |
3122_CV_EPL 9012_north of Cape Cross.pdf | 187.48 KB |
Attachment | Size |
---|---|
5503_EIA_Rezoning of Erf 1069_Outjo.pdf | 1.56 MB |
5503_EMP_Rezoning of Erf 1069_Outjo.pdf | 182.41 KB |
5503_Declaration of Authorship_Rezoning of Erf 1069_Outjo.pdf | 145.99 KB |
5503_ECC Old_Rezoning of Erf 1069_Outjo.pdf | 267.95 KB |
5503_Screening Notice_Rezoning of Erf 1069_Outjo.pdf | 93.2 KB |
5503_CV_Rezoning of Erf 1069_Outjo.pdf | 16.46 KB |
The Van Eck Power Station is located at the corner of Allen Street and Hosea Kutako Drive in the Northern Industrial Area, within the institutional boundaries of City of Windhoek Municipality. It is a Coal-Fired Power Station with a total of 4 generating units, each rated at 30 MW. The first two units (Unit 1 and Unit 2) were commissioned in 1972, while Unit 3 was commissioned in 1973 and Unit 4 in 1979. The station is recognizable by its two 103 meters high smokestacks or chimneys.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2022, NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of the Zambezi Transmission Station. NamPower would therefore like to apply for the renewal of the ECC for the Zambezi Transmission Station in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Attachment | Size |
---|---|
5497_EMP_Zambezi Transmission Station.pdf | 876.31 KB |
5497_Declaration of Authorship_Zambezi Transmission Station.pdf | 213.95 KB |
5497_ECC Old_Zambezi Transmission Station.pdf | 2.04 MB |
5497_Map_Zambezi Transmission Station.pdf | 791.43 KB |
5497_Screening Notice_Zambezi Transmission Station.pdf | 35.48 KB |
5497_CV_Zambezi Transmission Station.pdf | 1.67 MB |
Attachment | Size |
---|---|
5490_EMP_Khan Substation in Usakos.pdf | 1.81 MB |
5490_Declaration of Authorship_Khan Substation in Usakos.pdf | 212.04 KB |
5490_ECC Old_Khan Substation in Usakos.pdf | 122.09 KB |
5490_Map_Khan Substation in Usakos.pdf | 118.11 KB |
5490_Screening Notice_Khan Substation in Usakos.pdf | 143.7 KB |
5490_CV_Khan Substation in Usakos.pdf | 588.47 KB |
Attachment | Size |
---|---|
5514_EIA_Rezoning of Erf 1069_Outjo.pdf | 1.8 MB |
5514_EMP_Rezoning of Erf 1069_Outjo.pdf | 261.97 KB |
5514_Declaration of Authorship_Rezoning of Erf 1069_Outjo.pdf | 185.28 KB |
5514_ECC Old_Rezoning of Erf 1069_Outjo.pdf | 285.01 KB |
5514_Screening Notice_Rezoning of Erf 1069_Outjo.pdf | 93.2 KB |
5514_CV_Rezoning of Erf 1069_Outjo.pdf | 16.46 KB |