The purpose of the application is to obtain approval from the Ministry of Environment, Forestry and Tourism in terms of The Environmental Management Act (Act 7 of 2007), SECTION 8: WATER RESOURCE DEVELOPMENTS 8.8 Construction of canals for the diversion of the normal flow of water and water transfer schemes between water catchments and impoundments. 8.9 Construction and other activities within a catchment area; 8.10 Reclamation of land from below or above the high-water mark of the sea or associated inland waters. SECTION 10: INFRASTRUCTURE 10.1 The construction of- (a) construction of bulk supply pipelines (b) public roads; 10.2 Route determination of roads and design of associate physical infrastructure where- (a) public road.
This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.