natural gas exploration

Underground prospection conducted with various methods to discover natural gas deposits which are usually found in the immediate vicinity of crude petroleum. (Source: ZINZAN / PARCOR)



The listing below shows all records tagged with this term.

The records can be filtered using the search boxes. Or leave this page and do a full search of all records.

Displaying results 1 - 10 of 10 record(s) tagged with this keywordClick/tap on any title to see full details of the record
Ministry of Environment and Tourism (MET) 2013. Environmental clearance for the Kudu Power Plant at Uubvlei near Oranjemund, Namibia.
Downloadable files:
Attachment Size
Kudu_MET Env Clearance Certificate _Mar2013.pdf 70.38 KB
Southern African Institute for Environmental Assessment (SAIEA) 2006. Kudu Gas to Power Project: Integrated Impact and Mitigation Report.
Downloadable files:
Attachment Size
Kudu_SAIEA Integrated ImpactMitigation Report_May 2006.pdf 1.91 MB
2002. 2.16 Prospecting licences.
Downloadable files:
Attachment Size
Fig 2.16 Prospecting licences.zip 143.89 KB
Risk-Based Solutions (RBS) 2019. Application for Environmental Clearance Certificate (ECC) for the Proposed Petroleum Exploration Operations (Drilling of Stratigraphic Wells) in Petroleum Exploration License (PEL) 73 Covering Blocks 1719, 1720, 1721, 1819, 1820 and 1821, Etosha Basin, Kavango West and East Regions, Northern Namibia.
Downloadable files:
Attachment Size
ESR_EIA Report Report for Drilling in PEL 73 Blocks 1819 and 1820 Kavango East and West Vol 1 of 3.pdf 3.01 MB
EIA_EIA Report Report for Drilling in PEL 73 Blocks 1819 and 1820 Kavango East and West Vol 2 of 3.pdf 10.39 MB
EMP_EIA Report Report for Drilling in PEL 73 Blocks 1819 and 1820 Kavango East and West Vol 3 of 3.pdf 8.18 MB
Annex 1_EIA Report Report for Drilling in PEL 73 Blocks 1819 and 1820 Kavango East and West Vol 2 of 3.pdf 3.83 MB
Annex 3 of 1_Confidente Advert 16_22 May 2019.pdf 2.58 MB
Annex 2_Fauna and Flora in PEL 73 Blocks 1819 and 1820 Kavango West Region_Dec 2018.pdf 922.87 KB
Annex 3 of 3_3_Feature Article 1 Monday 27th May 2019.pdf 2.32 MB
Annex 3_Socioeconomic Report for PEL 73 Multi Well Drilling Operations_Jan 2019.pdf 1.61 MB
Annex 4_Groundwater Report for EIA PEL 73 Stratigraphic Well Drilling in Kavango Basin_March 2019.pdf 1.86 MB
Annex 5_Archaeological Desk Report for PEL 73 Blocks 1819 and 1820 Kavango East Region_Jan 2019.pdf 1.67 MB
ECC for RecoAfrica Kavango Basin Strategraphic Well Drilling Project_2019.pdf 598.65 KB
Minutes of the Meeting Held in Nkurenkuru Kavango West Region on 9 May 2019.pdf 428.74 KB
Minutes of the Meeting Held in Rundu Kavango East Region on 10 May 2019.pdf 451.36 KB
Nkurenkuru Kavango West Region Attedance Register Stakeholder Meeting 9 May 2019.pdf 1.32 MB
PEL 73 Meetings Presentations for Proposed Petoleum Exploration by in PEL 73 Kavango West and East Regions.pdf 8.91 MB
Public Notice 1 Confidente Newspaper 16_22 May 2019.pdf 5.67 MB
Rundu Kavango East Region Attedance Register Stakeholder Meeting 10 May 2019.pdf 1.01 MB