These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: o Activity 10.1 (g) Infrastructure. Communication networks including towers, telecommunication and marine telecommunication lines and cables. Activity 10.1 (j) Infrastructure. Masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission. 2.
The applicant intends to continue to mine marble blocks and granite on the mining licence. The applicant intends to quarry dimension stone blocks for building purposes. The area of interest sits predominantly on marble units and granite from the Karibib Formation. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining and quarrying activities may be undertaken without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations.
The applicant intends to continue to mine marble blocks on the mining licence. The applicant intends to quarry dimension stone blocks for building purposes. The area of interest sits predominantly on marble units from the Karibib Formation. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining and quarrying activities may be undertaken without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations.
Renewal of ECC 3078 Bannerman Mining Resources Namibia would like to apply for a renewal of the Environmental Clearance Certificate (ECC - 3078) for the Proposed 132 kV Overhead Transmission Line and Substation with Metering Station in accordance with the Environmental Management Regulations.
The applicant intends to continue to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
The proponent intends to continue with the establishment and mining of industrial minerals for local consumption in the construction industry.The proponent was granted an environmental clearance certificate in July 2022. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No.
The proponent intends to continue with the establishment and mining of industrial minerals for local consumption in the construction industry.The proponent was granted an environmental clearance certificate in October 2022. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No.
The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
Attachment | Size |
---|---|
5174_SR_EPL 9908 Erongo Region.pdf | 3.2 MB |
5174_EMP_EPL 9908 Erongo Region.pdf | 610.4 KB |
5174_Declaration of Authorship_EPL 9908 Erongo Region.pdf | 249.35 KB |
5174_Gaingu Conservancy_EPL 9908 Erongo Region.pdf | 317.94 KB |
5174_MME Grant_EPL 9908 Erongo Region.pdf | 507.63 KB |
5174_Proof of Consultation_EPL 9908 Erongo Region.pdf | 1.04 MB |
5174_Map_EPL 9908 Erongo Region.pdf | 506.74 KB |
5174_NHC Consent_EPL 9908 Erongo Region.pdf | 579.54 KB |
5174_Screening Notice_EPL 9908 Erongo Region.pdf | 271.6 KB |
5174_CV_EPL 9908 Erongo Region.pdf | 345.96 KB |
The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
Attachment | Size |
---|---|
4616_SR_EPL 9725_Erongo Region.pdf | 2.61 MB |
4616_EMP_EPL 9725_Erongo Region.pdf | 1.3 MB |
4616_MME Grant_EPL 9725_Erongo Region.pdf | 5.81 MB |
4616_Receipt_EPL 9725_Erongo Region.pdf | 47.87 KB |
4616_Proof of Consultation_EPL 9725_Erongo Region.pdf | 666.69 KB |
4616_Map_EPL 9725_Erongo Region.pdf | 505.68 KB |
4616_NHC Consent_EPL 9725_Erongo Region.pdf | 122.49 KB |
4616_Screening Notice_EPL 9725_Erongo Region.pdf | 255.62 KB |
4616_CV_EPL 9725_Erongo Region.pdf | 359.76 KB |
The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
Attachment | Size |
---|---|
4617_SR_EPL 9652_Erongo Region.pdf | 2.51 MB |
4617_EMP_EPL 9652_Erongo Region.pdf | 1.3 MB |
4617_MME Grant_EPL 9652_Erongo Region.pdf | 6.02 MB |
4617_Receipt_EPL 9652_Erongo Region.pdf | 47.87 KB |
4617_Proof of Consultation_EPL 9652_Erongo Region.pdf | 666.68 KB |
4617_Map_EPL 9652_Erongo Region.pdf | 487.79 KB |
4617_NHC Consent_EPL 9652_Erongo Region.pdf | 129.44 KB |
4617_Screening Notice_EPL 9652_Erongo Region.pdf | 254.93 KB |
4617_CV_EPL 9652_Erongo Region.pdf | 359.76 KB |
The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
Attachment | Size |
---|---|
4642_SR_EPL 9576_Erongo Region.pdf | 2.64 MB |
4642_EMP_EPL 9576_Erongo Region.pdf | 1.3 MB |
4642_MME Grant_EPL 9576_Erongo Region.pdf | 1.55 MB |
4642_Proof of Consultation_EPL 9576_Erongo Region.pdf | 494.75 KB |
4642_Proof of Consultation 2_EPL 9576_Erongo Region.pdf | 666.69 KB |
4642_Map_EPL 9576_Erongo Region.pdf | 484.32 KB |
4642_NHC Consent_EPL 9576_Erongo Region.pdf | 121.21 KB |
4642_Screening Notice_EPL 9576_Erongo Region.pdf | 255.17 KB |
4642_CV_EPL 9576_Erongo Region.pdf | 359.76 KB |
The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
Attachment | Size |
---|---|
4655_SR_EPL 9629_Erongo Region.pdf | 2.84 MB |
4655_EMP_EPL 9629_Erongo Region.pdf | 1.3 MB |
4655_MME Grant_EPL 9629_Erongo Region.pdf | 673.67 KB |
4655_Proof of Consultation_EPL 9629_Erongo Region.pdf | 494.75 KB |
4655_Proof of Consultation2_EPL 9629_Erongo Region.pdf | 1.02 MB |
4655_Map_EPL 9629_Erongo Region.pdf | 517.92 KB |
4655_NHC Consent_EPL 9629_Erongo Region.pdf | 134.04 KB |
4655_Screening Notice_EPL 9629_Erongo Region.pdf | 254.74 KB |
4655_CV_EPL 9629_Erongo Region.pdf | 359.76 KB |
The Renewal of the Environmental Clearance Certificate is for: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power); Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power); Activity 5.1(c) - Land Use and Development Activities Agricultural use to industrial use 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1.
The Renewal of the Environmental Clearance Certificate is for: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power); Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power); Activity 5.1(c) - Land Use and Development Activities Agricultural use to industrial use 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1.
1.
The applicant intends to mine dimension stones blocks on the mining license. The applicant intends to quarry dimension stone blocks for building purposes. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mineral exploration and mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).
Attachment | Size |
---|---|
4543_SR_ML 259_Karas Region.pdf | 3.1 MB |
4543_EMP_ML 259_Karas Region.pdf | 562.99 KB |
4543_MME Application_ML 259_Karas Region.pdf | 352.96 KB |
4543_Proof of Consultation_ML 259_Karas Region.pdf | 1.67 MB |
4543_Map_ML 259_Karas Region.pdf | 462.19 KB |
4543_NHC Consent_ML 259_Karas Region.pdf | 352.45 KB |
4543_Screening Notice_ML 259_Karas Region.pdf | 246.63 KB |
4543_CV_ML 259_Karas Region.pdf | 359.76 KB |
The applicant intends to mine dimension stones blocks on the mining license. The applicant intends to quarry dimension stone blocks for building purposes. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mineral exploration and mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).
Attachment | Size |
---|---|
4544_SR_ML 260_Karas Region.pdf | 2.97 MB |
4544_EMP_ML 260_Karas Region.pdf | 556.25 KB |
4544_MME Consent_ML 260_Karas Region.pdf | 320.38 KB |
4544_Proof of Consultation_ML 260_Karas Region.pdf | 1.67 MB |
4544_Map_ML 260_Karas Region.pdf | 366.49 KB |
4544_NHC Consent_ML 260_Karas Region.pdf | 372.77 KB |
4544_Screening Notice_ML 260_Karas Region.pdf | 245.33 KB |
4544_CV_ML 260_Karas Region.pdf | 359.76 KB |
The applicant intends to mine manganese on the mining license. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mineral exploration and mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).
1.
The applicant intends to mine manganese on the mining license. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mineral exploration and mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).
The applicant intends to continue to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
Attachment | Size |
---|---|
4758_EMP_EPL 7782 within the Erongo Region.pdf | 1013.24 KB |
4758_ECC Old_EPL 7782 within the Erongo Region.pdf | 1.44 MB |
4758_Map_EPL 7782 within the Erongo Region.pdf | 545.62 KB |
4758_Screening Notice_EPL 7782 within the Erongo Region.pdf | 222.78 KB |
4758_CV_EPL 7782 within the Erongo Region.pdf | 359.76 KB |
The applicant intends to continue to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
Attachment | Size |
---|---|
4759_EMP_EPL 7783 within the Erongo Region.pdf | 991.97 KB |
4759_ECC Old_EPL 7783 within the Erongo Region.pdf | 1.39 MB |
4759_Map_EPL 7783 within the Erongo Region.pdf | 540.58 KB |
4759_Screening Notice_EPL 7783 within the Erongo Region.pdf | 220.7 KB |
4759_CV_EPL 7783 within the Erongo Region.pdf | 359.76 KB |
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: o Activity 1(a) – Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power) o Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power) o Activity 5.1(c) – Land Use and Development Activities Agricultural use to industrial use 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity. Activity 2.3 - Waste Management, Treatment, Handling and Disposal Activities Temporary storage of waste. Activity 4 - Forestry Activities Removal of protected species Activity 5.2 – Land Use and Development Activities Establishment of Land Resettlement Scheme. Activity 8.9 - Water Resource Developments Construction and other activities within a catchment area.
The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
Attachment | Size |
---|---|
3108_SR_EPL 9162_Erongo Region.pdf | 2.6 MB |
3108_EMP_EPL 9162_Erongo Region.pdf | 610.94 KB |
3108_MME Grant_EPL 9162_Erongo Region.pdf | 497.85 KB |
3108_Proof of Consultation_EPL 9162_Erongo Region.pdf | 703.48 KB |
3108_Map_EPL 9162_Erongo Region.pdf | 500.72 KB |
3108_NHC Consent_EPL 9162_Erongo Region.pdf | 117.83 KB |
3108_Screening Notice_EPL 9162_Erongo Region.pdf | 246.64 KB |
3108_CV_EPL 9162_Erongo Region.pdf | 359.76 KB |
3108_BID_EPL 9162_Erongo Region.pdf | 1.49 MB |
The proponent is currently excavating and removing gravel for industrial and construction purposes on farm Krumhuk. The proponent was granted an environmental clearance certificate in December 2021. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).
The proponent intends to continue with the retail fuel supply operations on the northern side of the junction between the Auas Road and the Western Bypass, south east of the Eros Airport. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no fuel depot or service may be established without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations. The proponent intends to renew the current certificate.
The Environmental Clearance Certificate is for: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (Wind Power) 2.1. TITLE OF ACTIVITY Hoodia Pilot Wind Measuring Tower 2.2. LOCATION OF ACTIVITY The proposed Hoodia Pilot Wind Measuring Tower will be located at Farm Schönau No. 126, which is located in the southern parts of Namibia, in the //Karas Region, approximately 60 km south-west of //Karasburg Town and 50 km north of the Orange River.
1.
The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
Attachment | Size |
---|---|
2784_SR_EPL 8897 Kunene Region.pdf | 5.55 MB |
2784_EMP_EPL 8897 Kunene Region.pdf | 1.3 MB |
2784_MME Grant_EPL 8897 Kunene Region.pdf | 330.27 KB |
2784_Map_EPL 8897 Kunene Region.pdf | 502.71 KB |
2784_NHC Consent_EPL 8897 Kunene Region.pdf | 130.51 KB |
2784_Screening Notice_EPL 8897 Kunene Region.pdf | 76.52 KB |
2784_CV_EPL 8897 Kunene Region.pdf | 345.96 KB |
The scope of this project is limited to obtaining an Environmental Clearance Certificate for the operational Environmental Management Plan (EMP) for the mineral exploration activities on EPL7210 in the Karas Region.
Attachment | Size |
---|---|
2476_SR_EPL 7210 southern Namibia.pdf | 5.88 MB |
2476_EMP_EPL 7210 southern Namibia.pdf | 179.57 KB |
2476_EPL_EPL 7210 southern Namibia.pdf | 167.99 KB |
2476_Proof of Consultation_EPL 7210 southern Namibia.pdf | 1.03 MB |
2476_Map_EPL 7210 southern Namibia.pdf | 618.81 KB |
2476_Screening Notice_EPL 7210 southern Namibia.pdf | 75.86 KB |
2476_CV_EPL 7210 southern Namibia.pdf | 1.32 MB |
Shiloam Mining and Investments (Pty) Ltd (herein referred to as the proponent), is a fully Namibian registered entity that ventures in minerals exploration and mining. The proponent had initially obtained (on 15 April 2020) an Environmental Clearance Certificate that lapsed on 15 April 2023, and due to delay in respect to renewing the EPL at the Ministry of Mines and Energy, could not effect to process of renewing the ECC.
The applicant intends to mine Base and Rare Metals and Semi-Precious Stones from the mining claim. It is foreseen that the mining activities will include trenching and excavating. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mineral exploration and mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).
Attachment | Size |
---|---|
3521_SR_MC 73434_Kunene Region.pdf | 3.05 MB |
3521_EMP_MC 73434_Kunene Region.pdf | 609.54 KB |
3521_Letter MME_MC 73434_Kunene Region.pdf | 216.75 KB |
3521_Proof of Consultation_MC 73434_Kunene Region.pdf | 1.27 MB |
3521_Map_MC 73434_Kunene Region.pdf | 501.82 KB |
3521_Screening Notice_MC 73434_Kunene Region.pdf | 225.47 KB |
3521_CV_MC 73434_Kunene Region.pdf | 345.96 KB |
3521_BID_MC 73434_Kunene Region.pdf | 1.23 MB |
1.
1.
Attachment | Size |
---|---|
2062_SR_Opuwo Aerodrome.pdf | 2.68 MB |
2062_EMP_Opuwo Aerodrome.pdf | 789.12 KB |
2062_Support Letter_Opuwo Aerodrome.pdf | 235.19 KB |
2062_Proof of Consultation_Opuwo Aerodrome.pdf | 1.49 MB |
2062_Map_Opuwo Aerodrome.pdf | 170.24 KB |
2062_Screening Notice_Opuwo Aerodrome.pdf | 74.83 KB |
2062_CV_Opuwo Aerodrome.pdf | 53.91 KB |
2062_BID_Opuwo Aerodrome.pdf | 323.43 KB |
The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: Activity 10.1(b) - Infrastructure The construction of public roads 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 TITLE OF ACTIVITY: Subdivision of Erven 2167, 2168 and 2169, Extension 6, Henties Bay 2.2 NATURE OF ACTIVITY: The activity entails the construction of public roads. 2.3 LOCATION OF ACTIVITY: Erven 2167, 2168 and 216 is in Extension 6 (south dune), Henties Bay which is located within the Erongo Region.
Attachment | Size |
---|---|
1808_EMP_EPL 6931 Otjiwarongo District.pdf | 1.62 MB |
1808_Map_EPL 6931 Otjiwarongo District.pdf | 329.16 KB |
1808_Screening Notice_EPL 6931 Otjiwarongo District.pdf | 286.34 KB |
1808_CV_EPL 6931 Otjiwarongo District.pdf | 122.15 KB |
Attachment | Size |
---|---|
2776_EMP_ML 142_Karibib District.pdf | 2.06 MB |
2776_Environmental Audit_ML 142_Karibib District.pdf | 591.7 KB |
2776_ECC Old_ML 142_Karibib District.pdf | 390.12 KB |
2776_Map_ML 142_Karibib District.pdf | 162.79 KB |
2776_Screening Notice_ML 142_Karibib District.pdf | 74.35 KB |
2776_CV_ML 142_Karibib District.pdf | 60.4 KB |
The applicant intends to explore the project area through non-invasive and invasive methods to determine if viable mineral deposits exist. It is foreseen that the exploration will include field mapping, surveying, literature review (non-invasive), drilling (invasive), trenching (invasive), Sampling, Analysis, Geological Modelling and Resource Estimation (non-invasive) over a period of an initial period of 3 years. The invasive activities would comprise digging of trenches and drilling of surface boreholes spaced from each other.
Attachment | Size |
---|---|
2475_EIA_EPL 7626 Erongo Region.pdf | 3.58 MB |
2475_EMP_EPL 7626 Erongo Region.pdf | 610.73 KB |
2475_Proof of Consultation_EPL 7626 Erongo Region.pdf | 1.76 MB |
2475_Map_EPL 7626 Erongo Region.pdf | 565.21 KB |
2475_NHC Application_EPL 7626 Erongo Region.pdf | 135.48 KB |
2475_Screening Notice_EPL 7626 Erongo Region.pdf | 64.29 KB |
2475_CV_EPL 7626 Erongo Region.pdf | 120.74 KB |
The applicant intends to continue to mine marble blocks on the mining licence. The applicant intends to quarry dimension stone blocks for building purposes. The area of interest sits predominantly on marble units from the Karibib Formation. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining and quarrying activities may be undertaken without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations.
Attachment | Size |
---|---|
2685_EMP_ML 226 Farm Okawayo Karibib District.pdf | 1.22 MB |
2685_ECC Old_ML 226 Farm Okawayo Karibib District.pdf | 259.85 KB |
2685_Map_ML 226 Farm Okawayo Karibib District.pdf | 521.44 KB |
2685_Screening Notice_ML 226 Farm Okawayo Karibib District.pdf | 69.54 KB |
2685_CV_ML 226 Farm Okawayo Karibib District.pdf | 359.76 KB |
The applicant intends to continue to mine marble blocks on the mining licence. The applicant intends to quarry dimension stone blocks for building purposes. The area of interest sits predominantly on marble units from the Karibib Formation. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining and quarrying activities may be undertaken without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations.
Attachment | Size |
---|---|
2686_EMP_ML 227 Farm Okawayo Karibib District.pdf | 1.06 MB |
2686_ECC Old_ML 227 Farm Okawayo Karibib District.pdf | 253.86 KB |
2686_Map_ML 227 Farm Okawayo Karibib District.pdf | 538.95 KB |
2686_Screening Notice_ML 227 Farm Okawayo Karibib District.pdf | 69.54 KB |
2686_CV_ML 227 Farm Okawayo Karibib District.pdf | 359.76 KB |
The applicant intends to continue to mine marble blocks on the mining licence. The applicant intends to quarry dimension stone blocks for building purposes. The area of interest sits predominantly on marble units from the Karibib Formation. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining and quarrying activities may be undertaken without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations.
Attachment | Size |
---|---|
2687_EMP_ML 228 Farm Okawayo Karibib District.pdf | 1.06 MB |
2687_ECC Old_ML 228 Farm Okawayo Karibib District.pdf | 255.88 KB |
2687_Map_ML 228 Farm Okawayo Karibib District.pdf | 472.41 KB |
2687_Screening Notice_ML 228 Farm Okawayo Karibib District.pdf | 69.16 KB |
2687_CV_ML 228 Farm Okawayo Karibib District.pdf | 359.76 KB |
The applicant intends to continue to mine marble blocks on the mining licence. The applicant intends to quarry dimension stone blocks for building purposes. The area of interest sits predominantly on marble units from the Karibib Formation. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mining and quarrying activities may be undertaken without an environmental clearance certificate. As such, an environmental clearance certificate must be applied for in accordance with regulation 6 of the 2012 environmental regulations.
Attachment | Size |
---|---|
2688_EMP_ML 229 Farm Okawayo Karibib District.pdf | 1.06 MB |
2688_ECC Old_ML 229 Farm Okawayo Karibib District.pdf | 260.98 KB |
2688_Map_ML 229 Farm Okawayo Karibib District.pdf | 474.49 KB |
2688_Screening Notice_ML 229 Farm Okawayo Karibib District.pdf | 69.24 KB |
2688_CV_ML 229 Farm Okawayo Karibib District.pdf | 359.76 KB |
THE RENEWAL OF THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: The construction of public roads and quarrying for the purpose of base material, as well as potential removal of trees, which requires a permit as per the Forest Act, 2001 (Act No. 12 of 2001) or any other law. The ‘listed activities’ that might be affected are listed below: FORESTRY ACTIVITIES 4. The clearance of forest areas, deforestation, afforestation, timber harvesting or any other related activity that requires authorization in terms of the Forest Act, 2001 (Act No. 12 of 2001) or any other law.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: 1. (b) The transmission and supply of electricity. 4. Any other related activity that requires authorization in terms of the forest Act (Act No. 12 of 2001) or any other law. 5.2 The establishment of land resettlement schemes. 10.1 (b) The construction of public roads. 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 Title of the Activity Township Establishment: Amraalsduin Extensions 1& 2.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: The 'listed activities' that might be included as part of this development are listed below: o Activity 1 - Energy Generation, Transmission and Storage Activities (b) The construction of facilities for the transmission and supply of electricity o Activity 4 – Forestry Activities The clearance of forest areas, deforestation, afforestation, timber harvesting or any other related activity that requires authorization in terms of the Forest Act, 2001 (Act No. 12 of 2001) or any other law. 2.