The records can be filtered using the search boxes. Or leave this page and do a full search of all records.
| Attachment | Size | 
|---|---|
| Environmental management plan for operation and maintenance of the Medupi Power Station_2009.pdf | 402.83 KB | 
| Attachment | Size | 
|---|---|
| Mansfeld thesis.pdf | 3.15 MB | 
| Attachment | Size | 
|---|---|
| EIA Power Lines Uubvlei to Obib Volume 2 Appendix_2005.zip | 4.07 MB | 
| Attachment | Size | 
|---|---|
| EIA Power Lines Kudu Gas Power Station.zip | 1.79 MB | 
| Attachment | Size | 
|---|---|
| EIA Kokerboom to Namib Substation_2004.zip | 2.54 MB | 
| Attachment | Size | 
|---|---|
| Appendix EIA Auas Rehoboth_2006.zip | 2.41 MB | 
| Attachment | Size | 
|---|---|
| Final EIA Report Auas Rehoboth 22 June_2006.zip | 2.62 MB | 
| Attachment | Size | 
|---|---|
| Conway G The science of climate change in Africa.pdf | 2.13 MB | 
| Attachment | Size | 
|---|---|
| RA Water Resources Zambezi 02Jan2008.pdf | 2.79 MB | 
| Attachment | Size | 
|---|---|
| Walvisbay_Waterfront development_Potential effects on birds of the RAMSAR site.pdf | 1.81 MB | 
| Attachment | Size | 
|---|---|
| Walvis Bay waterfront development_Potential impacts on birds.pdf | 330.36 KB | 
| Attachment | Size | 
|---|---|
| Impact Assessment to solve Aircraft_Wildlife Collisions.pdf | 133.32 KB | 
| Attachment | Size | 
|---|---|
| Guideline on integrating health into ESIA 2017.pdf | 7.34 MB |