A stationary plant containing apparatus for large-scale conversion of some form of energy (such as hydraulic, steam, chemical, or nuclear energy) into electrical energy. (Source: MGH)



The listing below shows all records tagged with this term.

The records can be filtered using the search boxes. Or leave this page and do a full search of all records.

Displaying results 51 - 73 of 73 record(s) tagged with this keywordClick/tap on any title to see full details of the record
2018. Nampower substations January 2018.
Downloadable files:
Attachment Size
substations_2018.zip 9.25 KB
substations_2018.kml 259.69 KB
Green Earth Environmental Consultants 2026. 250910006390: Construct and operate a 500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58, Walvis Bay, Erongo Region.
Downloadable files:
Attachment Size
6390_EIA_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 6.18 MB
6390_EMP_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 263.47 KB
6390_Declaration of Authorship_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 161.61 KB
6390_Archaeologial_Heritage Report_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 4.08 MB
6390_Comments_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 278.49 KB
6390_Consent Letter_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 243.05 KB
6390_IAPs_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 54.38 KB
6390_MIME Consent_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 467.44 KB
6390_Notices_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 4.34 MB
6390_Presentation_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 1.93 MB
6390_Proof of Consultation_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 2.14 MB
6390_Map_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 94.64 KB
6390_Screening Notice_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 92.9 KB
6390_CV_500mw renewable energy power plant on Portion 46 of the Remainder of Farm 58Walvis Bay.pdf 16.46 KB
Meissner R 2016. Chapter 2: The Kunene River's state-centric hydropolitical history. Hydropolitics, Interest Groups and Governance DOI 10.1007/978-3-319-38887-8_2
Downloadable files:
Attachment Size
The Kunene Rivers state_centric hydropolitical history.pdf 653.66 KB
Ministry of Mines and Energy (MME) 2017. National Energy Policy Implementation Plan.
Downloadable files:
Attachment Size
National Energy Policy Implementation Plan_2017 draft.pdf 1.02 MB
Ministry of Mines and Energy (MME) 2016. National Renewable Energy Policy for the Republic of Namibia.
Downloadable files:
Attachment Size
National Renewable Energy Policy for the Republic of Namibia.pdf 2.26 MB
Ministry of Mines and Energy (MME) 2017. National Energy Policy.
Downloadable files:
Attachment Size
National Energy Policy_2017.pdf 2.91 MB
Savannah Environmental Consulting Services 2010. Final EIA Report: Proposed Dorper Wind Energy Facility on a site near Molteno, Eastern Cape.
Downloadable files:
Attachment Size
Proposed Dorper Wind Energy Facility.pdf 3.69 MB
2017. Nampower substations December 2017.
Downloadable files:
Attachment Size
substations_2017.zip 9.23 KB
substations_2017.kml 256.29 KB