The records can be filtered using the search boxes. Or leave this page and do a full search of all records.
| Attachment | Size |
|---|---|
| Estimating the groundwater reserves in the river and dunes areas along the lower Kuiseb river in Namibia_1999.pdf | 1.09 MB |
| Attachment | Size |
|---|---|
| MAWRD_Strategic Water Resources Assessment 2000.pdf | 41.47 MB |
| Attachment | Size |
|---|---|
| Ground water resources of Africa 1748-9326_7_2_024009.pdf | 1.06 MB |
| Attachment | Size |
|---|---|
| Cuvelai_poster_Groundwater_lowres.pdf | 885.57 KB |
| Attachment | Size |
|---|---|
| LHU_EIA_Report_27_Aug_2009_Appendix_J.pdf | 11.01 MB |
| Attachment | Size |
|---|---|
| Etango_ESIA_BID.pdf | 230.23 KB |
| Attachment | Size |
|---|---|
| Namdeb ORM LOM - Hydrogeological Study Report.pdf | 2.48 MB |
| Attachment | Size |
|---|---|
| Potential water use of lodges in Namibia_2015.pdf | 5.04 MB |
| Attachment | Size |
|---|---|
| The hydrology of the Okavango Delta_2009.pdf | 1.79 MB |
| Attachment | Size |
|---|---|
| Engineering Inception Report_Technical Portion.pdf | 1.27 MB |
| Attachment | Size |
|---|---|
| 2014_07_25_PART I_CAN_Interim Report No_1.pdf | 17.12 MB |
| Attachment | Size |
|---|---|
| 2014_07_25_PART II_Cuvelai_Interim Report No_1.pdf | 15.15 MB |
| Attachment | Size |
|---|---|
| 2015_02_16_CAN Modelling Report.pdf | 3.04 MB |
| Attachment | Size |
|---|---|
| 2014_11_27_Stats and Yield final report Nov 2014.pdf | 1.4 MB |
| Attachment | Size |
|---|---|
| CAN and Cuvelai Presentation_Rundu.pdf | 4.18 MB |
| Attachment | Size |
|---|---|
| CAN and Cuvelai Presentation_Oshakati.pdf | 3.49 MB |
| Attachment | Size |
|---|---|
| CAN and Cuvelai Presentation_Windhoek.pdf | 3.88 MB |
| Attachment | Size |
|---|---|
| Public Consultations on Water Aug Nam_phase1_July 2015.pdf | 253.22 KB |
| Attachment | Size |
|---|---|
| Strategic Environmental Assessment_phase 1 Water Aug Nam_July 2015_.pdf | 525.87 KB |
| Attachment | Size |
|---|---|
| Public Consultations Report_Phase 1 August 2015_Nam Water Augmentation_draft 2015_09_02.pdf | 2 MB |
| Attachment | Size |
|---|---|
| 2015_09_16_Project Update for MAWF.pdf | 2.3 MB |
| Attachment | Size |
|---|---|
| 2015_09_29_Project Memo on Phases 2 and 3.pdf | 2.33 MB |
| Attachment | Size |
|---|---|
| 2016_06_21_PART1_CAN_Interim Report No 3.pdf | 39.07 MB |
| Attachment | Size |
|---|---|
| The Augmentation of Water Supply to the Central Area of Namibia and the Cuvelai_2016.pdf | 26.97 MB |