Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 50 of 222
Monday, 11 August 2025
NamPower 2025. 250717006148: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Hochfeld - Hochfeld 1 electrical reticulation system including Hochfeld Substation and Otjinene Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of an ECC for Hoffnung - Kapps and Hoffnung - Hoffnung Farm Reticulation System Including NBC Indoor Substation and other associated Infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 11 August 2025
NamPower 2025. 250717006138: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Gobabis - Gobabis electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Gobabis – Gobabis and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 11 August 2025
NamPower 2025. 250717006139: The application for the for the Environmental Clearance Certificate for the operation and maintenance of an existing von Bach Booster 2 - Döbra and von Bach Booster 2 - Brakwater electrical reticulation system including other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of an ECC for Von Bach Booster 2 - Döbra and Von Bach Booster 2 - Brakwater Reticulation System including other associated Infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 11 August 2025
NamPower 2025. 250717006140: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Groot Aub - Groot Aub electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Groot Aub - Groot Aub and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 11 August 2025
NamPower 2025. 250717006141: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Omaere - Buitepos and Omaere - Kroonster electrical reticulation system including other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of an ECC for Omaere - Buitepos and Omaere - Kroonster Reticulation System including other associated Infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 11 August 2025
NamPower 2025. 250717006147: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Hochfeld - Hochfeld 1 electrical reticulation system including Hochfeld Substation and Otjinene Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Hochfeld – Hochfeld 1 electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 4 August 2025
NamPower 2025. 250717006145: The application for the Environmental CLearance Certificate for the operation and maintenance of an existing Witvlei - abbatoir electrical reticulation system and associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as “energy distribution, transmission and generation” requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for Witvlei – Abbatoir and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 26 June 2025
ACE Projects Consultants 2025. 250421005727: Environmental Impact Assessment for the proposed waste water treatment plant upgrade, Katima Mulilo, Zambezi Region.
The ECC application is made in order to comply to the EMA act no 7 of 2007 and its regulations of 2013. The ECC is for the proposed upgrade of the waste treatment plant to ensure it caters for the current and future population of Katima Mulilo.
Monday, 23 June 2025
NamPower 2025. 250424005745: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Konkiep - Bethanie electrical reticulation system including Bethanie Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of the Konkiep - Bethanie electrical reticulation system and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 23 June 2025
NamPower 2025. 250408005642: The application for the Environmental Clearance for the operation and maintenance of an existing Aussenkehr - Aussenkehr North and South electrical reticulation system including Aussenkehr Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Aussenkehr - Aussenkehr North and South electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 23 June 2025
NamPower 2025. 250409005661: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Kokerboom - Tses electrical reticulation system including Tses Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of the existing Kokerboom - Tses reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 23 June 2025
NamPower 2025. 250424005743: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Lüderitz - Namibia Airports Company electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the Lüderitz - Namibia Airports Company reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 23 June 2025
NamPower 2025. 250424005744: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Lorelei - Orange River and Lorelei - Spitskop electrical reticulation system including associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for operation and maintenance of the Lorelei - Orange River and Lorelei - Spitskop including associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005650: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Karas T-off - Grünau electrical reticulation system including Karas T-off substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for 22kV Karas T-off - Grünau and associated infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250409005666: The application to renew the Environmental Clearance Certificate for the operation and maintenance of an existing 66kv Otjikoto - Tsumeb 1 and 2 transmission lines including Tsumeb Substation and other associated infrustructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2021 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Otjikoto - Tsumeb transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Otjikoto - Tsumeb transmission line to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005651: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Keetmanshoop - Naute electrical reticulation system including Naute Dam base substation and Naute Dam booster 1 and other associated infrastructure.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for Keetmanshoop - Naute in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005640: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 66kv Aranos - Stampriet transmission line including Aranos substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for 66kV Aranos - Stampriet to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. This transmission line runs from Aranos substation to Stampriet substation in Hardap region and is 76.9 km in length. The line is constructed with wooden H - Pole structures.

Monday, 26 May 2025
NamPower 2025. 250408005652: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Khurub - Noordoewer electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for the operation and maintenance of Khurub – Noordoewer reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005641: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 11kv Aus - Aus electrical reticulation system line and associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for 66kV Aus - Aus to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. The 11kV Aus - Aus power line is 16.9 km in length.

Monday, 26 May 2025
NamPower 2025. 250408005653: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 22kv Koichab T-off - Koichab electrical reticulation system.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for existing 22kV Koichab T-off - Koichab in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005643: The application to renew the Environmental Clearance Certificate for the operation and maintenance of an existing 132kv Gerus - Whale Rock transmission line including Whale Rock substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2018, NamPower obtained the ECC for the 132 kV Gerus - Whale Rock transmission line has since expired. NamPower would therefore like to apply for the ECC for 132kV Gerus - Whale Rock including Whale Rock Substation to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005654: The application to renew the Environmental Clearance Certificate for the operation and maintenance of the existing 132kv Kokerboom - Namib 1 and 2 transmission lines and other associated infrustructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2015 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 132kV Kokerboom - Namib transmission line. NamPower would therefore like to apply for the renewal of the ECC for 132kV Kokerboom - Namib line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 26 May 2025
NamPower 2025. 250408005644: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 22kv Harib - Schonau distribution line.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for 22kV Harib - Schonau to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. The 22kV Harib - Schonau power line starts from Harib Substation and runs north-eastwards to Schonau in Warmbad area, //Karas region.

Monday, 26 May 2025
NamPower 2025. 250409005663: The application to renew the Environmental Clearance Certificate for the operation and maintenance of the existing Mariental - Gibeon electrical reticulation system including Gibeon Substation and other associated infrustructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the management and operation of the Mariental - Gibeon transmission line. NamPower would therefore like to apply for the renewal of the ECC for Mariental - Gibeon line to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. This ECC also includes Gibeon Substation.

Monday, 26 May 2025
NamPower 2025. 250408005648: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Karas T-off - Karasburg electrical reticulation system including karasburg other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for 22kV Karas T-off - Karasburg to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. The powerlines from this reticulation system run from Karas T-off substation southwards to Karasburg Substation, Karasburg area, Warmbad substation and various supply points in //Karas region.

Monday, 26 May 2025
NamPower 2025. 250409005665: The application to renew the Environmental Clearance Certificate for the operation and maintenance of the existing 66kv Osona - Okahandja transmission line including Okahandja Substation and Ongeama Substation and other associated infrustructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Osona - Okahandja transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Osona - Okahandja line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 22 May 2025
NamPower 2025. 250409005670: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Rock – Ariamsvlei electrical reticulation system including Ariamsvlei substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of existing Rock - Ariamsvlei electrical reticulation system to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 22 May 2025
NamPower 2025. 250410005675: The application to renew the Environmental Clearance Certificate for the operation and maintenance of the existing Stampriet - Glave electrical reticulation system and associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the maintenance and operation of the Stampriet - Glave reticulation system and associated infrastructures. NamPower would therefore like to apply for the renewal of the ECC for Stampriet - Glave line to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 22 May 2025
NamPower 2025. 250411005695: The application for the Environmental Clearance Certificate for the operation and maintenance of existing Nabas - Aroab and Nabas - Rietfontein electrical reticulation systems including Aroab Substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for the operation and maintenance of Nabas - Aroab and Nabas - Rietfontein electrical reticulation systems to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 22 May 2025
NamPower 2025. 250411005697: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Schlangkopf - dam electrical reticulation system including Schlangkopf - weir distribution line, dam substation, weir substation and other associated infrastructures.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of an ECC for Schlangkopf - Dam Reticulation System Including Schlangkopf - Weir distribution Line, Dam Substation, Weir Substation and other associated Infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 12 May 2025
ACE Projects Consultants 2025. 250421005731: ECC renewal for the continued operation of the Karibib 5mw solar plant and its associated transmission line to the Nampower Karibib Distribution Substation, Rrongo Region.
The ECC renewal application is done in order to comply to the EMA act no 7 of 2007 and its regulations of 2013. This will ensure that the project complies to the applicable laws.
Tuesday, 6 May 2025
NamPower 2025. 250415005709: Application for Environmental Clearance Certificate renewal for the existing operation, maintenance and upgrade of the existing Zambezi Substation - Zambezi Earth Electrode Line Station and associated infrastructure in Zambezi Region.
The Environmental Clearance Certificate is for operation, maintenance and upgrade of the existing Zambezi Earth Electrode line, Station and Associated infrastructure.
Tuesday, 1 April 2025
NamPower 2025. 250220005412: The renewal of the Environmental Clearance Certificate for the operation of the 55mw photovoltaic plant including associated infrastructures in Omaruru, Erongo Region.

NamPower’s focus remains on expanding renewable energy. The Omburu Power Project showcases NamPower's commitment to affordable, renewable energy. By harnessing the power of the sun, we reduce costs and meet our nation's energy needs sustainably. The Omburu (with a current capacity of 20 MW) Solar PV Power Station, NamPower’s first fully owned and operated renewable energy project, serves as an exemplary demonstration of the capabilities of such technologies.

Tuesday, 1 April 2025
NamPower 2025. 250224005425: Application for the Environmental Clearance Certificate for the upgrade and operation of the existing Lithops Transmission Substation and proposed Battery Energy Storage System (BESS), Erongo Region.
The ECC is for the upgrade and operation of the existing Lithops Transmission Substation and proposed Battery Energy Storage SYSTEM (BESS) .The substation is situated roughly 1.5 kilometers from the B2 main road, adjacent to the access road leading to the Husab Mine.
Monday, 31 March 2025
NamPower 2025. 250310005497: The renewal of the Environmental Clearance Certificate for the operation and maintenance of an existing Zambezi Transmission Station in Zambezi Region.

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2022, NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of the Zambezi Transmission Station. NamPower would therefore like to apply for the renewal of the ECC for the Zambezi Transmission Station in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Monday, 31 March 2025
NamPower 2025. 250312005517: The renewal of the Environmental Clearance Certificate for the operation and maintenance of Van Eck Power Station in Windhoek, Khomas Region.

The Van Eck Power Station is located at the corner of Allen Street and Hosea Kutako Drive in the Northern Industrial Area, within the institutional boundaries of City of Windhoek Municipality. It is a Coal-Fired Power Station with a total of 4 generating units, each rated at 30 MW. The first two units (Unit 1 and Unit 2) were commissioned in 1972, while Unit 3 was commissioned in 1973 and Unit 4 in 1979. The station is recognizable by its two 103 meters high smokestacks or chimneys.

Friday, 21 March 2025
ACE Projects Consultants 2025. 240623004028: Renewal of ECC for the construction of a fuel retail facility (Ombo Retail Station) in Okondjatu, Otjozondjupa Region.
This application is for the renewal of ECC for the construction of a fuel retail facility (Ombo Retail Station) in Okondjatu, Otjozondjupa Region. The application is made in order to comply with the EMA act no7 of 2007 and its regulations of 2013.
Thursday, 6 February 2025
NamPower 2025. 241211005063: The application for the renewal of the Environmental Clearance Certificate for the operation, maintenance of Auas Transmission Station and associated infrastructures in Khomas Region.

The ECC is the operation and maintenance of the Auas Transmission Station in Khomas Region. In 2020 NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of the Auas Transmission Station. NamPower would therefore like to apply for the renewal of the ECC for the Auas Transmission Station in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. Auas substation is located about 35 km outside Windhoek. The substation consists of low, medium and high voltage yards as well as storerooms, control rooms and offices.

Thursday, 19 December 2024
NamPower 2024. 241202005044: The application for the renewal of the Environmental Clearance Certificate for the operation, maintenance and upgrade of an existing Gerus - Gerus earth electrode line, station and other associated infrastructures in Otjozondjupa Region.

The Environmental Clearance Certificate for the operation, maintenance and upgrade of an existing Gerus - Gerus earth electrode line, station and other associated infrastructures in Otjozondjupa Region. The purpose of the earth electrode line and stations is to provide a current path when the 350 HVDC line is operated on earth mode. The 350 HVDC line may be operated under certain conditions in "earth return" mode. The 350 HVDC line may be operated under certain conditions in "earth return" return due to significant savings in power losses.

Wednesday, 18 December 2024
NamPower 2024. 241108004927: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 132kv Trekkopje - Wlotzka Transmission line including Wlotzka, Dolerite, Lichen Substations and other associated Infrastructure.

The ECC is for the operation and maintenance of an existing 132kv Trekkopje - Wlotzka Transmission line including Wlotzka, Dolerite, Lichen Substations And other associated Infrastructure. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity.

Wednesday, 18 December 2024
NamPower 2024. 241111004930: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 220kV Rössing– Lithops transmission line including Rössing substation and other associated infrastructures.

The ECC is for the operation and maintenance of an existing 220kV Rössing– Lithops transmission line including Rössing substation and other associated infrastructures Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for 220kV Rössing– Lithops in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Wednesday, 18 December 2024
NamPower 2024. 241111004931: The application for the Environmental Clearance Certificate for the operation and maintenance of the existing 330kV Ruacana - Kunene - Omburu transmission line and other associated infrastructures.

The ECC is for the operation and maintenance of the existing 330kV Ruacana - Kunene - Omburu transmission line and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. The 330kV Ruacana - Kunene - Omburu transmission line, was constructed before the promulgation of the Environmental Management Act (Act 7 of 2007) and its regulations, thus it did not obtain an ECC.

Wednesday, 18 December 2024
NamPower 2024. 241108004925: The application for the Environmental Clearance Certificate for the operation and maintenance of existing 132kv Lithops - Husab 1 and 2 transmission lines and other associated infrastructures.

The ECC is for the operation and maintenance of existing 132kv Lithops - Husab 1 and 2 transmission lines and other associated infrastructures. The construction of the 132kV Lithops - Husab 1 and 2 transmission lines was part of the ECC issued to Husab Mine. However, the powerline belongs to NamPower and would therefore like to apply for the ECC for the operation and maintenance of an existing 132kv Lithops - Husab 1 and 2 transmission lines in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241112004941: The application for the Environmental Clearance Certificate for the operation and maintenance of the existing 132kV Omatando - Okatope transmission line.

The ECC is for the operation and maintenance of the existing 132kV Omatando - Okatope transmission line. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. This transmission line was constructed before the promulgation of the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241111004935: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 132kv Lithops - Walmund transmission lines.

The ECC is for the operation and maintenance of an existing 132kv Lithops – Walmund transmission lines. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of the ECC for 220kV Lithops - Walmund in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241112004942: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 132kV Schlangkopf T-off - Schlangkopf transmission line including Schlangkopf substation and other associated infrastructures.

The ECC is for the operation and maintenance of an existing 132kV Schlangkopf T-off - Schlangkopf transmission line including Schlangkopf substation and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity.

Tuesday, 17 December 2024
NamPower 2024. 241112004936: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 400kv Kokerboom - Obib transmission line.

The ECC is for the operation and maintenance of an existing 400kv Kokerboom - Obib transmission line. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for 400kV Kokerboom – Obib transmission line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241112004943: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 66kV Van Eck - Osona transmission line including Osona T-off - Von Bach base and other associated infrastructures.

The ECC is for the operation and maintenance of an existing 66kV Van Eck – Osona transmission line including Osona T-off - Von Bach base and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for 66kV Van Eck– Osona in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241112004937: The application for the Environmental Clearance Certificate for the operation and maintenance of the 66kV Hardap - Stampriet transmission line including Stampriet substation and other associated infrastructures.

The ECC operation and maintenance of the 66kV Hardap – Stampriet transmission line including Stampriet substation and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. The 66kV Hardap - Stampriet, was constructed before the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241112004944: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 220kv Khan - Rössing transmission line.

The ECC is for the operation and maintenance of an existing 220kv Khan – Rossing transmission line. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. The 220kV Khan - Rossing was constructed before the promulgation of the Environmental Management Act (Act 7 of 2007) and its regulations.

Not found what you are looking for? Amend your search...