Search results custom

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 50 of 759Click/tap on any title to see full details of the record
Tuesday, 26 January 2021
Enviro Dynamics 2020. APP-002166: Construct and operate two (2) 100m high guyed meteorological masts in the Tsau //Khaeb National Park, Karas Region.

Construct and operate two (2) 100m high guyed meteorological masts at two separate locations in the Tsau //Khaeb National Park, Karas Region. The masts stays require an open area of 80 m diameter. Site 1 coordinates are: -27,035180  - 15323706; - 27,081279 - 15,333276;  - 27,072615 -15,384327; -27,028365 - 15370015. Site 2 coordinates are: -26,754767 - 15,229704; -26,789602 - 15,228319;  -26,796897 - 15, 265570; -26,762654 - 15,260316.

Tuesday, 26 January 2021
Environmental Compliance Consultancy (ECC) 2020. APP-001906: Exploration activities on EPL 7769 for base and rare metals, dimension stones, industrial minerals, and precious metals in the Hardap and Khomas regions.

Exploration activities on EPL 7769 for base and rare metals, dimension stones, industrial minerals, and precious metals in the Hardap and Khomas regions. Environmental Compliance Consultancy (ECC) has been engaged by Jin Peng Investments (Pty) Ltd to act on their behalf for the environmental clearance certificate application for the proposed exploration activities for base and rare metals, dimension stones, industrial minerals and precious metals in the Hardap and Khomas Regions, Namibia. In terms of Section 32 (1) of the Environmental Management Act, No.

Monday, 25 January 2021
Geo Pollution Technologies 2020. APP-002162: Environmental Clearance Certificate Renewal for Maltahöhe Service Station.

ECC is for the continued operations of the Maltahöhe Service Station.

Friday, 15 January 2021
Stubenrauch Planning Consultants 2020. APP-002197 - Township Establishment, creation of street and installation of bulk services for Kahenge Extensions 5, 6 and 7, Nkurenkuru, Kavango West Region.

Activity 10.1 (a) Infrastructure: The construction of oil, water, gas, and petrochemical and other bulk supply pipelines Activity10.1 (b) (Infrastructure) The construction of - Public roads. Activity 10.2 (a) (Infrastructure) The route determination of roads and design of associated physical infrastructure where - it is a public road.

Friday, 15 January 2021
Omavi Geotechnical and Geo-environmental Consultants 2020. APP-002042: Application for an Environmental Clearance Certificate (ECC) for the proposed small-scale mining of slate stone on mining claims 72110 and 72111 near Gibeon in the Hardap Region.

The proponent (Olivia Platt) proposes to carry out small-scale quarrying and processing of mudstone/ shale/ siltstone/ slate/ sandstone rocks for production of slate stone floor and wall tiles on mining claim 72110 -72111 in the Hardap Region. Mining Claim 72110 - 72111 is situated north of the Gibeon village in the south western areas of the Hardap Region. The site can be accessed via the B1 road approximately 55 km south from Mariental Town. In line with the Environmental Management Act (EMA) No.

Friday, 15 January 2021
LM Environmental Consulting 2020. APP-001936: Environmental Assessment for an Irrigation Project (Annual Crop Production) by Wagnou Irrigation CC on Farm Okambekere No. 662, Okorukambe Constituency, Omaheke Region, Namibia.

Forestry activities 4. The clearance of forest areas, deforestation, aforestation, timber harvesting or any other related activity that requires authorisation in term of the Forest Act, 2001 (Act No. 12 of 2001) or any other law. Agriculture and Aquaculture activities 7.5 Pest control. Water resource developments 8.1 The abstraction of ground or surface water for industrial or commercial purposes. 8.7 Irrigation schemes for agriculture excluding domestic irrigation.

Tuesday, 12 January 2021
Marvin Environmental Project Consultants 2020. APP-002232: Environmental Management Plan for Wolf Briquettes Processing Factory in Erongosig, Usakos.

The Forest Stewardship Council (FSC) in Namibia only certifies Charcoal/ Briquette if the manufacturer can prove that it complies with the FSC requirements stipulated in the: FSC STD 40-004 Version 2 for trading and manufacturing organisations using 100% FSC material. The Standard aims at responsible management of Namibia’s forest resources whilst conserving and restoring the ecosystem and protecting workers rights. The scope includes natural forests including invasive species "thorn bushes" and non-timber forest products such as venison products and Marula fruit.

Tuesday, 12 January 2021
Environam Consultants Trading (ECT) 2020. APP-002227: Proposed Construction of an 18MW Solar Power Plant on Lease 16 of Farm 38, Walvis Bay, Erongo Region.

Activity 1 (a) The generation of electricity. Activity 1 (b) The transmission and supply of electricity. Namibia is regarded as a net exporter of electricity, local electricity generation is derived from hydropower, coal and diesel burning power stations; however this is not enough to meet local demand (INCUNFCC, 2002) necessitating the country to source the balance, amounting to more than 60%, from other countries within the Southern African region such as Zambia, South Africa, Zimbabwe and Mozambique; of which South Africa’s contribution is dominant at 53% (von Oertzen, 2012).

Thursday, 31 December 2020
Stubenrauch Planning Consultants 2020. APP-002196: Environmental Clearance Certificate renewal for the Township Establishment of Tulaing Estate Proper, Extension 1 and Extension 2, creation of street and installation of associated infrastructure, Karibib, Erongo Region.

Tulaing Properties (Pty) Ltd applied for an Environmental Clearance Certificate (ECC) for the Township Establishment of Tulaing Estate Proper, Extension 1 and Extension 2, Creation of Street and Installation of associated infrastructure, Karibib, Erongo Region in 2017. The Environmental Assessment (EA) for the proposed development was conducted by Africa Planning Forum in 2017. Following the submission of the final Environmental Assessment Report, the ECC was granted as per letter dated 27 February 2018 (Appendix A).

Thursday, 31 December 2020
Stubenrauch Planning Consultants 2020. APP-002224: Subdivision of Erf 53, Omuthiya and the creation of streets, Omuthiya, Oshikoto Region.

Omuthiya Town Council applied for an Environmental Clearance Certificate (ECC) for the Subdivision of Erf 53, Omuthiya and the Creation of Streets, Omuthiya, Oshikoto Region in 2015. The Environmental Assessment (EA) for the proposed development was conducted by Africa Planning Forum in 2015. Following the submission of the final Environmental Assessment Report, the ECC was granted as per letter dated 08 February 2016 (Appendix A).

Thursday, 31 December 2020
Stubenrauch Planning Consultants 2020. APP-001863: Rezoning of land from open space to infrastructure, and route determination of roads in Aimablaagte, Mariental, Hardap Region.

Activity 5.1 (d) The rezoning of land from use for nature conservation or zoned open space to any other land use. Activity10.1 (b) (Infrastructure) The construction of – Public roads. Activity 10.2 (a) (Infrastructure) The route determination of roads and design of associated physical infrastructure where – it is a public road.

Wednesday, 30 December 2020
Geo Pollution Technologies 2020. APP-00197: Operations of the Firm Power Project Anixas II Power Station in Walvis bay, Erongo Region.

NamPower would like to inquire whether the proposed project will require a full EIA or an amendment to the existing Anixas Power Station Environmental Clearance Certificate will be sufficient. The Firm Power project is proposed to be located next to Anixas Power Station in Walvis bay . The proposed generation capacity will be 50 MW. It is envisioned that the Firm Power Station and Anixas Power Station, each will be operated independently. Anixas Power Station has an existing Environmental Clearance Certificate.

Wednesday, 30 December 2020
Independent Environmental Consultants 2020. APP-002179: Proposed Mineral Exploration Activities on EPL 7055 in the Omaheke Region.

The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992.

Wednesday, 30 December 2020
Independent Environmental Consultants 2020. APP-002178: Proposed Mineral Exploration Activities on EPL 7054 in the Omaheke Region.

The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992.

Wednesday, 30 December 2020
Independent Environmental Consultants 2020. APP-002177: Proposed Mineral Exploration Activities on EPL 7053 in the Omaheke Region.

The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992.