The records can be filtered using the search boxes. Or leave this page and do a full search of all records.
Attachment | Size |
---|---|
EIA report for the Rosing Uranium Mine Expansion Project_Socio_Economic Baseline Study.pdf | 669.55 KB |
Attachment | Size |
---|---|
2009_Etango_ESMP_Final_Volume_3.pdf | 3.11 MB |
Attachment | Size |
---|---|
2008_Trekkopje_ESIA_Final_with_appendices.pdf | 40.41 MB |
Attachment | Size |
---|---|
Social Assessment on the Feasibility Study on the Okavango River_Grootfontein Link of the Eastern National Water Carrier.pdf | 1.12 MB |
Attachment | Size |
---|---|
SEIA Phase 1_Proposed mine expansion_Scoping report _15 November 2007.pdf | 2.3 MB |
Attachment | Size |
---|---|
2008_Trekkopje_Desalination_and_Pipeline_EIA.pdf | 16.39 MB |
Attachment | Size |
---|---|
Atlas of Poverty in Namibia 10 LOW RES_2011.pdf | 5.22 MB |
Attachment | Size |
---|---|
Atlas of Poverty in Namibia 1-2 LOW RES_2011.pdf | 3.77 MB |
Attachment | Size |
---|---|
Atlas of Poverty in Namibia.zip | 24.28 MB |
Attachment | Size |
---|---|
Atlas_of_Namibias_population_2010.pdf | 28.34 MB |