SLR Environmental Consulting Namibia (Pty) Ltd (SLR) was commissioned by Osino to undertake the Environmental Impact Assessment (EIA) for the water pipeline proposed from the Kranzberg boreholes to the Twin Hills Mine in the Erongo Region. The Project triggers listed activities (as outlined below) in terms of the EIA Regulations 2012 promulgated under the Environmental Management Act, No.7 of 2007. An Environmental Clearance Certificate (ECC) is required from the Ministry of Environment, Forestry and Tourism (MEFT). With the Ministry of Agriculture, Water and Land Reform (MAWLR) as the Competent Authority that needs to be engaged. 10. Infrastructure 10.1 The construction of (a) oil, water, gas and petrochemical and other bulk supply pipelines. The project includes the construction of a water pipeline.
This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.