Title:
250411005697: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing Schlangkopf - dam electrical reticulation system including Schlangkopf - weir distribution line, dam substation, weir substation and other associated infrastructures
Author(s):
Publication Year:
2025
Abstract:

Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of an ECC for Schlangkopf - Dam Reticulation System Including Schlangkopf - Weir distribution Line, Dam Substation, Weir Substation and other associated Infrastructures to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. This powerlines in this electrical reticulation system start from Schlangkopf Substation towards Dam substation and to Weir Substation in the Neckartal Dam area in //Karas Region. This ECC includes Schlangkopf - Weir distribution line, Dam Substation and Weir Substation. Dam substation and Weir Substation cover a footprint of about 1 423 m² and 3 734 m² respectively. The Schlangkopf - Dam electrical reticulation system has a total length 20.9 km and is constructed with wooden structures. Figure 1 below shows the locality map for this electrical reticulation system.

Item Type:
Report
Language:
en
Last date for commenting on this EIA: Thursday, 22 May 2025

This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.