These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
J. Shilongo Trading CC (hereinafter referred to as the Proponent) has applied to the Ministry of Industries, Mines and Energy (MIME) to be granted an Exclusive Prospecting License (EPL) No. 10100 . The EPL cover an area of 11466.2209 hectares (ha), located about 28 km north of Kalkfeld, in the Otjozondjupa Region as shown in (Figure 1). The EPL overlies farms such as Kendal, Otjikango Ost, Otjikango, Otjikango Nord, Rheiman, Omakune and Nordenberg (Figure 2).
| Attachment | Size |
|---|---|
| BID_EPL No 10100 located north of Kalkfeld.pdf | 492.77 KB |
Environmental Compliance Consultancy (Pty) Ltd (ECC) has been engaged by Mandarin Investments (Pty) Ltd (hereto referred to as "The Proponent") as the environmental assessment practitioner (EAP) to conduct an environmental scoping with impact assessment and develop an environmental and social management plan (ESMP) on behalf of Namibia Power Corporation (Pty) Ltd (NamPower), for the proposed construction and operation of the 132 kilovolt (kV) overhead power supply and associated infrastructure (switchyard modifications, metering yard and high voltage (HV) switchyard and distribution cables
| Attachment | Size |
|---|---|
| BID_132 KV overhead power supply_Kokoseb Gold Mine Project on ML 274_Erongo Region.pdf | 960.71 KB |
Environmental Compliance Consultancy (Pty) Ltd (ECC) has been engaged by Mandarin Investments (Pty) Ltd (hereinafter referred to as "the Proponent") as the independent Environmental Assessment Practitioner (EAP) to undertake a Scoping and Environmental and Social Impact Assessment (ESIA) and to develop an Environmental and Social Management Plan (ESMP) for the proposed construction and operation of a bulk desalinated water supply pipeline and associated infrastructure from the Trekkopje Mine Water Supply Scheme (TMWSS) to the proposed Kokoseb Gold Project on mining licence (ML) 274, Erongo
| Attachment | Size |
|---|---|
| BID_Kokoseb Gold Project.pdf | 913.74 KB |
Environmental Compliance Consultancy (Pty) Ltd (ECC) has been engaged by CMB.TECH Namibia (Pty) Ltd (hereto referred to as CMB.TECH or "the Proponent") as the environmental assessment practitioner (EAP) to conduct an environmental and social impact assessment (ESIA) and develop an environmental and social management plan (ESMP) for the proposed construction and operation of a green ammonia plant (hereto referred to as the "Project").
| Attachment | Size |
|---|---|
| BID_V2FUEL Arandis_a green ammonia plant_Arandis.pdf | 835.54 KB |
The Oranjemund Town Council hereinafter referred to as the proponent intends to undertake the following activities: Permanent Closure of the Remainder of Erf 1173, Oranjemund Extension 3, as a "Public Open Space"; Rezoning of the Remainder of Erf 1173, Oranjemund Extension 3, from "Public Open Space" to "Special" for a Dome development and support operations. The above development triggers listed activities in terms of the Environmental Management Act (No. 7 of 2007) and Environmental Impact Assessment Regulations (Government Notice No. 30 of 2012).
| Attachment | Size |
|---|---|
| BID_Permanent Closure of the Remainder of Erf 1173_Oranjemund Extension 3_0.pdf | 148.92 KB |
The proposed development entails the rezoning of Erf 3685 from General Residential to Business with a bulk factor of 1.0 to allow for future business-related development. The property is currently vacant/underutilised and is located within an established urban area comprising residential and commercial land uses. The proposed rezoning will permit business activities such as offices, retail, and service-related enterprises, subject to municipal approval.
| Attachment | Size |
|---|---|
| Executive Summary- Tsumeb Extension 13 Oshikoto Region.pdf | 219.28 KB |
Tsumeb Gymnasium proposes to alter the township boundaries of Tsumeb Proper and Tsumeb Extension 13 to establish dedicated teacher housing. The statutory process requires the rezoning, consolidation, and subdivision of the affected parcels to ensure full compliance with the Tsumeb Zoning Scheme regulations. Institutionally, housing educators adjacent to the campus increases their availability for after school activities, extra classes, and hostel supervision, directly reinforcing the school's academic and operational framework.
| Attachment | Size |
|---|---|
| BID_Tsumeb Proper to exclude Erf 2351.pdf | 219.28 KB |
The Proponent intends to formalise the Sonder Water Informal Settlement, which is currently situated on a portion of Erf 1, Klein Aub, land that was originally designated for cemetery purposes. The settlement currently accommodates approximately 120 households and has developed in an unplanned manner, resulting in challenges related to insecure land tenure, limited access to basic municipal services, unregulated development, and fragmented spatial growth.
| Attachment | Size |
|---|---|
| Executive Summary_Proposed development Klein Aub_Namibia.pdf | 182.99 KB |
Green Earth Environmental Consultants have been appointed by Hochland 7191 (Pty) Ltd, the Proponent, to attend to and complete an Environmental Impact Assessment and Environmental Management Plan (EMP) to obtain an Environmental Clearance Certificate as per the requirements of the Environmental Management Act (No. 7 of 2007) and the Environmental Impact Assessment Regulations (GN 30 in GG 4878 of 6 February 2012) to close Portion A of the Remainder of Erf 294, Otjiwarongo, Ozondjupa Region as ‘public open space’ and rezone Portion A to 'general business'.
| Attachment | Size |
|---|---|
| BID_Closure of portion a of the Remainder of Erf 294_Otjiwarongo.pdf | 1.05 MB |
Tutaleni Louisa Jona, hereinafter referred to as the proponent, intends to undertake the following activities: Subdivision of Erf 1376, Benguela Extension 1 into Erf A/1376 and Remainder, Permanent closure of Erf A/1376, Benguela Extension 1 as a "Public Open Space", Consolidation of Erf A/1376, Benguela Extension 1 and Erf 1074, Benguela Extension 1 into consolidated Erf X.
| Attachment | Size |
|---|---|
| BID_Proposed activity in Luederitz_Erf A1376_Benguela Extension 1.pdf | 904.05 KB |
The Oshikuku Town Council, hereinafter referred to as the proponent intends to undertake the following activities: Subdivision of Remainder Erf RE208, Oshikuku Proper into Erf A, B, C, D and Remainder; Permanent Closure of Erf A, B, C and D of erf RE208, Oshikuku Proper as a "Public Open Space"; Rezoning of Erf A/ RE208 from "Public Open Space" to "Local Authority"; Reservation of Erf A/ RE208 for "Local Authority" purposes; Rezoning of Erf B/ RE208 from "Public Open Space" to "Business" with a bulk of 3.0; Rezoning of Erf C/ RE208 from "Public Open Space" to "Institutional"; Rezoning of Er
| Attachment | Size |
|---|---|
| BID_Oshikuku_Subdivision of Erf Re208 Oshikuku Proper.pdf | 1.12 MB |
Mr and Mrs Agenbach hereinafter referred to as the proponent intends to undertake the following activities: Layout approval and township establishment on the Farm Schneidenberg No. 205 to become known as Okahandja Extension 20; Registration of a 15m wide Right of Way Servitude over the Farm Okahandja Town and Townlands No. 277 in favour of the proposed Okahandja Extension 20.
| Attachment | Size |
|---|---|
| Executive Summary_Farm Schneidenberg No 205 to become known as Okahandja Extension 20.pdf | 123.46 KB |
Wesbank Transport, a division of FP du Toit (Pty) Ltd (the Proponent) intends to construct a new purpose-built warehouse for the storage and handling of general, industrial and potentially hazardous cargo on Portion 5 of the Remainder of Farm 38, Walvis Bay, Erongo Region (Figure 1). The cargo will be both exported out and imported into Namibia. The Proponent will provide their services for both Namibian and other southern African clients. All infrastructure for operations must still be constructed.
| Attachment | Size |
|---|---|
| BID_Construction activities_Portion 5 of Farm 38_Walvis Bay.pdf | 378.48 KB |
An Environmental Impact Assessment (EIA) process has commenced to assist in determining the extent and significance of the environmental consequences associated with the proposed Township Establishment of Ongwediva West Proper, Extension 1, Extension 2 and Extension 3 on Portions A-D of the Remainder of the Farm Ongwediva Town and Townlands No. 881. Notice of an Environmental Impact Assessment Process is given in terms of the Environmental Management Act (Act 7 of 2007) and its regulations of the intention to carry out the proposed activity.
| Attachment | Size |
|---|---|
| BID_Ongwediva West Proper_Portions A_D_Remainder of Farm Ongwediva Town and Townlands No 881.pdf | 627.58 KB |
Savannah Environmental Consulting Services CC (the Environmental Assessment Practitioner) has been appointed by Pinnacle Resources CC (hereinafter referred to as "the Proponent") to undertake an Environmental Scoping Assessment (ESA) and Environmental Impact Assessment (EIA) for the proposed small-scale mining activities on Mining Claims (MCs) No. 76313 and 76314, located southwest of Uis in the Erongo Region, as illustrated in Figure 1.
| Attachment | Size |
|---|---|
| BID_MCs No 76313_76314 located south west of Uis.pdf | 425.03 KB |
The Helao Nafidi Town Council hereinafter referred to as the proponent intends to undertake the following activities: Subdivision of the Remainder of Farm Helao Nafidi Town and Townlands No. 997 into Portion A and Remainder; and Layout Approval and Township Establishment on Portion A of the Farm Helao Nafidi Town and Townlands No. 997 to be known as Oshikango Extension 7.
| Attachment | Size |
|---|---|
| BID_Farm Helao Nafidi Town and Townlands No 997_Oshikango Extension 7_Ohangwena Region_2026.pdf | 888.84 KB |
Excel Dynamic Solutions (Pty) Ltd (The Consultant) was appointed by Annelize Weber (The Proponent) to act on their behalf in obtaining the Environmental Clearence Certificate (ECC) for prospecting and exploration activities on Exclusive Prospecting License (EPL) No. 10831. The 902.95 hectares EPL is located around 25 km south-west of Uis in the Daures Constituency, Erongo Region (see figure 1). EPL No. 10831 (center coordinates; -21. 080005, 15.05272) overlays Otjihorongo Reserve in the Otjimboyo communal conservancy.
| Attachment | Size |
|---|---|
| BID_EPL No 10831 located south_west of Uis.pdf | 756.05 KB |
Dangote Industries Namibia (Pty) Ltd (the Proponent) intends to apply for the subdivision of Farm 58, Walvis Bay, into Portions A-F (Dangote portions), Portion G (Street), Portion H and Remainder/58 (Municipality) to prepare for the establishment of a strategic petroleum storage facility on about 70 hectares (678,912 m²) of industrial land situated on Farm 58 in Walvis Bay (the development).
| Attachment | Size |
|---|---|
| BID_Subdivision of Farm 58_Walvis Bay.pdf | 768.15 KB |
Hanvina Investment cc (The Proponent) has applied to the Ministry of Environment, Tourism and Forestry (MEFT) to be granted an Environmental Clearance Certificate (ECC) for the Exclusive Prospecting License (EPL) No. 10101. Excel Dynamic Solutions (Pty) Ltd (The Consultant) was appointed to act on behalf of the proponent in obtaining the ECC. The EPL is located about 30 km south east of Khorixas, in Kunene Region and covers a total surface area of 265169.96 hectares (ha) as shown in (Figure 1).
| Attachment | Size |
|---|---|
| BID_EPL 10101 located east of Khorixas_2026.pdf | 753.37 KB |
Africa Big Rhino Mining (Pty) Ltd (The Proponent) have applied to the Ministry of Industries, Mines and Energy (MIME) to be granted the right to mine for dimension stone (Mable) on Mining Licence (ML) 281. However, prior to granting the approval of the application and subsequent granting of the mining rights, the ML is subjected to an Environmental Clearance Certificate (ECC), Hence an Environmental Impact Assessment study should be conducted. The 1788.6542 hectare (ha) ML is located northeast of Karibib (Figure 1), overlaying farm Okawayo (Figure 2).
| Attachment | Size |
|---|---|
| BID_ML No 281 located northeast of Karibib.pdf | 884.08 KB |
EIA not yet on EIA MEFT Site. SS CONSULTANTS CC (hereafter referred to as the Consultant), an independent mineral resource and environmental consulting company has been appointed by Mr. Naftal Shailemo herein referred to as the Proponent) to undertake an environmental assessment process and obtain an environmental clearance certificate from the Environmental Commissioner on behalf of the latter for the proposed mineral exploration activities on EPL No. 9896.
| Attachment | Size |
|---|---|
| BID_EPL No 9896 Hentiebay_Swakopmund District.pdf | 502.64 KB |
The proponent, Andreas Nghikeno Kalimbo, has applied for mining claims, namely 75626 and 75628 with the Ministry of Mines and Energy. The applicant intends to mine dimension stones (Marble). Impala Environmental Consulting cc was appointed by the proponent to undertake an Environmental Assessment (EA) and Environmental Management Plan (EMP) for the tenement. The map above shows the localities of the mining claims.
| Attachment | Size |
|---|---|
| BID_MCs 75626_75628_4 km southeast of Karibib.pdf | 1.22 MB |
The proponent, Alvina Niiro Hilifavali Hailonga, has applied for mining claims, namely 76187, 76188 and 76189 with the Ministry of Mines and Energy. The applicant intends to mine dimension stones (Marble). Impala Environmental Consulting cc was appointed by the proponent to undertake an Environmental Assessment (EA) and Environmental Management Plan (EMP) for the tenement. The map above shows the localities of the mining claims.
| Attachment | Size |
|---|---|
| BID_MCs 76187_76188_76189 about 3 km southeast of Karibib.pdf | 1.22 MB |
Registration of a 15m wide Right of Way Servitude over the Remainder of Portion B of the Farm Usakos Sud No. 93 in favour of "Portion A".
| Attachment | Size |
|---|---|
| BID_Subdivision and street creation_Portion B_Farm Usakos Sud No 93.pdf | 768.56 KB |
Environmental Clearance Certificate for E.J. Trading Filling Station situated in Oshikango, Ohangwena Region.
This site provides information about Environmental Impact Assessments (EIAs) in progress in Namibia. The Environmental and Social Impact Assessment (ESIA) process is designed to help government and all stakeholders / Interested and/or Affected Parties understand the potential impacts of proposed developments (positive and negative), give stakeholders opportunities to raise concerns and provide input during several stages of the process, thereby strengthening the process to result in best decisions for Namibia’s sustainable development.
Development Workshop Namibia (DWN) has appointed Urban Dynamics Africa (Pty) Ltd (UDA) as the Environmental Assessment Practitioner (EAP) to undertake an Environmental Impact Assessment (EIA) process for the proposed construction of bulk infrastructure required to service a new township development, located in Bukalo Village, Zambezi Region, Namibia. Table of Content 1. Introduction 2. Project description 3. How the EIA process works 4. Anticipated benefits and impacts 5.
| Attachment | Size |
|---|---|
| BID_Proposed construction of bulk infrastructure_Bukalo Village_Zambezi Region.pdf | 441.02 KB |