Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 46 of 46
Monday, 11 August 2025
Enviro Management Consultants Namibia 2025. 241021004847: The upgrading to bitumen standards of Main Road 36 and MR 31 from Walvis Bay to Maltahöhe via Solitaire in the Erongo/Hardap Regions (385km).
Tulipamwe Consulting Engineers was appointed in May 2024 by the Roads Authority, to carry out the Detail Design and Tender Documentation for The Upgrading to Bitumen Standards of Main Road 36 and Main Road 31 from Walvis Bay to Maltahöhe via Solitaire in the Erongo/Hardap Region. The project road is a gravel road approximately 385 km long. The final design of the road is to be completed towards the end of 2024.
Monday, 4 August 2025
Stewart Planning 2025. 250715006112: Rezoning of Erven 14, 15, 16 and 17 Lüderitz from Residential 1 with a density of 1:400m² to General Business with a bulk of 2 and subsequent Consolidation of the Erven into Portion X in Lüderitz, Karas Region.

The rezoning of land zoned residential to business is a listed activity; therefore, it is necessary to apply for Environmental Clearance for the rezoning of Erven 14, 15, 16, and 17 from Residential to General Business, as there is a need to establish a retail business with possible flats on the consolidated site.

Wednesday, 9 July 2025
Stewart Planning 2025. 250609005899: Rezoning of Erf 1423 Walvis Bay from Single Residential to General Business, Erongo Region.

The ECC is for the rezoning of Erf 1423 from Single Residential to General Business. The proposed "General Business" zoning will permit a wide range of office and business land uses as primary right. In the long term, the existing buildings will be re-developed into an office/business building. In the immediate short term, the owner intend to convert the existing dwelling house into offices with the required on-site parking. No site development plan has been prepared to date.

Wednesday, 9 July 2025
Stewart Planning 2025. 250617005935: Rezoning of Erf 1122 Walvis Bay from Single Residential to General Business.

The owner intends to obtain office/business rights to permit the redevelopment of the site into an office/business for the renting and hiring of cars (Sea Breeze Car Hire CC). The short-term intention is to use part of the current dwelling unit and ancillary outbuildings for office space, henceforth the application for consent for home-based business. The long-term intention is to convert the entire "existing dwelling" and outbuildings and develop a new office and business premises on the site once the rezoning application has been finalized.

Monday, 16 June 2025
Enviro Management Consultants Namibia 2025. 250523005846: The upgrading to bitumen standard of MR44: Swakopmund - Henties Bay and MR76: Henties Bay - Uis - Kamanjab, Phase II Section A, between Kamanjab and Khorixas (105km) Kunene Region.

The ECC is required for Upgrading MR76 from Gravel Road Standards to Bitumen Road Standards. The project road provides critical connectivity between northern Namibia, Angola, and the coastal Erongo Region. Once upgraded to bitumen standards, MR76 will form a vital part of Namibia’s regional road network, supporting both rural and urban development along its corridor. Road infrastructure plays a key role in improving socio-economic development. The upgrade of MR76 is expected to: Enhance access to health, education, and markets. Lower travel times and vehicle operating costs.

Tuesday, 20 May 2025
Enviro Management Consultants Namibia 2025. 250110005169: Environmental Assessment for upgrading of various roads in Nkurenkuru - Kavango West Region.

Enviro Management Consultants Namibia (EMCN) is appointed to undertake the Environmental Assessment relating to the proposed project - Direct Appointment of Element Consulting Engineers for the Design, Contract Documentation, Site Supervision and Contact Administration for Upgrading of Various Roads in Nkurenkuru - Kavango West Region. The Road Fund Administration together with the Nkurenkuru Town Council are funding this project which involves the upgrading of various roads within the Nkurenkuru Town.

Friday, 21 March 2025
Stewart Planning 2025. 250220005403: Rezoning of Erf 494 Nautilus, Lüderitz, from "Residential 1" (1:300) to "General Business" (Bulk 1.5) Karas Region.
For rezoning from residential to business to operate a bakery and shop within the urban area of Nautilus, Lüderitz, Namibia.
Thursday, 6 March 2025
Enviro Management Consultants Namibia 2025. 250130005240: Rehabilitation of existing streets in Otjiwarongo Municipal Area, in the Otjozondjupa Region.

The Roads Authority of Namibia (RA) appointed Element Consulting Engineers to perform the emergency consulting services for detailed design and tender documentation, evaluation and supervision for the rehabilitation of several streets on the Otjiwarongo Municipal area in the Otjiwarongo Maintenance Region. Enviro Management Consultants Namibia (EMCN) is appointed to undertake the Environmental Assessment relating to the proposed project.

Thursday, 13 February 2025
Enviro Management Consultants Namibia 2025. 250127005218: Renewal of the existing ECC for: Construction of TR9/1 from Windhoek to Hosea Kutako International Airport Dual Carriage Freeway Standards.
This project is nearing completion, but some additional time is required till November 2025. Please refer to the motivation letter form the Roads Authority.
Monday, 30 December 2024
Stewart Planning 2024. 241206005054: Rezoning: General Residential to General Business for Erf 517 Walvis Bay, Erongo Region.

Change of land use from residential to business. In the immediate short term, the owners intend to convert the existing flat building into offices with the required on-site parking. In the long term, the existing buildings will be demolished and a three-storey building could be developed with each floor potentially comprising the following land uses: Ground Floor: Offices and/or Retail/Shops; First Floor: Offices/Apartments; Third Floor: Apartments No site development plan has been prepared to date.

Monday, 30 December 2024
Enviro Management Consultants Namibia 2024. 240905004656: The rehabilitation of several streets in Walvis Bay Municipal Area - Erongo Region.
Regulation 10.1 and 10.2 - Construction of public roads.
Monday, 2 December 2024
Enviro Management Consultants Namibia 2024. 241115004968: Rehabilitation of TR1/3 Section B and C and upgrading to Low Volume Seal of MR98 (Tses – Berseba), //Karas and Hardap Regions.

The Roads Authority of Namibia appointed Element Consulting Engineers (Pty) Ltd, to perform consultancy services for the detail design, tender documentation, contract administration and site supervision for the detail design for rehabilitation of TR1/3 Section B and C and upgrading to Low Volume Seal of MR98 (Tses – Berseba) //Karas and Hardap Regions.

Tuesday, 5 November 2024
Enviro Management Consultants Namibia 2024. 240206002778: Extraction of material at the Ncuma borrow pit for the upgrading to bitumen standard of the Amta Road in Rundu - Kavango East.

Numerous road upgrades are taking place in and around the town of Rundu - Kavango East Region. The construction of these roads require suitable material for the layer works as well as the surface. Suitable materials are very difficult to obtain in this area of Namibia and the sources are limited. During the site visit the Roads Authority together with the contractor and engineers identified one source suitable. This borrow pit is located approximately 10km south of Rundu and is known as the Ncuma road borrow pit.

Tuesday, 20 August 2024
Enviro Management Consultants Namibia 2024. 240723004432: Rehabilitation of TR10/2: Onhuno - Eenhana, Ohangwena Region.
This is a renewal application for ECC 00912.
Monday, 13 May 2024
Enviro Management Consultants Namibia 2024. 240424003420: Upgrade 145 km of MO119 (TO602 to Talismanus) to low volume seal.

As part of its mandate, the Roads Authority must ensure that the marginalized communities are served by the national road network. Main Road 119 provides access, to essential services like schools and medical facilities, to the Talismanus community. Maintaining the existing gravel road has become costly due to the excessive deterioration and upgrading the road is more feasible.

Friday, 15 December 2023
Enviro Management Consultants Namibia 2023. 230314001129: Rehabilitation of the road between Rundu and Divundu - Borrow Pit application at Divundu.

The road between Rundu and Divundu is being rehabilitated and material is required for this operation. The only suitable material to be found is an existing borrow pit close to Divundu. This application is for permission to extract material from the existing borrow pit and to crush it on site. This material will be used for the road rehabilitation.

Monday, 7 August 2023
Enviro Management Consultants Namibia 2023. Contract No. RA/DC-CR/05-2015: Construction of MR44, MR36 and TR 2/1 between Swakopmund and Walvis Bay to Freeway Standards..

This is a renewal application of an existing ECC for this project.

Wednesday, 19 July 2023
Stewart Planning 2023. 230705001668: Renewal of ECC for the closure and rezoning of a portion of Erf 1464 Hentiesbaai Ext 4, Erongo Region.

Renewal of ECC for the closure and rezoning of a 120m² portion of Erf 1464 Hentiesbaai Extension 4 from "Public Open Space" to "Local Authority" to permit the development of a new Erongo RED electrical substation. The previous ECC was issued on 12 April 2019 and has lapsed, hence application is made to renew this ECC. Only a 120m² portion of the erf will be closed, constituting 2.3% of the total Erf 1464 Hentiesbaai Ext 4 (5165 m²). The Remainder of Erf 1464 Hentiesbaai Ext 14 will remain open as a "Public Open Space".

Friday, 30 June 2023
Enviro Management Consultants Namibia 2023. 230124000892: Construction and rehabilitation of MR118 between Rosh Pinah and Oranjemund, //Karas Region.

The project consists of three (3) sections A to C. Section A to C of bitumen surface standards to be removed, stockpiled, and reconstructed. Section A and B are located on the section of road in between the orange river and part of the Magalies mountain range, and after Sendelingsdrift mine. Section C is also a section constructed with high fills. The level of the road was increased by ± 7 metres, with 8 % superelevation. Section A, B are in the vicinity of Sendelingsdrift mine, next to the Orangeriver, sections C along the Auchas pass.

Monday, 13 February 2023
Stewart Planning 2023. 221118000381: Closure and rezoning of Erf 9806 Swakopmund Ext 39 as Public Open Space.

The Environmental Clearance Certificate is for the permanent closure of Erf 9806 Swakopmund Extension 39 (2251m²) as Public Open Space and subsequent rezoning to General Business on condition that adjacent Erf 9793 Swakopmund Extension 39 (1835m²) be rezoned from General Residential 2 to Public Open Space to partially replace open space.

Friday, 28 October 2022
Stewart Planning 2022. 221010000030: Proposed consolidation and rezoning of Erven 3109 and 3124 Walvis Bay to "Local Business" and construction and operation of a telecommunications mast.

Previous Reference: APP-003574 (before online data loss). The proposed consolidation and rezoning of Erven 3109 and 3124 Walvis Bay from "Single Residential" with a density of 1 dwelling unit per 300m² to "Local Business" will permit the construction and operation of a double-storey retail showroom and offices with a related workshop and training centre for Radio Electronic (Pty) Ltd (the Proponent).

Thursday, 5 May 2022
Enviro Management Consultants Namibia 2022. APP-003658: Feasibility study, preliminary design and detailed design for the upgrade to bitumen standard of the access road: Opuwo-Okongwati-Epupa-Baynes HPP.

Detailed design, borrow of materials, construction related activities.

Wednesday, 22 December 2021
Enviro Management Consultants Namibia 2021. APP-003342: Upgrade of 145km of MO119 (TO602 to Talismanus) to low volume seal, Omaheke Region.

Enviro Management Consultants Namibia (EMCN) is appointed to undertake the Environmental Assessment relating to the proposed project - Contract No. W/DP/RA-22/2020 design and contract documentation to upgrade upgrade of 145km of MO119 (TO602 to Talismanus) to low volume seal.

Wednesday, 22 December 2021
Enviro Management Consultants Namibia 2021. APP-003343: Upgrading to bitumen standard of DR1953 (56km) Karibib - Otjimbingwe in the Erongo Region.

Enviro Management Consultants Namibia (EMCN) is appointed by the Roads Authority to undertake the Environmental Assessment relating to the proposed project - Detailed Design, Tender Documentation for the Upgrading to Bitumen Standard of DR1953 (56km) Karibib - Otjimbingwe in the Erongo Region.

Wednesday, 22 December 2021
Enviro Management Consultants Namibia 2021. APP-003344: The upgrade of roads to low volume seal in and around the Town of Rundu in the Kavango East Region.

Enviro Management Consultants Namibia (EMCN) is appointed by the Roads Authority to undertake the Environmental Assessment relating to the proposed project - The Upgrade of Roads to Low Volume Seal in and around the Town of Rundu in the Kavango East Region: John Mutorwa Street in Rundu, DR3402 (from TR8/4 intersection to Rundu University Campus), DR3448 (from TR8/4 intersection for 5 km) and DR3402 (from Rundu University Campus for 1.4km towards Kayengona Junction).

Monday, 20 December 2021
Enviro Management Consultants Namibia 2021. APP-002830: Upgrading to low volume seal standards of DR1635 du Plessis Plaas to DR1668 Epukiro (47km), Omaheke Region.

The route determination of roads and design of associated physical infrastructure where - (a) it is a public road; (b) the road reserve is wider than 30 meters; or (c) the road caters for more than one lane of traffic in both directions.

Monday, 20 December 2021
Enviro Management Consultants Namibia 2021. APP-002831: Upgrading to low volume seal standards of access roads DR3815 (DR1004), DR3816 and DR3824 - Omaheke Region.

As part of the Roads Authority's mandate in support of the Government’s Rural Access Roads Development Program to enhance rural accessibility, stimulate economic growth and connect the rural population to the economic belt of Namibia, the construction and upgrading to Low Volume Seal standards of three (3) access roads intersecting the MR91: Gobabis - Aminuis - Aranos road namely, DR3815 (DR1004), DR3816 and DR3824.

Friday, 5 November 2021
Enviro Management Consultants Namibia 2021. APP-002832: Contract No. RA/DC - CR/06 - 2014, construction of TR9/1 from Windhoek to Hosea Kutako International Airport to dual carriage freeway standards.

Application for renewal of Environmental Clearance Certificate.

Monday, 18 October 2021
Enviro Management Consultants Namibia 2021. APP-002923: Contract No. RA/CS-CR/05-2014 design, contract administration and site supervision rural access roads in the Ohangwena Region.

The application is submitted for the obtainment of an ECC for the proposed project.

Friday, 15 October 2021
Enviro Management Consultants Namibia 2021. APP-003026: Application for sand mining BP 34 A3.

Application for sand mining to construct a road.

Monday, 27 September 2021
Enviro Management Consultants Namibia 2021. APP-002948: Environmental Assessment Report for: Low volume seal construction of 6km of road in Gam as part of the low volume seal program.

Construction of low volume seal road.

Monday, 27 September 2021
Stewart Planning 2021. APP-002398: Renewal of ECC for a Service Station on Remainder Erf 5433 Walvis Bay (Dunes Mall), Erongo Region.

The purpose of this application is to renew the Environmental Clearance Certificate for the establishment and operation of the proposed Service Station on the Remainder of Erf 5433 Walvis Bay (Dunes Mall), Erongo Region. The ECC was issued on 07 September 2018 and will expire on 06 September 2021.

Tuesday, 3 August 2021
Enviro Management Consultants Namibia 2021. APP-002017: Environmental and Social Management Plan for the following project: SC/DP/RA – 16/2019 re-graveling contracts in the Keetmanshoop Region.

The proposed project (re-graveling of existing roads) was discussed with the Ministry of Environment and Tourism on few occasions. It was agreed that a full EIA is not required due to the fact that it is existing roads and existing borrow pits to be used for the proposed project. It was further decided that an ESMP be submitted for the various roads to be re-graveled.

Tuesday, 3 August 2021
Enviro Management Consultants Namibia 2021. APP-002018: Environmental and Social Management Plan for the following project: SC/DP/RA – 16/2019 re-graveling contracts in the Ojtiwarongo Region.

The proposed project (re-graveling of existing roads) was discussed with the Ministry of Environment and Tourism on few occasions. It was agreed that a full EIA is not required due to the fact that it is existing roads and existing borrow pits to be used for the proposed project. It was further decided that an ESMP be submitted for the various roads to be re-graveled.

Tuesday, 3 August 2021
Enviro Management Consultants Namibia 2021. APP-002019: Environmental and Social Management Plan for the following project: SC/DP/RA – 16/2019 re-graveling contracts in the Windhoek Region.

The proposed project (re-graveling of existing roads) was discussed with the Ministry of Environment and Tourism on few occasions. It was agreed that a full EIA is not required due to the fact that it is existing roads and existing borrow pits to be used for the proposed project. It was further decided that an ESMP be submitted for the various roads to be re-graveled.

Tuesday, 3 August 2021
Enviro Management Consultants Namibia 2021. APP-002020: Environmental and Social Management Plan for the following project: SC/DP/RA – 16/2019 re-graveling contracts in the Oshakati Region.

The proposed project (re-graveling of existing roads) was discussed with the Ministry of Environment and Tourism on few occasions. It was agreed that a full EIA is not required due to the fact that it is existing roads and existing borrow pits to be used for the proposed project. It was further decided that an ESMP be submitted for the various roads to be re-graveled.

Wednesday, 23 December 2020
Stewart Planning 2020. APP-002189: Subdivision, closure and rezoning of a portion of Erf 5238 Walvis Bay Extension 14 to legalize and entrench an electrical switching station originally built in 1963.

The subdivision, closure and rezoning of a 360m² portion of Erf 5238 Walvis Bay Extension 14 (126,133m²) from "Public Open Space" to "Utility Services" to legalize and entrench the continued existence of an electrical switching station originally built in 1963. A "Utility Services" zoning permits the development of land for the provision of services (other than those provided by the Council) and includes communication towers and electrical substations and other similar facilities that are uninhabited. No construction is proposed – the existing switching station was built in 1963.

Tuesday, 5 May 2020
Stewart Planning 2020. APP-001003: Rezoning from Institutional to Local Business.

An application for exemption from conducting an EIA and preparing an ECC because the rezoning of land from Institutional to Local Business is not a listed activity.

Wednesday, 29 April 2020
Stewart Planning 2020. APP-001313: Sale and Permanent Closure of the Remainder of Erf 2009 Walvis Bay Ext 5 as a Railway Reserve/Street.

To consult the Environmental Commissioner to determine whether the sale and permanent closure of a railway reserve is a listed activity and whether this activity requires an ECC.

Thursday, 9 April 2020
Stewart Planning 2020. APP-001282: Erf 3150 Orwetoveni Extension 7: ECC Application.

Rezoning of land from Residential to Commercial Use is a listed activity that may not be undertaken without Environmental Clearance Certificate as per Environmental Management Act No 7 of 2007 and it's Regulations.

Thursday, 27 February 2020
Enviro Management Consultants Namibia 2020. APP-001125: Township Establishment at Nkurenkuru Extension 4 and 5, Erf 525 and Kahenge Extension 1 in Kavango West Region.

Application for extension of validity of an existing ECC.

Thursday, 27 February 2020
Enviro Management Consultants Namibia 2020. APP-001123: Contract No. RA/CS-CR/01-2015: Consultancy services for the detailed design, tender documentation, contractor administration and site supervision for the rehabilitation of TR10/2: Onhuno - Eenhana in the Ohangwena Region.
Thursday, 27 February 2020
Enviro Management Consultants Namibia 2020. APP-001122: Environmental Clearance for the proposed partial improvement of TR2/1, and the upgrading to freeway standards of MR44 and MR36; Walvisbay - Swakopmund.

The application is for change of conditions for extension of validity of an existing ECC.