These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The project at Epembe, Ohangwena Region, Namibia, involves the development of a new secondary school by the Ministry of Education, Innovation, Youth, Sports, Arts and Culture, designed to accommodate up to 600 learners, including a hostel and teacher housing, on a 20-hectare site located at 17°47'00"S, 16°27'00"E.
The Development Workshop Namibia (DWN) is implementing the Project "Poverty-Oriented Development of Infrastructure in urban areas of Namibia" with financial support from KfW. The project seeks to contribute to more sustainable and inclusive urban development in Namibia by supporting DWN to plan and develop low-cost residential land with titles in 15 towns across Namibia.
Renewal Application: TeraSun Energy proposes to develop a 82 MWp PV Power Plant east of Arandis. To connect the proposed PV Power Plant with the national grid, a 132 kV interconnection overhead powerline between the PV Power Plant and the Lithops Substation southwest of Arandis is planned. The proposed powerline, which is the subject of this Environmental Clearance Certificate (ECC) Renewal Application, entails the following: 1.
The Development Workshop Namibia (DWN) is implementing the Project “Poverty-Oriented Development of Infrastructure in urban areas of Namibia” with financial support from KfW. The project seeks to contribute to more sustainable and inclusive urban development in Namibia by supporting DWN to plan and develop low-cost residential land with titles in 15 towns across Namibia.
Purpose of the ECC for EPL 10173 The Environmental Clearance Certificate (ECC) is a mandatory requirement for Exclusive Prospecting Licence (EPL) 10173, held by Frampton Investment CC. It ensures that prospecting activities in the Kunene Region, Opuwo Magisterial District, comply with environmental regulations and are conducted responsibly. Key Purposes of the ECC Authorization of Prospecting Activities: The ECC formally permits Frampton Investment CC to conduct prospecting activities, including drilling, trenching, and sampling, within the 19,680.7221-hectare area.
The project involves the establishment of a sophisticated bio-processing facility by Virgo Biotechnology Pty Ltd, a Namibian-owned enterprise, for the sustainable valorization of marine mammal biomass, specifically Cape Fur Seals (Arctocephalus pusillus pusillus). This industrial initiative, located on Portion 105 of Henties Bay Townland No. 133, encompasses a 25-hectare site designed to integrate advanced biotechnological processes for comprehensive resource utilization.
The Environmental Clearance Certificate (ECC) for the Fisherman’s Village Affordable Housing Project is required for the subdivision, rezoning, and development of Erf 5757, Kuisebmond, Walvis Bay, Erongo Region, Namibia.
Project Overview: Mixed Township and Breakwater Development in Henties Bay This project involves the development of a mixed-use township and breakwater on Portion 114 of the Henties Bay Townland No. 133. The primary objective is to establish a modern, eco-friendly development that aligns with local and international standards while boosting the socio-economic landscape of Henties Bay. Key Features: Land Use: A 25-hectare site south of Henties Bay, featuring 250 middle- and high-class houses, boutique hotels, a shopping mall, institutional land use, and public open spaces.
The proponent, Messrs Schmidtco Property Developers (Pty) Ltd, through Messrs Erongo Consulting Group, the Environmental Assessment Practitioner, is applying for the Environmental Clearance Certificate (ECC) for this township development project because it is a legal requirement under the Environmental Management Act (EMA) No. 7 of 2007 and the accompanying EIA Regulations (2012) in Namibia. The project involves substantial land use changes, construction, and development activities, which are likely to have significant environmental and social impacts. 1.
This application is for the Environmental Clearance Certificate (ECC) for the Development of a Net Zero Industrial Park: Wind Energy Farm Project at Arandis Townlands, Erongo Region, Namibia. This project is spearheaded by Zero Carbon Namibia and includes a 1GW wind and solar farm, a green hydrogen production facility, a green ammonia/green hydrogen export facility, and a green ammonia production facility. The ECC application is prepared in accordance with the Environmental Management Act (Act No. 7 of 2007) and specifically Regulation No. 29, Section 21.
This application is for the Environmental Clearance Certificate (ECC) for the Green Hydrogen, Ammonia Production, and Chemical Storage Facility. The ECC is essential for ensuring compliance with environmental regulations and promoting sustainable development. The application encompasses several key components: Environmental Impact Assessment (EIA): The ECC process includes conducting a thorough EIA to assess potential environmental impacts, such as effects on air quality, water resources, soil, flora, fauna, and community health.
Executive Summary: The acquisition of an Environmental Impact Assessment (EIA) license is mandated under section 27 of the Environmental Management Act (EMA) of 2007. This requirement applies to all relevant projects. An EIA project report was prepared by NEMA-registered experts at the request of the proponent to assess the environmental impacts of a proposed agricultural technologies business on farm Henties Bay Townland No. 133 in Erongo Region.
| Attachment | Size | 
|---|---|
| 4021_ESR_EPL 10131 in Erongo Region.pdf | 1.29 MB | 
| 4021_EMP_EPL 10131 in Erongo Region.pdf | 464.71 KB | 
| 4021_Minutes Focus Group Meeting_EPL 10131 in Erongo Region.pdf | 57.33 KB | 
| 4021_Proof of Consultation_EPL 10131 in Erongo Region.pdf | 2.23 MB | 
| 4021_Map_EPL 10131 in Erongo Region.pdf | 156.92 KB | 
| 4021_NHC Consent_EPL 10131 in Erongo Region.pdf | 77.92 KB | 
| 4021_Screening Notice_EPL 10131 in Erongo Region.pdf | 71.8 KB | 
| 4021_CV_EPL 10131 in Erongo Region.pdf | 595.26 KB | 
| Attachment | Size | 
|---|---|
| 4019_ESR_EPL 9924 in Erongo Region.pdf | 1.29 MB | 
| 4019_EMP_EPL 9924 in Erongo Region.pdf | 464.42 KB | 
| 4019_Minutes of Meeting_EPL 9924 in Erongo Region.pdf | 57.33 KB | 
| 4019_Proof of Consultation_EPL 9924 in Erongo Region.pdf | 2.23 MB | 
| 4019_Map_EPL 9924 in Erongo Region.pdf | 156.92 KB | 
| 4019_Screening Notice_EPL 9924 in Erongo Region.pdf | 71.8 KB | 
| 4019_CV_EPL 9924 in Erongo Region.pdf | 595.26 KB | 
The Locomotive and Wagon Workshop is a key component of the Net Zero Industrial Park project in Arandis Townlands, Namibia. Here’s an overview of what the workshop entails: Purpose Maintenance and Refurbishment: The workshop will be used for maintaining and refurbishing locomotives and wagons, ensuring they are operational and efficient. Hydrogen Conversion: It will also focus on converting locomotives and wagons to hydrogen power, aligning with the project's goal of reducing carbon emissions.
The Solar Facility within the Net Zero Industrial Park, the Environmental Clearance Certificate (ECC) application is essential for: 1. Establishing a 1GW solar farm as part of the broader project’s clean energy initiative, which aims to produce renewable energy that will support the operations of the park, including hydrogen production and other facilities. 2. Ensuring the sustainable generation of solar power, which will contribute to reducing carbon emissions and support Namibia's green energy transition. 3.
"PEL 83" is a Joint Venture between the block partners, namely Windhoek PEL 28 B.V. (a wholly-owned subsidiary of Galp Energia E&P B.V (i.e. Galp)), the National Petroleum Corporation of Namibia (NAMCOR) and Custos Investments. Galp holds an 80% controlling interest in Petroleum Exploration License (PEL) 83, while NAMCOR and Custos each hold 10%. Galp is currently the operator of PEL 83. Windhoek PEL28 B.V. (i.e.
Project Focus: This project centers on renewing the Environmental Management Plan (EMP) and Environmental Clearance Certificate (ECC) for a proposed healthcare facility on a 1.5-hectare public open space (Erf 6288) in Kuisebmond, Walvis Bay, Namibia. Environmental Compliance Renewal: The rezoning from public open space to institutional use necessitates an updated EMP to demonstrate continued adherence to Namibia's Environmental Management Act (EMA) and the principles established at the Earth Summit.
The Environmental Clearance Certificate (ECC) is sought for the proposed mixed-use township development on Portion X, Henties Bay Townland No. 133, in the Erongo Region of Namibia. This certificate is necessary to obtain official approval from regulatory authorities, specifically the Ministry of Environment, Forestry & Tourism, confirming that the proposed development complies with environmental regulations and standards.
HyIron intends to develop the Oshivela Green Iron Pilot Project, on Section 4 of Farm Bloemenhof 109 . The proposed project entails the production of “green” iron, i.e. without any CO2 emissions, by using renewable energy only and applying HyIron’s proprietary technology. The proposed pilot production phase is planned in the north-western section of Section 4 of Farm Bloemenhof 109 and includes the following: Production of 5 tons raw iron per hour (~ 3 000 hours per year), using hydrogen as a reduction agent during the product beneficiation, in a specialised industrial (airtight) furnace.
SLB proposes to establish and operate a Liquid Mud Plant (LMP) in the Port of Walvis Bay. The proposed LMP will be used to receive, handle, manufacture, mix, store and transfer a liquid drilling compound which is used by offshore oil riggs.
(An Application was submitted to MEFT: DEA and registered on the MEFT portal in July 2020. The MEFT Portal however experienced difficulties and this Application was lost. The EIA process has been completed and therefore a new Application is herewith lodged. The previous Application number was: APP-01678). Lodestone is proposing the construction of a proposed new bulk water supply pipeline from the Oanob dam to the mine. A pipeline route has been decided following gravel roads, which is the shortest route that follows close to existing roads.
Proposed Mixed-Use Township Development in Henties Bay, Namibia Kandjumbi Construction and Plumbing CC is proposing to develop a mixed-use township on a 25-hectare site in Henties Bay, Namibia. The project will include 200 houses, a 3-star hotel, a shopping mall, institutional land use, and affordable student accommodations. The project is expected to create 350-450 permanent jobs and will be in line with the Henties Bay Zoning Scheme of 2021 and the Henties Bay structure plan.
AMENDMENT APPLICATION: Kelp Blue, intends to cultivate Giant Kelp (Macrocystis pyrifera) at a commercial scale, off the coast of southern Namibia, near Lüderitz. Prior to them implementing the "commercial scale" cultivation project, Kelp Blue first develop a Pilot Project to provide important information and proof of their concept as well as monitoring of marine ecological aspects associated with the Pilot Project activities.
Renewal of the environmental clearance certificate (ECC-00901) for TeraSun Energy’s proposed PV Power Plant near Arandis in the Erongo Region.
The Dune 7 Concession, located within Dorob National Park in Walvis Bay, Namibia, has recently been awarded to Sandwich Dune Tours and Safari CC by the Ministry of Environment, Forestry, and Tourism Namibia. This concession has long been a popular recreational area, but its deteriorating state, characterized by littering, vandalized facilities, and inadequate infrastructure, has raised concerns among the public. In response, the Ministry undertook a renovation project to address these issues and improve the overall condition of the site.
Continuation of: Mining, processing and associated activities at the Langer Heinrich Mine. The Langer Heinrich Mine (LHM), situated in the Namib Naukluft National Park (NNNP) approximately 80 km to the east of Swakopmund in the Erongo Region of Namibia. The details relating to the ‘scale and scope’ of the proposed mining, processing and associated activities and facilities were included in the original (approved) EIA reports (stage 3 Expansion and subsequently the Stage 4 Expansion Projects).
| Attachment | Size | 
|---|---|
| 1564_Scoping Report_Langer Heinrich Mine.pdf.pdf | 2.28 MB | 
| 1564_EAR_Langer Heinrich Mine.pdf | 1.59 MB | 
| 1564_EMP_Langer Heinrich Mine.pdf | 2.21 MB | 
| 1564_ECC Old_Langer Heinrich Mine.pdf | 180.11 KB | 
| 1564_Map_Langer Heinrich Mine.pdf | 356.45 KB | 
| 1564_Screening Notice_Langer Heinrich Mine.pdf | 209.74 KB | 
Renewal of ECC for operations of second (60m) Telecommunication Tower on the Husab Mine, Erongo Region.
| Attachment | Size | 
|---|---|
| 1515_EMP_Telecommunication Tower on the Husab Mine.pdf | 1.74 MB | 
| 1515_ECC Old_Telecommunication Tower on the Husab Mine.pdf | 333.98 KB | 
| 1515_Screening Notice_Telecommunication Tower on the Husab Mine.pdf | 123.81 KB | 
Reenwal of ECC for Telecommunication Transmitter Mast at the Husab Mine in the Erongo Region.
Renewal application for: Cathral Investments Ninety One (Pty) Ltd (i.e. Cathral Investments) proposes to conduct further exploration on EPL 6545 around the Sinclair Mine. Furthermore, Cathral Investments proposes to apply for a Mining Licence (ML) from the Ministry of Mines and Energy (MME) for mining; processing of the ore; and associated activities at the Sinclair Mine. Tulela Processing Solutions (Pty) Ltd (i.e. Tulela), a wholly-owned Namibian Metallurgical and Mining company, holds majority shares in Cathral Investments.
| Attachment | Size | 
|---|---|
| 1501_EMP_Exploration at the Sinclair Mine.pdf | 1.08 MB | 
| 1501_ECC Application_Exploration at the Sinclair Mine.pdf | 508.52 KB | 
| 1501_ECC Old_Exploration at the Sinclair Mine.pdf | 328.56 KB | 
| 1501_Map_Exploration at the Sinclair Mine.pdf | 495.85 KB | 
| 1501_Screening Notice_Exploration at the Sinclair Mine.pdf | 210.31 KB | 
Renewal application for: Lodestone's development of an open-pit mine and processing plant at their "Dordabis Iron Ore Mining Project" on ML 182 to produce iron concentrate, including associated infrastructure and activities. The Project area is situated in the Khomas Region, approximately 20 km north-west of Dordabis and 75 km south east of Windhoek on the C23 tar road.
Continuation of: The small-scale extraction of semi-precious stones (tourmaline and quartz crystals) through open pit mining following the tourmaline-bearing zone of the pegmatite. ML 189 is located on Farm Otjua, number 37 in the Karibib District, in the Erongo Region. The ML area lies approximately 40 km south of Karibib, following the district road D1953.
IHS Fund Two (Namibia GP) (Pty) Ltd (the applicant) intends to develop a new housing scheme that will comprise about 427 sectional title dwelling units next to the Dunes Mall on Erf 5748 Walvis Bay. Due to the site’s location and potential for mosquitoes, flies, odour, the applicant has contracted Erongo Consulting Group to prepare the Environmental Impact Assessment Scoping report and Draft Environmental Management Plan for the proposed 2km 315mm closed purified effluent pipeline, which is only conditional upon the occupation of the buildings for residential development.
Continuation of: The small-scale extraction of semi-precious stones (pietersite) through open pit mining following the pietersite-bearing zone of the pegmatite. ML 57 is located on Farm Hopewell, number 240 in the Outjo District, in the Kunene Region.
Continuation of the abstraction of seawater, treatment of the water at the desalination plant for bulk supply of potable water, the discharge of brine back into the sea and associated activities. The plant was designed to produce 20 million cubic metres of potable water per year, at (current) full capacity. The desalination plant is located close to Wlotzkasbaken, ~35 km north of Swakopmund, in the Erongo Region of Namibia.
RE-REGISTRATION OF APPLICATION ON MEFT ONLINE SYSTEM FINAL EIA SUBMISSION: BULK WATER SUPPLY PIPELINE FOR THE PROPOSED TUMAS PROJECT IN THE ERONGO REGION OF NAMIBIA Reptile Uranium Namibia (Pty) Ltd (RUN) submitted an application to the Ministry of Mines and Energy to convert, in part, its Exclusive Prospecting Licences (EPLs) 3496 and 3497 to a Mining Licence (ML). RUN is a wholly owned subsidiary of Reptile Mineral Resources and Exploration (Pty) Ltd (RMR) who manages and conducts the exploration activities on RUN’s tenements.
RE-REGISTRATION OF APPLICATION ON MEFT ONLINE SYSTEM FINAL EIA SUBMISSION: PROPOSED TUMAS PROJECT AND ASSOCIATED INFRASTRUCTURE IN THE ERONGO REGION OF NAMIBIA RUN submitted an application to the Ministry of Mines and Energy to convert, in part, its Exclusive Prospecting Licences (EPLs) 3496 and 3497 to a Mining Licence (ML). RUN is a wholly owned subsidiary of Reptile Mineral Resources and Exploration (Pty) Ltd (RMR) who manages and conducts the exploration activities on RUN’s tenements. RUN and RMR are both wholly owned subsidiaries of Deep Yellow Ltd.
| Attachment | Size | 
|---|---|
| 1268_EIA Submission_Tsumas Project_Erongo Region.pdf | 306.77 KB | 
| 1268_EIA_Tsumas Project_Erongo Region.pdf | 7.26 MB | 
| 1268_EMP_Tsumas Project_Erongo Region.pdf | 1.18 MB | 
| 1268_Proof of Consultation_Tsumas Project_Erongo Region.pdf | 4.33 MB | 
| 1268_Map_Tsumas Project_Erongo Region.pdf | 238.15 KB | 
| 1268_NHC Application_Tsumas Project_Erongo Region.pdf | 302.88 KB | 
| 1268_Screening Notice_Tsumas Project_Erongo Region.pdf | 208.92 KB | 
RE-REGISTRATION OF APPLICATION ON MEFT ONLINE SYSTEM FINAL EIA SUBMISSION: ABOVE GROUND POWERLINE TO THE PROPOSED TUMAS PROJECT IN THE ERONGO REGION OF NAMIBIA RUN submitted an application to the Ministry of Mines and Energy to convert, in part, its Exclusive Prospecting Licences (EPLs) 3496 and 3497 to a Mining Licence (ML). RUN is a wholly owned subsidiary of Reptile Mineral Resources and Exploration (Pty) Ltd (RMR) who manages and conducts the exploration activities on RUN’s tenements. RUN and RMR are both wholly owned subsidiaries of Deep Yellow Ltd.
Renewal application: Continuation of mining and associated activities at the Trekkopje Mine. However, the Project was placed under 'Care and Maintenance' in 2013, with Orano postponing the launch of the Trekkopje Mine indefinitely, depending the future recovery of the uranium price.
| Attachment | Size | 
|---|---|
| 1093_EMP_Trekkopje Project on Mining License 151.pdf | 717.22 KB | 
| 1093_ECC Old_Trekkopje Project on Mining License 151.pdf | 235.58 KB | 
| 1093_Map_Trekkopje Project on Mining License 151.pdf | 198.17 KB | 
| 1093_Screening Notice_Trekkopje Project on Mining License 151.pdf | 174.21 KB | 
Walvis Bay Cargo Terminal (Pty) Ltd (WBCT) proposes to construct a new warehouse on their site in the Port of Walvis Bay, which is managed by the Namibian Ports Authority (Namport). The proposed warehouse will be used to receive, handle, stockpile and reload copper concentrate for shipment when vessels are available. All planned stockpiling activities will take place inside the proposed warehouse.
An amendment to the existing, approved ECC in the name of Arandis Power (Pty) Ltd to make provision for the changes to PV Power Plant component was requested in May 2022. A transferal was also requested, and the approved (amended) ECC was issued to TeraSun Energy (Pty) Ltd (for the operation of the PV Power Plant) in August 2022. This ECC is valid until 2023-09-08 and a request to renew the ECC will be actioned in due course.
IHS Fund Two (Namibia GP) (Pty) Ltd (the applicant) intends to develop a new housing scheme that will comprise about 427 sectional title dwelling units next to the Dunes Mall on Erf 5748 Walvis Bay. The applicant has contracted Erongo Consulting Group to prepare the Environmental Impact Assessment Scoping report and Draft Environmental Management Plan. The units will be sold under a sectional title plan, which means that the streets will be privately owned and maintained by the body corporate, rather than by the Walvis Bay Municipality.
Renewal application for: Windhoek PEL28 B.V. is proposing to drill one or possibly two exploration wells in PEL83. Windhoek PEL28 is a Joint Venture between the block partners, namely GALP Energia S.A. ("GALP"), the National Petroleum Corporation of Namibia (NAMCOR) and Custos. GALP holds an 80% controlling interest in PEL 83, while NAMCOR and Custos each hold 10%. GALP is currently the operator of PEL 83. The proposed exploration wells would be drilled in PEL 83, which is located in the Orange Basin off the coast of Namibia.
The proponent intends to run a salt mining business around 36 kilometers north of Henties Bay. Before the Minister of Mines and Energy can finalize the granting of the mining license, the Ministry of Environment and Tourism must provide compliance certification in the form of an Environmental Clearance.
Erongo Consulting Group (Pty) Ltd was engaged by Interlogix Namibia (Pty) Ltd to compile an Environmental Management Plant (EMP) in accordance with the Environmental Management Act, No. 7 of 2007. Interlogix Namibia herein referred to as the “Interlogix” has been operating a warehouse in Walvis Bay since 2012. Interlogix Namibia, a regional provider of Project Management and Logistics services, is dedicated to operating in a manner that is environmentally friendly.
Seagull Fish Processors would formally like to request for a renewal of our Environmental Clearance Certificate from the Office of the Environmental Commissioner.
| Attachment | Size | 
|---|---|
| 10307_EMP_Seagulls Fish Factory_Walvis Bay.pdf | 767.9 KB | 
| 10307_ECC Application_Seagulls Fish Factory_Walvis Bay.pdf | 552.81 KB | 
| 10307_ECC Notification_Seagulls Fish Factory_Walvis Bay.pdf | 1.9 MB | 
| 10307_ECC Old_Seagulls Fish Factory_Walvis Bay.pdf | 569.29 KB | 
Construction of a 132 kV interconnection overhead powerline from the PV power plant of TeraSun Energy to the Lithops Substation of NamPower near Arandis.