Title:

EIA for three proposed 10 MW photovoltaic (solar) energy facilities at Mariental, Omaruru and Okahandja, Namibia. Background information document

Author(s):
Abstract:

Namibia Power Corporation (Pty) Ltd (NamPower) propose to off-take power from an Independent Power Producer (IPP) or Producers (IPP's). The power will be generated from three individual 10 megawatt (MW) photovoltaic (PV) solar energy facilities at three separate locations in Namibia namely; Mariental, Omaruru and Okahandja (Figure 3). In terms of the Namibian environmental legislation (Environmental Management Act (No. 7 of 2007)), an EIA is required to obtain an Environmental Clearance Certificate from the Ministry of Environment and Tourism (MET) before the project can proceed. As a preferred IPP or IPP's has not yet been selected, NamPower has appointed Aurecon South Africa (Pty) Ltd (Aurecon) to undertake the EIA study to investigate the biophysical and socio-economic environmental issues. The findings will help inform MET's decision-making and to inform the design and operation of the three proposed PV solar energy facilities.

Item Type:
Report
Language:
en