Title:
250615005930: The proposed construction and installation of two (2) 4MW wind turbines to generate electricity for the production of biofuels, Wlotzkasbaken Settlement
Publication Year:
2025
Abstract:

Wind is the preferred energy source for the production of biofuels, as it, in contrast to solar power, does not require substantial land allocation. The strategy entails the installation of two 4MW units. The SKORPIoN project is proposed to be located along the Namibian coastline in Wlotzkasbaken between Swakopmund and Henties Bay, in close proximity to the Erongo Desalination Plant and conveniently near the Walvis Bay Port. The project is projected to consume a maximum of 1300 kW; however, the majority of this consumption will stem from processes operating continuously, 24/7. To ensure a reliable power supply, a 10 MWh battery will be installed on-site. In addition, a substation will likely form part of the power management system and be required to feed the power into the grid, pending the outcome of the grid.

Item Type:
Report
Language:
en
Last date for commenting on this EIA: Thursday, 13 November 2025

This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.