electric power supply




The listing below shows all records tagged with this term.

The records can be filtered using the search boxes. Or leave this page and do a full search of all records.

Displaying results 1 - 50 of 191 record(s) tagged with this keywordClick/tap on any title to see full details of the record
Bridgeford P, Heinrich D 2007. Raptor electrocutions and collisions with power-lines in Namibia. Lanioturdus 40 (1) 25-26
Downloadable files:
Attachment Size
Raptor electrocutions and collisions with power_lines in Namibia.pdf 283.16 KB
Turco M 1996. 'I'd rather they kill me'. Keeping Track February/March (1996) 11-15
Downloadable files:
Attachment Size
Id rather they kill me.pdf 1.96 MB
Ezzell C 2001. The Himba and the dam.
Downloadable files:
Attachment Size
The Himba and the dam.pdf 2.71 MB
2009. NamPower/Namibia Nature Foundation Strategic Partnership. (June 2009)
Downloadable files:
Attachment Size
NP - NNF newsletter No. 1 Jun 09.pdf 263.78 KB
2009. NamPower/Namibia Nature Foundation Strategic Partnership. (October 2009)
Downloadable files:
Attachment Size
NP - NNF newsletter No. 2 Oct 09.pdf 863.01 KB
Namibian Association of CBNRM Support Organisations (NACSO) 2010. NamPower/Namibia Nature Foundation Strategic Partnership. (February 2010)
Downloadable files:
Attachment Size
NP - NNF newsletter No. 3 Feb 2010.pdf 939.56 KB
2010. NamPower/Namibia Nature Foundation Strategic Partnership. (June 2010)
Downloadable files:
Attachment Size
NP - NNF newsletter No. 4 June 2010.pdf 1.29 MB
2010. NamPower/Namibia Nature Foundation Strategic Partnership. (September 2010)
Downloadable files:
Attachment Size
NP - NNF newsletter No. 5 September 2010.pdf 1.34 MB
2011. NamPower/Namibia Nature Foundation Strategic Partnership. (February 2011)
Downloadable files:
Attachment Size
NP - NNF newsletter No. 6 February 2011.pdf 3.38 MB
Southern African Institute for Environmental Assessment (SAIEA) 2004. 8. Proposed Popa Falls Hydropower Project, Okavango River, Namibia. 71-88
Downloadable files:
Attachment Size
Proposed Popa Falls Hydropower Project.pdf 261.42 KB
Southern African Institute for Environmental Assessment (SAIEA) 2009. Pre-feasibility study for the Popa Falls Hydro Power Project: Preliminary Environmental Assessment.
Southern African Institute for Environmental Assessment (SAIEA) 2015. WattsOn - Omburu Solar Power Plant Officially Inaugurated.
Downloadable files:
Attachment Size
Watts On Edition 1 2015.pdf 1.2 MB
Magg TG, Mutschler HD, Nyberg S, Wasborg J, Thunehed H, Sandberg B 2010. Caprivi Link HVDC Interconnector: Site selection, geophysical investigations, interference impacts and design of the earth electrodes.
Downloadable files:
Attachment Size
Caprivi Link HVDC Interconnector_2010.pdf 669.23 KB
2015. Nampower substations December 2015.
Downloadable files:
Attachment Size
substations_shp.zip 9.17 KB
Ledger JA, Hobbs JCA 1999. Raptor use and abuse of powerlines in southern Africa. Journal of Raptor Research 33 (1) 49-52
Downloadable files:
Attachment Size
Raptor use and abuse of powerlines in southern Africa.pdf 437.59 KB
Christie R 1976. Who benefits by the Kunene hydro-electric schemes. Social Dynamics: A journal of African studies 2 (1) 31-43