The records can be filtered using the search boxes. Or leave this page and do a full search of all records.
Attachment | Size |
---|---|
2011_Specialist invertebrate study of the Omahola Project.pdf | 2.51 MB |
Attachment | Size |
---|---|
Scoping Report fo rthe Omahola Project.pdf | 4.67 MB |
Attachment | Size |
---|---|
Oshakati flood management strategy - background info.pdf | 1.4 MB |
Attachment | Size |
---|---|
Vegetation of the Inca_Tubas and Shiyela sites of Reptile Uranium Namibia_2010.pdf | 9.42 MB |
Attachment | Size |
---|---|
Vegetation Impact Assessment for the proposed expansion project at Langer Heinrich Uranium_2009.pdf | 15.7 MB |
Attachment | Size |
---|---|
Specialist Study Report_Visual Assessment_2009.pdf | 7.06 MB |
Attachment | Size |
---|---|
Report on a radiological public hazard assessment for Langer Heinrich_2009.pdf | 1.85 MB |
Attachment | Size |
---|---|
LHU_EIA_Report_27_Aug_2009__Chapter_1_to_Chapter_3.pdf | 16.93 MB |
Attachment | Size |
---|---|
Invertebrate Study of Langer Heinrich Uranium Mining Licence Area_2009.pdf | 2.14 MB |
Attachment | Size |
---|---|
Environmental baseline study of vertebrates in mining licence area 140_2009.pdf | 1.89 MB |
Attachment | Size |
---|---|
Langer Heinrich Uranium Expansion Project_Specialist soils and land capability studies_2009.pdf | 3.57 MB |
Attachment | Size |
---|---|
LHU_EIA_Report_27_Aug_2009_Appendix_J.pdf | 11.01 MB |
Attachment | Size |
---|---|
Appendix G_Air Study.pdf | 7.8 MB |
Attachment | Size |
---|---|
Flood assessments for the Gawib River at Langer Heinrich Uranium Mine.pdf | 2.9 MB |
Attachment | Size |
---|---|
2008_Trekkopje_Desalination_and_Pipeline_EIA.pdf | 16.39 MB |
Attachment | Size |
---|---|
Beyond species lists_Endemics and their use in environmental management in Namibia_2012.pdf | 192.39 KB |
Attachment | Size |
---|---|
Etango_ESIA_BID.pdf | 230.23 KB |
Attachment | Size |
---|---|
routing of power lines through least-cost path analysis and multicriteria evaluation to minimise environmental impacts.pdf | 678.41 KB |
Attachment | Size |
---|---|
Namdeb_ORM_LOM_Updated_Project_Description_December 2010.pdf | 1.3 MB |
Attachment | Size |
---|---|
Namdeb_DSR_Appendix_F.pdf | 1.11 MB |
Attachment | Size |
---|---|
Namdeb_ORM_LOM - FSR_Appendix_I.pdf | 176.22 KB |
Attachment | Size |
---|---|
Namdeb_ORM_LOM - FSR_Appendix_G.pdf | 261.64 KB |
Attachment | Size |
---|---|
Namdeb_DSR_Appendix_B.pdf | 416.92 KB |
Attachment | Size |
---|---|
Namdeb_DSR_Appendix_A.pdf | 996.78 KB |
Attachment | Size |
---|---|
Namdeb_ORM_LOM - FSR_Appendix_E.pdf | 2.74 MB |
Attachment | Size |
---|---|
Namdeb ORM LOM - Vegetation Assessment.pdf | 4.06 MB |
Attachment | Size |
---|---|
Namdeb_ORM_LOM - FSR_Appendix_B.pdf | 108.74 KB |
Attachment | Size |
---|---|
Namdeb ORM LOM - Invertebrate Assessment.pdf | 407.8 KB |
Attachment | Size |
---|---|
Namdeb_ORM_LOM - Final_Scoping_Report_March_2011.pdf | 2.13 MB |
Attachment | Size |
---|---|
Namdeb_ORM_LOM - FSR_Appendix_H.pdf | 159.16 KB |
Attachment | Size |
---|---|
Namdeb ORM LOM - River Ecology Assessment.pdf | 1.74 MB |
Attachment | Size |
---|---|
KIRLUP_SEA_final_report_2011-02-25.pdf | 3.88 MB |
Attachment | Size |
---|---|
App G_Avifauna Scoping.pdf | 636.12 KB |
Attachment | Size |
---|---|
Riverbank Wind Energy Facility.pdf | 7.59 MB |
Attachment | Size |
---|---|
Proposed Ilanga Solar Thermal Power Plant_2015.pdf | 9.15 MB |
Attachment | Size |
---|---|
Borutho_Witkop 400kV Transmission Line Project_201.pdf | 4.11 MB |
Attachment | Size |
---|---|
Environmental management plan for operation and maintenance of the Medupi Power Station_2009.pdf | 402.83 KB |
Attachment | Size |
---|---|
Mansfeld thesis.pdf | 3.15 MB |
Attachment | Size |
---|---|
EIA Power Lines Uubvlei to Obib Volume 2 Appendix_2005.zip | 4.07 MB |
Attachment | Size |
---|---|
EIA Power Lines Kudu Gas Power Station.zip | 1.79 MB |
Attachment | Size |
---|---|
EIA Kokerboom to Namib Substation_2004.zip | 2.54 MB |
Attachment | Size |
---|---|
Appendix EIA Auas Rehoboth_2006.zip | 2.41 MB |
Attachment | Size |
---|---|
Final EIA Report Auas Rehoboth 22 June_2006.zip | 2.62 MB |
Attachment | Size |
---|---|
EIA Skorpion Zinc 400kv power Transmission Line Project.pdf | 99.37 KB |
Attachment | Size |
---|---|
Vertebrate Fauna Report 220kV Transmission Line (Omburu Khan Kuiseb).pdf | 524.21 KB |
Attachment | Size |
---|---|
RAISON Socio-economics of Jatropha.pdf | 322.33 KB |
Attachment | Size |
---|---|
EIA 220kV transmission line Omburu to Kuiseb.pdf | 17.34 MB |
Attachment | Size |
---|---|
Preparing for an Assessment of Environmental Impacts from Onshore and Offshore Phosphate Mining Activities in Namibia.pdf | 12.77 MB |
Attachment | Size |
---|---|
EIA for proposed deep water exploration well drilling in Petroleum exploration license 39_2017.pdf | 8.39 MB |
Attachment | Size |
---|---|
Namibia_Strategic Expansion of the Walvis Bay Container Terminal Project_Executive ESIA Summary.pdf | 559.3 KB |