Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 3851 - 3900 of 4271
Wednesday, 26 August 2020
2020. APP-001759: Mining Activities on Mining Claim NO. 71960 - 71962 at Karibib, Erongo Region.

Mining of semi-precious stones (Green Garnet).

Wednesday, 26 August 2020
APP-001760: Mining Activities on Claim NO. 71932- 71937 at Karibib, Erongo Region.

Mining of semi-precious stones (Andradite).

Tuesday, 25 August 2020
A. Speiser Environmental Consultants 2020. APP-001718: renewal of Environmental Clearance Certificate (ECC) for EPL 3345.

Commenting of the public on this project will expire at 12h00 on the 2020-08-25.

Tuesday, 25 August 2020
Tortoise Environmental Consultants (TEC) 2020. APP-00999: Environmental Management Plan for establishment of a poultry project at TOV Farm.

TOV Multipurpose center proposes to establish a poultry farming venture on its Plot 18 of Farm Oerwoud. Although poultry farming is not specified in the Listed Act, the proponent has been request to obtain an Environmental Clearance Certificate by the project funders. As such, an ECC is being applied for.

Monday, 24 August 2020
Mafuta Environmental Consultants 2020. APP-001615: Environmental Clearance Certificate (ECC) Renewal for the Sand/Gravel Mining Activities in the Onanime Village near Oshakati, Oshana Region.

Stantoll Properties CC (hereinafter referred to as Stantoll Properties or the Proponent) intends to continue with their sand/gravel mining activities from a sand/gravel bank in the Onanime Village, Okatana Constituency of the Oshana Region. The project has been in operation since October 2015 whereby the sand/gravel has been extracted from a burrow pit with an approximate surface area of 7 hectares (ha).

Monday, 24 August 2020
Green Earth Environmental Consultants 2020. APP-001732: Environmental Impact Assessment for the proposed construction of facilities and storage and handling of oil, petrolium (diesel and petrol) and gas production on Erven 112 and 113, Lafrenz, Windhoek.

Energy generation, transmission and storage activities - The construction of facilities for refining of gas, oil and petroleum products; Hazardous substance treatment, handling and storage - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.

Monday, 24 August 2020
Green Earth Environmental Consultants 2020. APP-001719: Environmental Impact Assessment and Environmental Management Plan for the renewal of the Environmental Clearance for the closure of Portion A of Erf 2588 (Mulderine Street) as street, the creation of Portion B of Erf 2590 as street and the construction of facilities and storage and handling of petroleum products on Erven 2589 and 2590 Walvis Bay.

Energy generation, transmission and storage facilities - The construction of facilities for the refining of gas, oil and petroleum products; Hazardous substance treatment, handling and storage - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.

Friday, 21 August 2020
NamPower 2020. APP-001727 - The operation of the 66KV Rehoboth-Blumfelde transmission line in Hardap Region.

The ECC is for the operation of 66kV Rehoboth - Blumfelde transmission line. 66kV Rehoboth - Blumfelde line was constructed IN 1996 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 21 August 2020
NamPower 2020. APP-001726: The operation of the 66KV Omburu-Uis transmission line in Erongo Region.

The ECC is for the operation of 66kV Omburu - Uis transmission line. The 66kV Omburu - Uis line was constructed was constructed in 1974 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 21 August 2020
NamPower 2020. APP-001725: The operation of the 66KV Gobabis-Omaere transmission line in Omaheke Region.

The ECC is for the operation of the 66kV Gobabis - Omaere transmission line. The 66kV Gobabis-Omaere line was constructed from 1992 and was commissioned in 1995 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 21 August 2020
NamPower 2020. APP-001724: The operation of the 66KV Gerus-Welwitchia transmission line in Otjozondjupa and Kunene Regions.

The ECC is for the operation of the 66kV Gerus -Welwitchia transmission line. 66kV Gerus – Welwitchia line was constructed in 1989 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 21 August 2020
Nghivelwa Planning Consultants 2020. APP-001722: Closure of Portion A of Erf 912, Omuthiya Extension 3 as a public open space and subsequent rezoning.

To close a portion of erf 912, Omuthiya Extension 3 as a public open space and subsequent rezoning, subdivision and consolidation to enable the Regional Government to formalise a house already constructed on the property.

Friday, 21 August 2020
Nghivelwa Planning Consultants 2020. APP-001721: Township Establishment of Onyuulaye Proper and Onyuulaye Extension 1.

For the township establishment of Onyuulaye Proper and Extension 1 in Onyuulaye Settlement in Oshikoto Region.

Friday, 21 August 2020
Environmental Compliance Consultancy (ECC) 2020. APP-001720: Proposed Otjikoto Agricultural Project on Farm Erhardshof 575, Otjozondjupa Region, Namibia.

The environmental clearance certificate is for the proposed agriculture project for farm Erhardshof 575, Otjozondjupa region, Namibia The proposed project will be located on Farm Erhardshof 575, which is approximately 3 522 hectares in size, of which the total irrigated project size at the final phase will be 135 hectares. The intention is to initially plant fodder for cattle such as Katambora Rhodes grass as well as rotational grain crops such as maize and wheat.

Friday, 21 August 2020
Stubenrauch Planning Consultants 2020. APP-001688: Environmental Assessment for the Subdivision, Permanent Closure, Consolidation and Rezoning of Erf 695, Erf 502 and Erf 683, Nkurenkuru Extension 1.

The environmental clearance certificate is for: Activity 5.1 (d) Infrastructure The rezoning of land from use for nature conservation or zoned open space to any other land use. Activity 10.1 (b) (Infrastructure) The construction of - Public roads. Activity 10.2 (a) (Infrastructure) The route determination of roads and design of associated physical infrastructure where - it is a public road. The Proponent intends to subdivide Erf 502, Nkurenkuru Extension 1 into Erf A and the Remainder.

Friday, 21 August 2020
Erongo Consulting Group 2020. APP-001638: Construction of the Swakopmund Smallholdings potable water reservoir on remainder of Portion 79 of the Swakopmund Town and Townlands 41, Erongo.

The ECC application is for the construction of the proposed Swakopmund Smallholding Potable Water Reservoir, and it will consist of the following main elements: • Supply and installation of a prefabricated water treatment plant including all fittings and accessories: • Construction of a concrete storage tank The reservoir will be a reinforced concrete structure, and will have a round shape with a smooth surface. The round shape of the reservoir will result in the strongest and most cost effective solution.

Friday, 21 August 2020
Healthy Earth Environmental Consultants (HEEC) 2020. APP-001620: Environmental Impact Assessment Report for the Proposed 5 MW Solar Photovoltaic Power Plant with 33 kV Powerline next to the NamPower Otjongava Substation at Oukongo - Okomize Village, Epupa Constituency, Kunene Region, Namibia.

The proponents intents to establish and operate the proposed 5 MW Solar Photovoltaic Power Plant with 33 kV Powerline next to the NamPower Otjongava Substation at Oukongo–Okomize Village, Epupa Constituency, Kunene Region, Namibia.

Friday, 21 August 2020
Van Der Westhuizen Town Planning and Properties 2020. APP-001608: Permanent Closure of a Portion of Abalone Avenue, Mile 4, Swakopmund, Erongo Region.

Permanent Closure of a Portion of Abalone Avenue, Mile 4, Swakopmund in order to consolidate such closed street portion with Erf 40, Mile 4, Swakopmund.

Friday, 21 August 2020
Geo Pollution Technologies 2020. APP-001153: Environmental Scoping Assessment and Environmental Management Plan for the Construction and Operations of a Fuel Retail Facility and Truck Port in Katima Mulilo.

ECC is for the Construction and Operations of a Fuel Retail Facility and Truck Port in Katima Mulilo.

Friday, 21 August 2020
2020. APP-001056: Sand Mining Activities at Omakango No. 1, No. 2 and No. 3, Endola Constituency, Ohangwena Region.

Sand mining activities for Oukwanyama Traditional Authority.

Friday, 21 August 2020
2020. APP-001651: Mining Activities on Mining Claim No. 70488-70490 at Otjimuhaka, Kunene Region.

Mining of semi-precious stones (Blue Sodalite).

Friday, 21 August 2020
2020. APP-001717: Mining Activities on Mining Claim No. 71579 at Karibib, Erongo Region.

Mining of semi- precious stones ( Quartz).

Friday, 21 August 2020
2020. APP-001716: Mining Activities on Mining Claim No. 72031-72033 at Sesfontein, Opuwo District, Kunene Region.

Mining of semi-precious stones.

Friday, 21 August 2020
2020. APP-001700: Mining Activities on Mining Claim No. 72016 at Farm Ram Kamp, Kamanjab, kunene Region.

Mining of semi-precious stones.

Friday, 21 August 2020
2020. APP-001699: Mining Activities on Mining Claim No. 72034-72036 at Sesfontein, Opuwo District, Kunene Region.

Mining of semi-precious Stones.

Friday, 21 August 2020
2020. APP-001696: Mining Activities on Mining Claim No. 71710-71712 at Farm Tsawises-93, Usakos, Erongo Region.

Mining of semi-precious stones.

Friday, 21 August 2020
2020. APP-001695: Mining Activities on Mining Claim No. 70121-70123 at Fyndraai, Khomas Region.

Mining of semi-precious stones.

Friday, 21 August 2020
2020. APP-001694: Mining Activities on Mining Claim No. 72028-72030 at Sesfontein, Kunene Region.

Mining of semi-precious stones.

Friday, 21 August 2020
2020. APP-001693: Mining Activities on Mining Claim No. 72011-72012, Zambazi Region.

Mining of semi-precious stones.

Friday, 21 August 2020
2020. APP-001692: Mining Activities on Mining Claim No. 72004-72008 at Rosh Pina, Karas Region.

Mining of semi-precious stones.

Friday, 21 August 2020
2020. APP-001656: Mining Activities on Mining Claim No. 71802-71803 at Farm Freyer No. 671, Kunene Region.

Mining of semi-precious stones.

Friday, 21 August 2020
2020. APP-001655: Mining Activities on Mining Claim No. 71799-71801 at farm Goeigeluk, Karibib, Erongo Region.

Mining of semi-precious stones.

Friday, 21 August 2020
2020. APP-001654: Mining Activities on Mining Claim No. 71515 at Otjikukutu, Kunene Region.

Mining of semi-precious stones.

Friday, 21 August 2020
2020. APP-001653: Mining Activities on Mining Claim No. 70370-70372 at Okongava 72, Karibib District , Erongo Region.

Mining of semi- precious stones ( Tourmaline).

Friday, 21 August 2020
2020. APP-001652: Mining Activities on Mining Claim No. 71855-71857 at Farm Estoll Rospoort, Kunene Region.

Mining of semi-precious stones.

Friday, 21 August 2020
Green Earth Environmental Consultants 2019. APP-001744: Proposed exploration and small-scale test mining activities for semi-precious stones, precious metals and base and rare metals on Exclusive Prospecting License (EPL) 6952, Katima Mulilio, Zambezi Region.

Exploration and small-scale test mining activities, Katima Mulilo.

Thursday, 20 August 2020
2020. APP-001666: Mining Activities on Mining Claim No. 71416-71419 at Post 5 Goabeb, Erongo Region.

Mining of semi-precious stones.

Thursday, 20 August 2020
Impala Environmental Consulting 2020. APP-001665: Environmental Impact Assessment for mineral exploration on EPL 7261.

Environmental Impact Assessment for mineral exploration on EPL 7261.

Thursday, 20 August 2020
2020. APP-001664: Mining Activities on Mining Claim No. 71946-71950 at Lüderitz, Karas Region.

Mining of semi-precious stones (Quartz crystals).

Thursday, 20 August 2020
2020. APP-001662: Mining Activities on Mining Claim No. 71992-71994 at Sesfontein, Kunene Region.

Mining of semi-precious stones.

Thursday, 20 August 2020
2020. APP-001661: Mining Activities on Mining Claim No. 71995-71998 at Saul Stratte, Kunene Region.

Mining of semi-precious stones.

Thursday, 20 August 2020
2020. APP-001659: Mining Activities on Mining Claim No. 72000-72001 at Omaruru, Erongo Region.

Mining of semi-precious Stones ( Fluorite).

Wednesday, 19 August 2020
Erongo Consulting Group 2020. APP-001649: Subdivision: Creation of A Public Road (Portions 180 and 181 of Remainder of Portion B of Swakopmund Town and Townlands No.41 into 12 Portions and Remainder), Swakopmund, Erongo Region, Namibia.

The creation of a Public Street / Road on Portions 180 and 181 of Remainder of Portion B of Swakopmund Town and Townlands No. 41, that will givs access to some of the newly created portions. The proposed public street obtains direct access from Tsavorite Street, and Henties Bay Road. The proposed public street is designed to be an 18m. wide cul-de-sac street. The proposed public street is designed to Swakopmund Council, Ministry of Urban and Rural Development and accepted traffic engineering design standards.

Wednesday, 19 August 2020
Conserver Investment 2020. APP-001436: Environmental Impact Assessment for the proposed Shopping Mall/complex on portion 1278, Extension 4 of Rundu Town, Kavango East Region, Namibia.

Construction and operation of a Shopping mall.

Tuesday, 18 August 2020
Erongo Consulting Group 2020. APP-001621: The Proposed Integrated Animal and Crop Farming and Related Infrastructure at Mubiza Village, Katima Mlilo, Namibia.

The EIA Process and the purpose of this EIA study is to identify the direct and indirect impacts that the development - Integration of crop, pasture, and livestock - , will have on the natural resources, eco-system, and the socio-economic dimensions of the neighbouring communities and populations. The integrated farming system is a commonly used term to explain a more integrated approach to farming compared to monoculture approaches.

Tuesday, 18 August 2020
Environmental Compliance Consultancy (ECC) 2020. APP-001426: Pilot sustainable water supply project by means of desalination, powered by solar to supplement water supply for Walvis Bay, Erongo Region, Namibia.

Application for the proposed pilot sustainable water supply project by means of desalination, powered by solar to supplement water supply for Walvis Bay Erongo Region. Listed activities triggered by the project include: Energy generation, transmission and storage activities 1. The construction of facilities for - (a) the generation of electricity; (b) the transmission and supply of electricity; Water resource develeopments 8.1 The abstraction of groundwater and surface water industrial or commercial purposes 8.12 The release of brine back into the ocean by desalination plants.

Monday, 17 August 2020
Risk-Based Solutions (RBS) 2020. APP-001686: Proposed Exploration/Prospecting in the Exclusive Prospecting License (EPL) No. 6667, Opuwo/Ruacana Districts, Kunene/Omusati Regions north-western Namibia.

Application for the transfer of the ECC was granted on the 14th September 2018 to the previous license holder / Proponent, KDN Geo Consulting CC. This ECC need to be transferred to the current license holder / Proponent, Philco One Hundred and Seventy-Three (173) (Pty) Ltd.

Not found what you are looking for? Amend your search...