The records can be filtered using the search boxes. Or leave this page and do a full search of all records.
| Attachment | Size |
|---|---|
| SEIA Phase 1 Proposed mine expansion_2008_annex_i_noise.pdf | 7.52 MB |
| Attachment | Size |
|---|---|
| SEIA Phase 1_Proposed mine expansion_Scoping report _15 November 2007.pdf | 2.3 MB |
| Attachment | Size |
|---|---|
| An environmental impact statement for the Rossing Uranium Mine.pdf | 47.74 MB |
| Attachment | Size |
|---|---|
| 2011_EIA Report and draft EMP for the Tubas Project.pdf | 5.44 MB |
| Attachment | Size |
|---|---|
| EIAReportandDraftEMPfortheShiyelaIronProject.pdf | 7.68 MB |
| Attachment | Size |
|---|---|
| Environmental Impact Assessment Report and draft Environmental Management Plan for the Inca Project.pdf | 7.72 MB |
| Attachment | Size |
|---|---|
| 2011_Specialist invertebrate study of the Omahola Project.pdf | 2.51 MB |
| Attachment | Size |
|---|---|
| Scoping Report fo rthe Omahola Project.pdf | 4.67 MB |
| Attachment | Size |
|---|---|
| Vegetation of the Inca_Tubas and Shiyela sites of Reptile Uranium Namibia_2010.pdf | 9.42 MB |
| Attachment | Size |
|---|---|
| Vegetation Impact Assessment for the proposed expansion project at Langer Heinrich Uranium_2009.pdf | 15.7 MB |
| Attachment | Size |
|---|---|
| Specialist Study Report_Visual Assessment_2009.pdf | 7.06 MB |
| Attachment | Size |
|---|---|
| Report on a radiological public hazard assessment for Langer Heinrich_2009.pdf | 1.85 MB |
| Attachment | Size |
|---|---|
| LHU_EIA_Report_27_Aug_2009__Chapter_1_to_Chapter_3.pdf | 16.93 MB |
| Attachment | Size |
|---|---|
| Invertebrate Study of Langer Heinrich Uranium Mining Licence Area_2009.pdf | 2.14 MB |
| Attachment | Size |
|---|---|
| Environmental baseline study of vertebrates in mining licence area 140_2009.pdf | 1.89 MB |
| Attachment | Size |
|---|---|
| Langer Heinrich Uranium Expansion Project_Specialist soils and land capability studies_2009.pdf | 3.57 MB |
| Attachment | Size |
|---|---|
| LHU_EIA_Report_27_Aug_2009_Appendix_J.pdf | 11.01 MB |
| Attachment | Size |
|---|---|
| Appendix G_Air Study.pdf | 7.8 MB |
| Attachment | Size |
|---|---|
| Flood assessments for the Gawib River at Langer Heinrich Uranium Mine.pdf | 2.9 MB |
| Attachment | Size |
|---|---|
| 2008_Trekkopje_Desalination_and_Pipeline_EIA.pdf | 16.39 MB |
| Attachment | Size |
|---|---|
| Factors influencing colonisation processes in two contrasting mine sites in the Namib Desert_2018.pdf | 233.43 KB |
| Attachment | Size |
|---|---|
| QKR Namibia Navachab Gold Mine.ppt | 776.5 KB |
| Attachment | Size |
|---|---|
| Programme Chamber of Mines Strategic Environmental Plan.docx | 302.84 KB |
| Attachment | Size |
|---|---|
| Okanjande Graphite Mine and Okorusu Fluorspar Mine.pptx | 30.48 MB |
| Attachment | Size |
|---|---|
| Namibian National Waste Facility Strategy Feasibility.pptx | 21.98 MB |
| Attachment | Size |
|---|---|
| Mining and Environment workshop photos.zip | 2.82 MB |
| Attachment | Size |
|---|---|
| Environmental Management Otjikoto Gold Mine_2017.pptx | 4.2 MB |
| Attachment | Size |
|---|---|
| Environmental Management at Roessing Uranium.pptx | 16.53 MB |
| Attachment | Size |
|---|---|
| Environmental Management at Namdeb_2017.ppt | 18.32 MB |
| Attachment | Size |
|---|---|
| Environmental Best Practice Guide in Mining - Draft Contents List.pdf | 283.53 KB |
| Attachment | Size |
|---|---|
| Dundee Tsumeb Smelter and Environmental management.pptx | 8.96 MB |
| Attachment | Size |
|---|---|
| Contact list Mining and Environment committee.xlsx | 12.77 KB |
| Attachment | Size |
|---|---|
| Environmental Strategy and Action Plan Namibian Mining Industry.pdf | 2.6 MB |
| Attachment | Size |
|---|---|
| Uranium Exploration and Development_2017.pptx | 7.9 MB |
| Attachment | Size |
|---|---|
| B2Gold Exploration and Environment_2017.pptx | 1.48 MB |