The records can be filtered using the search boxes. Or leave this page and do a full search of all records.
| Attachment | Size | 
|---|---|
| Review of Electricity Policy in Namibia.pdf | 3.83 MB | 
| Attachment | Size | 
|---|---|
| Technical Report on Hydro_electric Power Development in the Namibian section of the Okavango River Basin.pdf | 639.37 KB | 
| Attachment | Size | 
|---|---|
| Pre_feasibility study for the Popa Falls Hydro Power Project_Final Report_2003.pdf | 785.58 KB | 
| Attachment | Size | 
|---|---|
| Popa_Falls_Divundu_Hydro_Power_Project_Pre-feasibility_Study.pdf | 653.16 KB | 
| Attachment | Size | 
|---|---|
| EAPAN 2014 mini conference proceeding.pdf | 1.01 MB | 
| Attachment | Size | 
|---|---|
| Raptor use and abuse of powerlines in southern Africa.pdf | 437.59 KB | 
| Attachment | Size | 
|---|---|
| 2009_Etango_vertebrates_vegetation_ecology.pdf | 2.13 MB | 
| Attachment | Size | 
|---|---|
| Review of the conflict between migratory birds and the electricity power grids in the African_Eurasian Region_10th meeting.pdf | 2.63 MB | 
| Attachment | Size | 
|---|---|
| EIA Power Lines Uubvlei to Obib Volume 1_2005.zip | 2.68 MB | 
| Attachment | Size | 
|---|---|
| Namibias energy support problem_The Epupa scheme.pdf | 141.37 KB | 
| Attachment | Size | 
|---|---|
| substations_2018.zip | 9.25 KB | 
| substations_2018.kml | 259.69 KB | 
| Attachment | Size | 
|---|---|
| 1223_ECC_For the operation of Omburu Substation.pdf | 365.49 KB | 
| 1223_EMP_For the operation of Omburu Substation.pdf | 544.58 KB | 
| 1223_Map_For the operation of Omburu Substation.pdf | 1.07 MB | 
| Attachment | Size | 
|---|---|
| 1554_EMP_Construction of a Short Power supply line Project_Karasburg.pdf | 1.46 MB | 
| 1554_Map_Construction of a Short Power supply line Project_Karasburg.pdf | 156.55 KB | 
| Attachment | Size | 
|---|---|
| Power line collisions in the Karoo conserving Ludwigs bustard.pdf | 7.96 MB | 
| Attachment | Size | 
|---|---|
| 1599_EMP_ The operation of the 220KV Omburu_Gerus transmission line.pdf | 804.74 KB | 
| 1599_Map_ The operation of the 220KV Omburu_Gerus transmission line.pdf | 259.99 KB | 
| Attachment | Size | 
|---|---|
| 1673_Map_The operation of the 66KV Otjiwarongo_Matemba Transmission Line in Otjozondjupa Region.pdf | 354.43 KB | 
| Attachment | Size | 
|---|---|
| Anon 1975 Construction of powerline and water pipeline or canal through the Etosha Nat Park Roan News Special Edition pp1_3.pdf | 220.77 KB | 
| Attachment | Size | 
|---|---|
| 1670_EMP_The operation of the 66KV Gerus-Platveld Transmission Line.pdf | 939.48 KB | 
| 1670_Map_The operation of the 66KV Gerus-Platveld Transmission Line.pdf | 328.5 KB | 
| Attachment | Size | 
|---|---|
| Powerlines surveyed.kmz | 143.89 KB | 
| Attachment | Size | 
|---|---|
| Incidents.kmz | 143.89 KB | 
| Attachment | Size | 
|---|---|
| 1792_EMP_The operation and management of 22KV Stampriet_Glave Reticulation.pdf | 814.55 KB | 
| 1792_Map_The operation and management of 22KV Stampriet_Glave Reticulation.pdf | 668.71 KB |