Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 50 of 222
Monday, 11 August 2025
Urban Green 2025. 250507005780: Application for the renewal of an Environmental Clearance Certificate for the continuation of an operation of a Broadcasting Base Station on Erf 4443, Extension 12, Walvis Bay, Kuisebmund, Erongo Region.

1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: o Activity 10.1 (g) Infrastructure. Communication networks including towers, telecommunication and marine telecommunication lines and cables. Activity 10.1 (j) Infrastructure. Masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission. 2.

Thursday, 7 August 2025
Impala Environmental Consulting 2025. 250627005993: Renewal of an Environmental Clearance Certificate for marble and granite mining on Mining Licence 236, Karibib, Erongo Region.

The applicant intends to continue to mine marble blocks and granite on the mining licence. The applicant intends to quarry dimension stone blocks for building purposes. The area of interest sits predominantly on marble units and granite from the Karibib Formation. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining and quarrying activities may be undertaken without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations.

Thursday, 7 August 2025
Impala Environmental Consulting 2025. 250627005992: Renewal of an Environmental Clearance Certificate for marble mining on Mining Licence 218, Karibib, Erongo Region.

The applicant intends to continue to mine marble blocks on the mining licence. The applicant intends to quarry dimension stone blocks for building purposes. The area of interest sits predominantly on marble units from the Karibib Formation. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining and quarrying activities may be undertaken without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations.

Thursday, 17 July 2025
Urban Green 2025. 250701006020: Renewal of proposed 132 kV overhead transmission line and substation with metering station, Swakopmund District, Erongo Region.

Renewal of ECC 3078 Bannerman Mining Resources Namibia would like to apply for a renewal of the Environmental Clearance Certificate (ECC - 3078) for the Proposed 132 kV Overhead Transmission Line and Substation with Metering Station in accordance with the Environmental Management Regulations.

Monday, 16 June 2025
Impala Environmental Consulting 2025. 250409005664: Renewal of an Environmental Clearance Certificate for dimension stones and industrial minerals exploration on EPL 8437 situated at Uundundu waNandjila Village near Omakange, Omusati Region.

The applicant intends to continue to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.

Monday, 16 June 2025
Impala Environmental Consulting 2025. 250409005667: Renewal of an Environmental Clearance Certificate for the establishment and mining of industrial minerals on Mining Claims: 70108, 70109, 70110 situated at Uundundu waNandjila Village, Ruacana Constituency, Omusati Region.

The proponent intends to continue with the establishment and mining of industrial minerals for local consumption in the construction industry.The proponent was granted an environmental clearance certificate in July 2022. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No.

Monday, 16 June 2025
Impala Environmental Consulting 2025. 250409005668: Renewal of an Environmental Clearance Certificate for the establishment and mining of industrial minerals (Gypsum and Aggregate) on Mining Claims: 73011, 73012, 73013, 73014, 73015 situated at Uundundu waNandjila Village, Near Omakange, Omusati Region.

The proponent intends to continue with the establishment and mining of industrial minerals for local consumption in the construction industry.The proponent was granted an environmental clearance certificate in October 2022. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No.

Tuesday, 10 June 2025
Impala Environmental Consulting 2025. 250113005174: Environmental Impact Assessment for mineral exploration activities on EPL 9908, Erongo Region.

The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.

Tuesday, 1 April 2025
Impala Environmental Consulting 2025. 240829004616: Environmental Impact Assessment for mineral exploration activities on EPL 9725, Erongo Region.

The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.

Tuesday, 1 April 2025
Impala Environmental Consulting 2025. 240829004617: Environmental Impact Assessment for mineral exploration activities on EPL 9652, Erongo Region.

The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.

Friday, 21 March 2025
Impala Environmental Consulting 2025. 240903004642: Environmental Impact Assessment for mineral exploration activities on EPL 9576, Erongo Region.

The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.

Friday, 21 March 2025
Impala Environmental Consulting 2025. 240905004655: Environmental Impact Assessment for mineral exploration activities on EPL 9629, Erongo Region.

The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.

Thursday, 27 February 2025
Urban Green 2025. 250206005299: Application for the renewal of an Environmental Clearance Certificate (ECC - 02072) for the construction and operation of the Hardap Photovoltaic Power Facility, Mariental District, Hardap Region.

The Renewal of the Environmental Clearance Certificate is for: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power); Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power); Activity 5.1(c) - Land Use and Development Activities Agricultural use to industrial use 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1.

Thursday, 27 February 2025
Urban Green 2025. 250206005300: Application for the renewal of an Environmental Clearance Certificate (ECC-01990) for the construction and operation of the Kokerboom Photovoltaic Power Facility, Keetmanshoop District, //Karas Region.

The Renewal of the Environmental Clearance Certificate is for: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power); Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power); Activity 5.1(c) - Land Use and Development Activities Agricultural use to industrial use 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1.

Friday, 20 December 2024
Impala Environmental Consulting 2024. 240813004543: Environmental Impact Assessment for dimension stone mining on Mining Licence 259, //Karas Region.

The applicant intends to mine dimension stones blocks on the mining license. The applicant intends to quarry dimension stone blocks for building purposes. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mineral exploration and mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).

Friday, 20 December 2024
Impala Environmental Consulting 2024. 240813004544: Environmental Impact Assessment for dimension stone mining on Mining Licence 260, //Karas Region.

The applicant intends to mine dimension stones blocks on the mining license. The applicant intends to quarry dimension stone blocks for building purposes. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mineral exploration and mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).

Friday, 20 December 2024
Impala Environmental Consulting 2024. 240910004675: Environmental Impact Assessment for manganese mining on Mining Licence 241, Otjozondjupa Region.

The applicant intends to mine manganese on the mining license. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mineral exploration and mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).

Monday, 16 December 2024
Impala Environmental Consulting 2024. 240919004694: Environmental Impact Assessment for manganese mining on Mining Licence 263, Otjozondjupa Region.

The applicant intends to mine manganese on the mining license. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mineral exploration and mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).

Thursday, 24 October 2024
Impala Environmental Consulting 2024. 241002004758: Renewal of an Environmental Clearance Certificate for mineral exploration on EPL 7782 within the Erongo Region.

The applicant intends to continue to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.

Thursday, 24 October 2024
Impala Environmental Consulting 2024. 241002004759: Renewal of an Environmental Clearance Certificate for mineral exploration on EPL 7783 within the Erongo Region.

The applicant intends to continue to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.

Friday, 20 September 2024
Urban Green 2024. 240827004605: Application for the renewal of an Environmental Cearance Certificate for the Rosh Pinah solar park on Farm Namuskluft No. 88, Oranjemund District, //Karas Region.

1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: o Activity 1(a) – Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power) o Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power) o Activity 5.1(c) – Land Use and Development Activities Agricultural use to industrial use 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1.

Wednesday, 11 September 2024
Urban Green 2024. 240827004595: Application for the renewal of an Environmental Clearance Certificate for the proposed Klein Windhoek Extension 4 development, Khomas Region.

1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity. Activity 2.3 - Waste Management, Treatment, Handling and Disposal Activities Temporary storage of waste. Activity 4 - Forestry Activities Removal of protected species Activity 5.2 – Land Use and Development Activities Establishment of Land Resettlement Scheme. Activity 8.9 - Water Resource Developments Construction and other activities within a catchment area.

Tuesday, 20 August 2024
Impala Environmental Consulting 2024. 240320003108: Environmental Impact Assessment for mineral exploration activities on EPL 9162, Erongo Region.

The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.

Tuesday, 16 July 2024
Impala Environmental Consulting 2024. 240606003961: Renewal of an Environmental Clearance Certificate for gravel removal activities on Farm Krumhuk, Khomas Region.

The proponent is currently excavating and removing gravel for industrial and construction purposes on farm Krumhuk. The proponent was granted an environmental clearance certificate in December 2021. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).

Monday, 8 July 2024
Impala Environmental Consulting 2024. 240617003993: Renewal of an Environmental Clearance Certificate for an existing Fuel Retail Facility, located between Auas Road and the Western Bypass, Windhoek.

The proponent intends to continue with the retail fuel supply operations on the northern side of the junction between the Auas Road and the Western Bypass, south east of the Eros Airport. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no fuel depot or service may be established without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations. The proponent intends to renew the current certificate.

Tuesday, 2 July 2024
Urban Green 2024. 221125000460: Application for an Environmental Clearance Certificate for Wind Measurement Mast at Farm Schönau No. 126, //Karas District.

The Environmental Clearance Certificate is for:  Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (Wind Power) 2.1. TITLE OF ACTIVITY Hoodia Pilot Wind Measuring Tower 2.2. LOCATION OF ACTIVITY The proposed Hoodia Pilot Wind Measuring Tower will be located at Farm Schönau No. 126, which is located in the southern parts of Namibia, in the //Karas Region, approximately 60 km south-west of //Karasburg Town and 50 km north of the Orange River.

Tuesday, 18 June 2024
Impala Environmental Consulting 2024. 240206002784: Environmental Impact Assessment for mineral exploration activities on EPL 8897, Kunene Region.

The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.

Tuesday, 11 June 2024
Impala Environmental Consulting 2024. 231115002476: Environmental Impact Assessment and Management Plan for the mineral exploration activities on Exclusive Prospecting License (EPL) 7210, southern Namibia.

The scope of this project is limited to obtaining an Environmental Clearance Certificate for the operational Environmental Management Plan (EMP) for the mineral exploration activities on EPL7210 in the Karas Region.

Wednesday, 29 May 2024
Impala Environmental Consulting 2024. 240513003598: Renewal of Environmental Clearance Certificate (ECC-00604) prospecting activities in respect to base and rare metals, industrial minerals, precious metals and precious stone on Exclusive Prospecting Licence (EPL) 6374, South-west of Ruacana in the Kunene Region.

Shiloam Mining and Investments (Pty) Ltd (herein referred to as the proponent), is a fully Namibian registered entity that ventures in minerals exploration and mining. The proponent had initially obtained (on 15 April 2020) an Environmental Clearance Certificate that lapsed on 15 April 2023, and due to delay in respect to renewing the EPL at the Ministry of Mines and Energy, could not effect to process of renewing the ECC.

Friday, 24 May 2024
Impala Environmental Consulting 2024. 240430003521: Environmental Impact Assessment for mining activities on Mining Claim 73434, Kunene Region.

The applicant intends to mine Base and Rare Metals and Semi-Precious Stones from the mining claim. It is foreseen that the mining activities will include trenching and excavating. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mineral exploration and mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).

Friday, 26 April 2024
Urban Green 2024. 230829002062: Environmental Assessment for the proposed new Opuwo Aerodrome and associated infrastructure in Opuwo, Kunene Region.

1.

Monday, 15 April 2024
Impala Environmental Consulting 2024. 240112002657: Environmental Impact Assessment for mineral exploration activities on EPL 9084, ǁKaras Region.

The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.

Monday, 15 April 2024
Impala Environmental Consulting 2024. 240220002845: Environmental Impact Assessment for mineral exploration activities on EPL 8844, ǁKaras Region.

The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.

Wednesday, 10 April 2024
Urban Green 2024. 240220002848: Application for the renewal of an Environmental Clearance Certificate for the construction of the public roads as part of the subdivision of Erven 2167, 2168 and 2169, Extension 6, Henties Bay within the Erongo Region.

THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: Activity 10.1(b) - Infrastructure The construction of public roads 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 TITLE OF ACTIVITY: Subdivision of Erven 2167, 2168 and 2169, Extension 6, Henties Bay 2.2 NATURE OF ACTIVITY: The activity entails the construction of public roads. 2.3 LOCATION OF ACTIVITY: Erven 2167, 2168 and 216 is in Extension 6 (south dune), Henties Bay which is located within the Erongo Region.

Monday, 18 March 2024
Impala Environmental Consulting 2024. 230801001808: Renewal of Environmental Clearance Certificate for exploration activities on EPL 6931, Otjiwarongo District, Otjozondjupa Region.
Proposed mineral exploration activities on EPL 6931, Otjiwarongo District, Otjozondjupa Region.
Thursday, 14 March 2024
Impala Environmental Consulting 2024. 240208002788: Renewal of an Environmental Clearance Certificate for mineral exploration on EPL 4305 within the Kunene Region.
The applicant intends to continue to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
Friday, 8 March 2024
Urban Green 2024. 240205002776: Application for the renewal of an Environmental Certificate for mining activities on Mining Licence (ML 142), Karibib District, Erongo Region.
1. The Renewal of the Environmental Clearance Certificate is for: Continuation of an existing mining activity, for which the initial Environmental Clearance was obtained during June 2017 (see attached Appendix A to the cover letter), which requires authorization in terms of the Minerals (Prospecting and Mining) Act (No. 33 of 1992). 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1 Title of the Activity Continuation of the mining for mineral dimension stone (i.e. marble and granite) on ML 142 held by Namibia Marble and Granite (PTY) Ltd. (NAMAGRA).
Monday, 26 February 2024
Impala Environmental Consulting 2024. 231115002475: Environmental Impact Assessment for mineral exploration activities on EPL 7626, Erongo Region.

The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.

Tuesday, 20 February 2024
Impala Environmental Consulting 2024. 240118002685: Renewal of an Environmental Clearance Certificate for marble mining on Mining Licence 226, Farm Okawayo, Karibib District, Erongo Region.

The applicant intends to continue to mine marble blocks on the mining licence. The applicant intends to quarry dimension stone blocks for building purposes. The area of interest sits predominantly on marble units from the Karibib Formation. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining and quarrying activities may be undertaken without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations.

Tuesday, 20 February 2024
Impala Environmental Consulting 2024. 240118002686: Renewal of an Environmental Clearance Certificate for marble mining on Mining Licence 227, Farm Okawayo, Karibib District, Erongo Region.

The applicant intends to continue to mine marble blocks on the mining licence. The applicant intends to quarry dimension stone blocks for building purposes. The area of interest sits predominantly on marble units from the Karibib Formation. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining and quarrying activities may be undertaken without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations.

Tuesday, 20 February 2024
Impala Environmental Consulting 2024. 240118002687: Renewal of an Environmental Clearance Certificate for marble mining on Mining Licence 228, Farm Okawayo, Karibib District, Erongo Region.

The applicant intends to continue to mine marble blocks on the mining licence. The applicant intends to quarry dimension stone blocks for building purposes. The area of interest sits predominantly on marble units from the Karibib Formation. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining and quarrying activities may be undertaken without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations.

Tuesday, 20 February 2024
Impala Environmental Consulting 2024. 240118002688: Renewal of an Environmental Clearance Certificate for marble mining on Mining Licence 229, Farm Okawayo, Karibib District, Erongo Region.

The applicant intends to continue to mine marble blocks on the mining licence. The applicant intends to quarry dimension stone blocks for building purposes. The area of interest sits predominantly on marble units from the Karibib Formation. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining and quarrying activities may be undertaken without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations.

Thursday, 15 February 2024
Urban Green 2024. 240131002749: Application for the renewal of the Environmental Clearance Certificate for the upgrade of road TR7/1 Karibib to Usakos, Erongo Region.

THE RENEWAL OF THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: The construction of public roads and quarrying for the purpose of base material, as well as potential removal of trees, which requires a permit as per the Forest Act, 2001 (Act No. 12 of 2001) or any other law. The ‘listed activities’ that might be affected are listed below: FORESTRY ACTIVITIES 4. The clearance of forest areas, deforestation, afforestation, timber harvesting or any other related activity that requires authorization in terms of the Forest Act, 2001 (Act No. 12 of 2001) or any other law.

Wednesday, 14 February 2024
Urban Green 2024. 231019002341: ECC-00997 - Application for renewal of an Environmental Clearance Certificate for the proposed township establishment of Amraalsduin Extensions 1 and 2, Leonardville Village, Omaheke Region.

1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: 1. (b) The transmission and supply of electricity. 4. Any other related activity that requires authorization in terms of the forest Act (Act No. 12 of 2001) or any other law. 5.2 The establishment of land resettlement schemes. 10.1 (b) The construction of public roads. 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 Title of the Activity Township Establishment: Amraalsduin Extensions 1& 2.

Wednesday, 31 January 2024
Urban Green 2024. 231101002398: Application for an Environmental Clearance Certificate for the proposed relocation of the current 66kV and 132kV Hosea Kutako Interchange Transmission Line (Khomas Region).

1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: The 'listed activities' that might be included as part of this development are listed below: o Activity 1 - Energy Generation, Transmission and Storage Activities (b) The construction of facilities for the transmission and supply of electricity o Activity 4 – Forestry Activities The clearance of forest areas, deforestation, afforestation, timber harvesting or any other related activity that requires authorization in terms of the Forest Act, 2001 (Act No. 12 of 2001) or any other law. 2.