The records can be filtered using the search boxes. Or leave this page and do a full search of all records.
Attachment | Size |
---|---|
MAWRD_Water Use and Conservation 2000.pdf | 29.92 MB |
Attachment | Size |
---|---|
MAWRD_Shared Water courses 2000.pdf | 13.72 MB |
Attachment | Size |
---|---|
Integrated Water Resource Management in Action_2009.pdf | 1.26 MB |
Attachment | Size |
---|---|
Local Authority Support_Implementing Namibias IWRM Plan_2011.pdf | 345.17 KB |
Attachment | Size |
---|---|
UNW_Status_Report_IWRM 2008.pdf | 1.73 MB |
Attachment | Size |
---|---|
MAWRD_Plan 6_Integrated Framework for Institutional Development and Human Resources Capacity Building 2010.pdf | 3.96 MB |
Attachment | Size |
---|---|
MAWRD_Legislative and Regulatory Framework_2000.pdf | 12.59 MB |
Attachment | Size |
---|---|
Report on a Reconnaissance Soil Survey of Okavangoland with Particular Reference to the Riparian Land Feb 1967.pdf | 2.74 MB |
Attachment | Size |
---|---|
ecologically sustainable water management_bernhardt_2006_D.pdf | 53.75 KB |
Attachment | Size |
---|---|
Water demand management cookbook.pdf | 6.36 MB |
Attachment | Size |
---|---|
Bruns-Negotiating water rights 2005.pdf | 223.95 KB |
Attachment | Size |
---|---|
Engaging disadvantaged communities_2005.pdf | 158.67 KB |
Attachment | Size |
---|---|
Sokile_C_2005_Workshop.pdf | 306.14 KB |
Attachment | Size |
---|---|
Rahaman_Water Resources_2005.pdf | 89.95 KB |
Attachment | Size |
---|---|
SEIA Phase 1 Proposed mine expansion_2008_cover_vol2.zip | 39.25 MB |
2007_Rossing_Expansion_Phase_1_Scoping.pdf | 3.79 MB |
2008_Rossing_Expansion_Phase_1_SEIA.pdf | 3.28 MB |
Attachment | Size |
---|---|
Cuvelai_poster_Groundwater_lowres.pdf | 885.57 KB |
Attachment | Size |
---|---|
Research Discussion Paper 13_1996.pdf | 1.48 MB |
Attachment | Size |
---|---|
Research Discussion Paper 18_1997.pdf | 1.41 MB |
Attachment | Size |
---|---|
Flood assessments for the Gawib River at Langer Heinrich Uranium Mine.pdf | 2.9 MB |
Attachment | Size |
---|---|
Working experience with traditional pastoralists and their way of pasture management_2000.pdf | 473.12 KB |
Attachment | Size |
---|---|
Environmental water requirements non perennial systems_2005.pdf | 14.59 MB |
Attachment | Size |
---|---|
Water relations of the vegetation along the Kuiseb River_1993.pdf | 338.34 KB |
Attachment | Size |
---|---|
Namibia Regional Distinctions and Similarities_Consequences for design of an IWRM.pdf | 380.76 KB |
Attachment | Size |
---|---|
Spotlight_108.pdf | 942.03 KB |
Attachment | Size |
---|---|
Cuvelai Desk Study Report_Version 1.1.pdf | 8.59 MB |
Attachment | Size |
---|---|
IWRM in the Cuvelai Klintenberg.pdf | 499.21 KB |
Attachment | Size |
---|---|
South Angola climate changes_2010.pdf | 940.23 KB |
Attachment | Size |
---|---|
Langer Heinrich Water Supply Draft EIA Nov 2010.pdf | 2.23 MB |
Attachment | Size |
---|---|
Regulating Namibias water resources - mining industry.pdf | 564.52 KB |
Attachment | Size |
---|---|
Julie Wilk hydrology Scenario paper LAST.doc | 453.5 KB |
Attachment | Size |
---|---|
Integrated hydrological model report.pdf | 2.42 MB |
Attachment | Size |
---|---|
Hydrological scenarios for ODMP report.pdf | 3.17 MB |
Attachment | Size |
---|---|
Okavango Floods of Life_8_2010.pdf | 832.81 KB |
Attachment | Size |
---|---|
Okavango Floods of Life_6_2010.pdf | 1.39 MB |
Attachment | Size |
---|---|
Okavango River Chapter_7_2004.pdf | 1.85 MB |
Attachment | Size |
---|---|
Okavango River Chapter_4_2004.pdf | 523.95 KB |
Attachment | Size |
---|---|
Kavango Sand and Water Chapter 6_2003.pdf | 2.4 MB |
Attachment | Size |
---|---|
Kavango Sand and Water Chapter 2_2003.pdf | 1.21 MB |
Attachment | Size |
---|---|
The IUCN review of the southern Okavango Integrated Water Development Project_1993.pdf | 11.53 MB |
Attachment | Size |
---|---|
Water Security for Multi-National River Basin States_ The Special Case of the Okavango River Basin.pdf | 4.01 MB |
Attachment | Size |
---|---|
National IWRM Status Report_Namibia.pdf | 360.17 KB |
Attachment | Size |
---|---|
RA Water Resources Zambezi 02Jan2008.pdf | 2.79 MB |
Attachment | Size |
---|---|
Rural Water Access and Management Approaches in Southern Africa.pdf | 100.65 KB |
Attachment | Size |
---|---|
Inception Report_2013_04_30_Technical Portion_Environmental component _final.pdf | 423.09 KB |
Attachment | Size |
---|---|
2014_07_25_PART I_CAN_Interim Report No_1.pdf | 17.12 MB |
Attachment | Size |
---|---|
2014_07_25_PART II_Cuvelai_Interim Report No_1.pdf | 15.15 MB |
Attachment | Size |
---|---|
2015_09_29_Project Memo on Phases 2 and 3.pdf | 2.33 MB |
Attachment | Size |
---|---|
2016_06_21_PART1_CAN_Interim Report No 3.pdf | 39.07 MB |
Attachment | Size |
---|---|
The Augmentation of Water Supply to the Central Area of Namibia and the Cuvelai_2016.pdf | 26.97 MB |
Attachment | Size |
---|---|
SDP Report Final.pdf | 7.26 MB |