The records can be filtered using the search boxes. Or leave this page and do a full search of all records.
Attachment | Size |
---|---|
Environmental management plan for operation and maintenance of the Medupi Power Station_2009.pdf | 402.83 KB |
Attachment | Size |
---|---|
Mansfeld thesis.pdf | 3.15 MB |
Attachment | Size |
---|---|
EIA Power Lines Uubvlei to Obib Volume 2 Appendix_2005.zip | 4.07 MB |
Attachment | Size |
---|---|
EIA Power Lines Kudu Gas Power Station Appendix.zip | 18.16 MB |
Attachment | Size |
---|---|
EIA Power Lines Kudu Gas Power Station.zip | 1.79 MB |
Attachment | Size |
---|---|
EIA Kokerboom to Namib Substation_2004.zip | 2.54 MB |
Attachment | Size |
---|---|
Railway line Katima Mulilo to Cape Fria.zip | 5.3 MB |
Attachment | Size |
---|---|
Specific EMP for Aus Rehoboth Power Line.pdf | 68.71 KB |
Attachment | Size |
---|---|
Final Generic EMP.pdf | 149.41 KB |
Attachment | Size |
---|---|
Appendix EIA Auas Rehoboth_2006.zip | 2.41 MB |
Attachment | Size |
---|---|
Final EIA Report Auas Rehoboth 22 June_2006.zip | 2.62 MB |
Attachment | Size |
---|---|
Procedures and Guidelines for SEA and EMP 2008.pdf | 468.72 KB |
Attachment | Size |
---|---|
Environmental Assessment policy 1995.pdf | 335.22 KB |
Attachment | Size |
---|---|
EIA Skorpion Zinc 400kv power Transmission Line Project.pdf | 99.37 KB |
Attachment | Size |
---|---|
Preparing for an Assessment of Environmental Impacts from Onshore and Offshore Phosphate Mining Activities in Namibia.pdf | 12.77 MB |
Attachment | Size |
---|---|
EIA for proposed deep water exploration well drilling in Petroleum exploration license 39_2017.pdf | 8.39 MB |
Attachment | Size |
---|---|
Namibia_Strategic Expansion of the Walvis Bay Container Terminal Project_Executive ESIA Summary.pdf | 559.3 KB |
Attachment | Size |
---|---|
Guideline on integrating health into ESIA 2017.pdf | 7.34 MB |
Attachment | Size |
---|---|
Strategic environmental assessment of large_scale bush thinning and value addition activities in Namibia.pdf | 2.7 MB |
Attachment | Size |
---|---|
Forestry and Environmental Authorisations Process for Harvesting Projects 2017 Amended.pdf | 4.53 MB |
Attachment | Size |
---|---|
Otjikoto Gold Mine_Hazardous waste management plan_2016.pdf | 1.3 MB |
Attachment | Size |
---|---|
Hazardous waste management plan at B2Gold Otjikoto Gold Mine_2017.pdf | 4.43 MB |
Attachment | Size |
---|---|
Proposed Dorper Wind Energy Facility.pdf | 3.69 MB |
Attachment | Size |
---|---|
Proposed Amakhala Emoyeni Wind Energy Facility_2010.pdf | 21.18 MB |
Attachment | Size |
---|---|
Proposed Upington Solar Thermal Plant.pdf | 17.14 MB |
Attachment | Size |
---|---|
SEA Review Methodology_Published IAPA paper.pdf | 929.03 KB |