The ECC is the operation and maintenance of the Auas Transmission Station in Khomas Region. In 2020 NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of the Auas Transmission Station. NamPower would therefore like to apply for the renewal of the ECC for the Auas Transmission Station in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. Auas substation is located about 35 km outside Windhoek. The substation consists of low, medium and high voltage yards as well as storerooms, control rooms and offices. The lines connecting to the substation are: 400kV Auas - Kokerboom; 220kV Auas - Hardap 1 and 2; 220kV Van Eck - Auas 1, 2, and 3; 132 kV Auas - Omaere 1; 132 kV Auas - Naruchas.
Attachment | Size |
---|---|
5063_EMP_Auas Transmission Station.pdf | 795.13 KB |
5063_Declaration of Authorship_Auas Transmission Station.pdf | 132.1 KB |
5063_ECC Old_Auas Transmission Station.pdf | 1.7 MB |
5063_Map_Auas Transmission Station.pdf | 546.94 KB |
5063_CV_Auas Transmission Station.pdf | 1.03 MB |
This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.