These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The project at Epembe, Ohangwena Region, Namibia, involves the development of a new secondary school by the Ministry of Education, Innovation, Youth, Sports, Arts and Culture, designed to accommodate up to 600 learners, including a hostel and teacher housing, on a 20-hectare site located at 17°47'00"S, 16°27'00"E.
Purpose of the ECC for EPL 10173 The Environmental Clearance Certificate (ECC) is a mandatory requirement for Exclusive Prospecting Licence (EPL) 10173, held by Frampton Investment CC. It ensures that prospecting activities in the Kunene Region, Opuwo Magisterial District, comply with environmental regulations and are conducted responsibly. Key Purposes of the ECC Authorization of Prospecting Activities: The ECC formally permits Frampton Investment CC to conduct prospecting activities, including drilling, trenching, and sampling, within the 19,680.7221-hectare area.
The project involves the establishment of a sophisticated bio-processing facility by Virgo Biotechnology Pty Ltd, a Namibian-owned enterprise, for the sustainable valorization of marine mammal biomass, specifically Cape Fur Seals (Arctocephalus pusillus pusillus). This industrial initiative, located on Portion 105 of Henties Bay Townland No. 133, encompasses a 25-hectare site designed to integrate advanced biotechnological processes for comprehensive resource utilization.
The Environmental Clearance Certificate (ECC) for the Fisherman’s Village Affordable Housing Project is required for the subdivision, rezoning, and development of Erf 5757, Kuisebmond, Walvis Bay, Erongo Region, Namibia.
Project Overview: Mixed Township and Breakwater Development in Henties Bay This project involves the development of a mixed-use township and breakwater on Portion 114 of the Henties Bay Townland No. 133. The primary objective is to establish a modern, eco-friendly development that aligns with local and international standards while boosting the socio-economic landscape of Henties Bay. Key Features: Land Use: A 25-hectare site south of Henties Bay, featuring 250 middle- and high-class houses, boutique hotels, a shopping mall, institutional land use, and public open spaces.
The proponent, Messrs Schmidtco Property Developers (Pty) Ltd, through Messrs Erongo Consulting Group, the Environmental Assessment Practitioner, is applying for the Environmental Clearance Certificate (ECC) for this township development project because it is a legal requirement under the Environmental Management Act (EMA) No. 7 of 2007 and the accompanying EIA Regulations (2012) in Namibia. The project involves substantial land use changes, construction, and development activities, which are likely to have significant environmental and social impacts. 1.
This application is for the Environmental Clearance Certificate (ECC) for the Green Hydrogen, Ammonia Production, and Chemical Storage Facility. The ECC is essential for ensuring compliance with environmental regulations and promoting sustainable development. The application encompasses several key components: Environmental Impact Assessment (EIA): The ECC process includes conducting a thorough EIA to assess potential environmental impacts, such as effects on air quality, water resources, soil, flora, fauna, and community health.
This application is for the Environmental Clearance Certificate (ECC) for the Development of a Net Zero Industrial Park: Wind Energy Farm Project at Arandis Townlands, Erongo Region, Namibia. This project is spearheaded by Zero Carbon Namibia and includes a 1GW wind and solar farm, a green hydrogen production facility, a green ammonia/green hydrogen export facility, and a green ammonia production facility. The ECC application is prepared in accordance with the Environmental Management Act (Act No. 7 of 2007) and specifically Regulation No. 29, Section 21.
Executive Summary: The acquisition of an Environmental Impact Assessment (EIA) license is mandated under section 27 of the Environmental Management Act (EMA) of 2007. This requirement applies to all relevant projects. An EIA project report was prepared by NEMA-registered experts at the request of the proponent to assess the environmental impacts of a proposed agricultural technologies business on farm Henties Bay Townland No. 133 in Erongo Region.
The Locomotive and Wagon Workshop is a key component of the Net Zero Industrial Park project in Arandis Townlands, Namibia. Here’s an overview of what the workshop entails: Purpose Maintenance and Refurbishment: The workshop will be used for maintaining and refurbishing locomotives and wagons, ensuring they are operational and efficient. Hydrogen Conversion: It will also focus on converting locomotives and wagons to hydrogen power, aligning with the project's goal of reducing carbon emissions.
The Solar Facility within the Net Zero Industrial Park, the Environmental Clearance Certificate (ECC) application is essential for: 1. Establishing a 1GW solar farm as part of the broader project’s clean energy initiative, which aims to produce renewable energy that will support the operations of the park, including hydrogen production and other facilities. 2. Ensuring the sustainable generation of solar power, which will contribute to reducing carbon emissions and support Namibia's green energy transition. 3.
Project Focus: This project centers on renewing the Environmental Management Plan (EMP) and Environmental Clearance Certificate (ECC) for a proposed healthcare facility on a 1.5-hectare public open space (Erf 6288) in Kuisebmond, Walvis Bay, Namibia. Environmental Compliance Renewal: The rezoning from public open space to institutional use necessitates an updated EMP to demonstrate continued adherence to Namibia's Environmental Management Act (EMA) and the principles established at the Earth Summit.
The Environmental Clearance Certificate (ECC) is sought for the proposed mixed-use township development on Portion X, Henties Bay Townland No. 133, in the Erongo Region of Namibia. This certificate is necessary to obtain official approval from regulatory authorities, specifically the Ministry of Environment, Forestry & Tourism, confirming that the proposed development complies with environmental regulations and standards.
For the proposed construction and operation of a 15MW Solar Plant.
For the proposed development and operation of a recirculatory aquaculture production project.
For the development and operation of a 15MW merchant Solar Plant.
For the operation of a chemical and minerals storage warehouse in Walvis Bay.
ECC amendment application for the proposed construction and operation of 20MW merchant photovoltaic plant at on a 30ha piece of land at Farm Randveld No. 167 in Outjo district ,Otjozondjupa Region.
ECC amendment application for the proposed construction and operation of 80MW merchant photovoltaic plant at on a 230ha piece of land at Farm Randveld No. 167 in Outjo district ,Otjozondjupa Region.
For the installation and operation of a 48m lattice telecommunication tower.
For the installation and operation of a 80m guyed mast telecommunication tower.
Proposed Mixed-Use Township Development in Henties Bay, Namibia Kandjumbi Construction and Plumbing CC is proposing to develop a mixed-use township on a 25-hectare site in Henties Bay, Namibia. The project will include 200 houses, a 3-star hotel, a shopping mall, institutional land use, and affordable student accommodations. The project is expected to create 350-450 permanent jobs and will be in line with the Henties Bay Zoning Scheme of 2021 and the Henties Bay structure plan.
The Dune 7 Concession, located within Dorob National Park in Walvis Bay, Namibia, has recently been awarded to Sandwich Dune Tours and Safari CC by the Ministry of Environment, Forestry, and Tourism Namibia. This concession has long been a popular recreational area, but its deteriorating state, characterized by littering, vandalized facilities, and inadequate infrastructure, has raised concerns among the public. In response, the Ministry undertook a renovation project to address these issues and improve the overall condition of the site.
For the minerals exploration activities on EPL 8148,8326 and 8056.
For the proposed construction and operation of a 120MW merchant solar photovoltaic plant.
IHS Fund Two (Namibia GP) (Pty) Ltd (the applicant) intends to develop a new housing scheme that will comprise about 427 sectional title dwelling units next to the Dunes Mall on Erf 5748 Walvis Bay. Due to the site’s location and potential for mosquitoes, flies, odour, the applicant has contracted Erongo Consulting Group to prepare the Environmental Impact Assessment Scoping report and Draft Environmental Management Plan for the proposed 2km 315mm closed purified effluent pipeline, which is only conditional upon the occupation of the buildings for residential development.
For the installation and operation of a 600kWp Solar plant at Neudamm Unam Campus in Windhoek.
For the installation of a 410kWp Solar plant at Ogongo Unam Campus in Omusati Region.
For the installation and operation of 130kWp Solar plant at Rundu Unam Campus in Rundu, Kavango East region.
For the installation and operation of a 313kWp Solar plant at Unam main campus in Windhoek.
For the area covered and proposed exploration activities on EPL 8646 in Otjiwarongo and Grootfontein district in Otjozondjupa Region.
For the area covered by EPL 8746 and the proposed mineral exploration activities on the same EPL, the minerals are: Base and rare metals, industrial minerals and precious metals.
For the proposed construction and operation of a 5mw merchant Solar photovoltaic plant.
For the renewal of expired ECC, transfer of Environmental Clearance Certificate from Oshipaya Minerals cc to Luxury Investments 56 (PTY) Ltd and amendment of the EPL number that was mistakenly written as EPL 6906 instead of EPL 6909 on the ECC that was issued on the 5th of March 2019.
| Attachment | Size |
|---|---|
| 1155_EMP_EPL 6909 in Karibib District.pdf | 467.87 KB |
| 1155_ECC Old_EPL 6909 in Karibib District.pdf | 197.61 KB |
| 1155_Map_EPL 6909 in Karibib District.pdf | 360.98 KB |
| 1155_Screening Notice_EPL 6909 in Karibib District.pdf | 117.82 KB |
IHS Fund Two (Namibia GP) (Pty) Ltd (the applicant) intends to develop a new housing scheme that will comprise about 427 sectional title dwelling units next to the Dunes Mall on Erf 5748 Walvis Bay. The applicant has contracted Erongo Consulting Group to prepare the Environmental Impact Assessment Scoping report and Draft Environmental Management Plan. The units will be sold under a sectional title plan, which means that the streets will be privately owned and maintained by the body corporate, rather than by the Walvis Bay Municipality.
For the ECC renewal of the proposed construction and operation of a chemical storage facility in Arandis.
For the minerals exploration activities on EPL 8281.
| Attachment | Size |
|---|---|
| 545_ESR_EPL 8281 in Uis District.pdf | 1.57 MB |
| 545_EMP_EPL 8281 in Uis District.pdf | 432.05 KB |
| 545_Consent Letter_EPL 8281 in Uis District.pdf | 1.43 MB |
| 545_Proof of Consultation_EPL 8281 in Uis District.pdf | 5.92 MB |
| 545_Map_EPL 8281 in Uis District.pdf | 223.9 KB |
| 545_Screening Notice_EPL 8281 in Uis District.pdf | 44.79 KB |
Proposed installation and operation of 15 camouflage towers within the municipal boundaries of Walvisbay.
The proponent intends to run a salt mining business around 36 kilometers north of Henties Bay. Before the Minister of Mines and Energy can finalize the granting of the mining license, the Ministry of Environment and Tourism must provide compliance certification in the form of an Environmental Clearance.
For the proposed construction and operation of a mini shop, butchery and entertainment park in Etoshapoort, Outjo.
For the proposed upgrade and operation of a fuel retail facility on the existing Transnamib premises in Otjiwarongo.
Erongo Consulting Group (Pty) Ltd was engaged by Interlogix Namibia (Pty) Ltd to compile an Environmental Management Plant (EMP) in accordance with the Environmental Management Act, No. 7 of 2007. Interlogix Namibia herein referred to as the “Interlogix” has been operating a warehouse in Walvis Bay since 2012. Interlogix Namibia, a regional provider of Project Management and Logistics services, is dedicated to operating in a manner that is environmentally friendly.
Environmental Impact Assessment fot he proposed charcoal harvesting and construction of a charcoal production plant at M'bela No. 201 Farm et al., Okahandja District, Otjozondjupa Region.