EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 50 of 1744
Tuesday, 31 December 2024
Green Gain Consultants 2024. 241205005052: Proposed closure of Erf 3352 as a "public open space" and rezoning of Erf 3352 and Erf 3346, Swakopmund Extension 9, from "public open space" and institutional respectively to "local business" with bulk 1.0.

Swakopmund Municipality intends to apply town planning procedures for the permanent closure of Erf 3352 as a Public Open Space and Rezoning Erf 3352 and Erf 3346 from POS and Institutional respectively to Local Business with Bulk 1.0. In terms of Schedule 5.1 of the Environmental Management Act (Act No. 07 of 2007), () and its regulations (GN No. 30 of 2012), the rezoning of land zoned Public Open Space to any other land use cannot be undertaken without an Environmental Impact Assessment being undertaken.

Tuesday, 31 December 2024
Excel Dynamic Solutions 2024. 241129005029: Environmental Scoping Assessment (ESA) for the proposed small- scale mining activities on Mining Claims No. 75626 and 75628, located south east of Karibib, Erongo Region.
For the proposed small- scale mining activities on Mining Claims No. 75626 and 75628, located south east of Karibib, Erongo Region. The target commodities for the proposed mining activities are dimension stones.
Tuesday, 31 December 2024
Envirofficient Consultants cc 2024. 241016004819: Environmental Impact Assessment for rezoning Erf 445 Extension 1, Oranjemund, Karas Region from "single residential" to "general business".
Environmental Impact Assessment for Rezoning of Erf 445 Extension 1, Oranjemund, from Single Residential to General Business and operate a teleshop.
Tuesday, 31 December 2024
Excel Dynamic Solutions 2024. 240326003119: Environmental Scoping Assessment (ESA) for the proposed prospecting and exploration activities on Exclusive Prospecting Licence (EPL) No. 9135 located between Outjo in Kunene Region and Otjiwarongo in Otjozodjupa, Namibia.
Proposed Prospecting and Exploration Activities of Base and Rare Metals, Dimension Stone, Industrial Minerals, Nuclear Fuel Minerals and Precious Metals on Exclusive Prospecting Licence (EPL) No. 9135 located between Outjo in Kunene Region and Otjiwarongo in Otjozodjupa, Namibia.
Monday, 30 December 2024
Stewart Planning 2024. 241206005054: Rezoning: General Residential to General Business for Erf 517 Walvis Bay, Erongo Region.

Change of land use from residential to business. In the immediate short term, the owners intend to convert the existing flat building into offices with the required on-site parking. In the long term, the existing buildings will be demolished and a three-storey building could be developed with each floor potentially comprising the following land uses: Ground Floor: Offices and/or Retail/Shops; First Floor: Offices/Apartments; Third Floor: Apartments No site development plan has been prepared to date.

Monday, 30 December 2024
2024. 241209005059: Renewal application: Walvis Bay Salt Holdings (Pty) Ltd's salt mining and processing on ML 37 in Walvis Bay, Erongo Region.

Renewal application: Renewal of Environmental Clearance Certificate (ECC) for the ongoing operations of the salt works and associated activities. WBSH currently produce approximately 1 million metric tonnes of high quality NaCl from seawater per annum that is distributed to various clients locally and exported to other markets. The total project site, including evaporation ponds, covers an area of ~ 5 000 ha. Salt is transported by truck from the plant to the harbour in Walvis Bay.

Monday, 30 December 2024
I.N.K Enviro Consultants 2024. 241201005035: The upgrading and decongestion of Winnie Mandela Road, from Peter Nanyemba Road Junction to C28 Road (Daan Viljoen) Junction, Khomas Region, Namibia.

Namibia Bulk Infrastructure and Grid Solutions, intends on having an Environmental Management Plan (EMP) in place, prior to the commencement of the construction and upgrading of Winnie Mandela Road, located in Windhoek, Namibia. The project area extends from the intersection of Monte Christo Road and Winnie Mandela Road, up to the intersection of C28 (Daan Viljoen Road) and Winnie Mandela Road, covering 6.2 km. The anticipated timeframe for the construction and upgrading activities is 18 - 20 months.

Monday, 30 December 2024
Excel Dynamic Solutions 2024. 241128005025: Environmental Scoping Assessment (ESA) for the proposed prospecting and exploration activities on Exclusive Prospecting Licence (EPL) No. 9710 of base and rare metals, dimension stone, industrial minerals, nuclear fuels, and precious metals located north-west of Uis in the Erongo Region, Namibia.
For the Proposed Prospecting and Exploration Activities on Exclusive Prospecting Licence (EPL) No. 9710 Of Base and Rare Metals, Dimension Stone, Industrial Minerals, Nuclear Fuels, and Precious Metals Located North-West of Uis In the Erongo Region, Namibia.
Monday, 30 December 2024
Excel Dynamic Solutions 2024. 241128005020: Environmental Clearance Certificate (ECC) renewal on the proposed small scale dimension stone quarry in two Mining Claims (70753 and 70661), located in Karibib District, Erongo Region.
Renewal on the proposed small scale dimension stone quarry in two Mining Claims (70753 and 70661), located in Karibib District, Erongo Region.
Monday, 30 December 2024
Excel Dynamic Solutions 2024. 241128005019: Environmental Clearance Certificate (ECC) renewal on proposed small scale surface for marble on Mining Claim Numbers 68366, 68367,68368,68369,68370 and 68371- Karibib District, Erongo Region, Namibia.
Renewal on proposed small scale surface for marble on Mining Claim Numbers 68366, 68367,68368,68369,68370 and 68371- Karibib District, Erongo Region, Namibia.
Monday, 30 December 2024
Green Earth Environmental Consultants 2024. 241114004965: Township establishment procedures for the proclamation of Schlip, Hardap Region, as a town.
LAND USE AND DEVELOPMENT ACTIVITIES 5.2 Establishment of land resettlement schemes INFRASTRUCTURE 10.2 The route determination of roads and design of associated physical infrastructure where - a) It is a public road b) The road reserve is more than 30m wide, or c) The road caters for more than one lane of traffic in both directions.
Monday, 30 December 2024
Enviro Management Consultants Namibia 2024. 240905004656: The rehabilitation of several streets in Walvis Bay Municipal Area - Erongo Region.
Regulation 10.1 and 10.2 - Construction of public roads.
Monday, 30 December 2024
Green Earth Environmental Consultants 2024. 240701004092: Construct and operate a Green Energy Complex (including a 300,000 bpsd oil refinery, 500mw renewable energy power plant and related storage tank farms) on Portion 46 of the Remainder of Farm 58 Walvis Bay, Erongo Region.
ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES The construction of facilities for: (a) the generation of electricity. (b) the transmission and supply of electricity. (c) refining of gas, oil and petroleum products.
Friday, 20 December 2024
Gecko Exploration and Geokey Consult 2024. 241119004983: Renewal of the Environmental Clearance Certificate (ECC) for mining activities of blue sodalite and other minerals on Mining License 40, located near Otjimuhaka in the Epupa Constituency, Kunene Region.
Mining of Sodalite, Dimension Stone, and Other Minerals on Mining License 40 Located Near Otjimuhaka in the Epupa Constituency, Kunene Region.
Friday, 20 December 2024
Savannah Environmental Consulting Services 2024. 241119004979: Application for ECC for the operations and maintenance of a gas depot and associated infrastructures at Transnamib Holdings Ltd Windhoek Container Terminal (Wincon) located in the Northern Industrial area, Khomas Region, Windhoek, Namibia.

The ECC is for the operation and Maintenace of Hakahana Lacho Power Gas CC that will lease land from Tran-Namib Holdings Ltd at Windhoek Container Terminal point to operate a storage and distribution gas facility (Depot) i.e., receiving Iso Tank from the port of Walvisbay via a train, to the Depot in Northern industrial area (proposed site) and from there they will be loaded into trucks for distribution to the sales points around the country, and The Southern African Development Community (SADC) countries.

Friday, 20 December 2024
Geo Pollution Technologies 2024. 241119004977: Operations of the Super Sand Consumer Fuel Installation, Mariental, Hardap Region.
ECC is for the Operations of the Super Sand Consumer Fuel Installation, Mariental, Hardap Region.
Friday, 20 December 2024
Enviro-Leap Consulting 2024. 241118004974: Environmental Clearance Certificate for the proposed mineral exploration and small-scale mining activities on Mining Claims (MCs) 75393, 75394, 75395, 75396, 75397, 75398 & 75399 in respect to Dimension Stone, Industrial Mineral and Semi-Precious Stones, South-west of Karibib.

Mr. Michael I. T. Petrus (herein referred to as the proponent), is a Namibian citizen with vested interest in mineral exploration and mining development. Mr. Petrus aims at prospecting and eventually developing mining ventures in respect to Base and Rare Metals and Semi-Precious Stones. Mr. Petrus seeks to undertake her mineral exploration and mining development on Mining Claims (MCs 75181 - 75188) South-west of Karibib in the Karibib Rural Constituency on / within Farm Utusis No. 75.

Friday, 20 December 2024
Geo Pollution Technologies 2024. 241119004976: Operations of the Super Sand Consumer Fuel Installation, Keetmanshoop, //Kharas Region.
ECC is for the Operations of the Super Sand Consumer Fuel Installation, Keetmanshoop, //Kharas Region.
Friday, 20 December 2024
Stubenrauch Planning Consultants 2024. 241104004899: Environmental Impact Assessment for the proposed rezoning of Erf 1187, Rundu Extension 3 from "Residential" to "Office", Kavango East Region.
Activity 5.1 (a) Land use and development activities- the rezoning of land from residential use to industrial or commercial use.
Friday, 20 December 2024
Geo Pollution Technologies 2024. 241101004889: Exploration activities on Exclusive Prospecting License (EPL) Area 8048 in the Khomas Region.
ECC is for Votorantim Metals Namibia's prospecting activities in EPL 8048 in the Khomas Region. The EPL is for base and rare metals, industrial minerals and precious metals.
Friday, 20 December 2024
Impala Environmental Consulting 2024. 240910004675: Environmental Impact Assessment for manganese mining on Mining Licence 241, Otjozondjupa Region.

The applicant intends to mine manganese on the mining license. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mineral exploration and mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).

Friday, 20 December 2024
I.N.K Enviro Consultants 2024. 240813004545: The subdivision of the remainder Farm Oniipa Town and Townlands No. 1164 into portion A and Remainder, for the Establishment of Kauluma Park Township.

KK Construction cc intends to apply for an Environmental Clearance Certificate (ECC) for the Remainder Farm Oniipa Town and Townlands No. 1164 into portion A and Remainder, for the Establishment of a Township. The Oniipa Town Council is a relatively new Local Authority and is receiving a keen interest from investors with the present demand for land delivery for housing and commercial development purposes.

Friday, 20 December 2024
Impala Environmental Consulting 2024. 240813004544: Environmental Impact Assessment for dimension stone mining on Mining Licence 260, //Karas Region.

The applicant intends to mine dimension stones blocks on the mining license. The applicant intends to quarry dimension stone blocks for building purposes. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mineral exploration and mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).

Friday, 20 December 2024
Impala Environmental Consulting 2024. 240813004543: Environmental Impact Assessment for dimension stone mining on Mining Licence 259, //Karas Region.

The applicant intends to mine dimension stones blocks on the mining license. The applicant intends to quarry dimension stone blocks for building purposes. The Environmental Regulations procedure (GN 30 of 2012) stipulates that no mineral exploration and mining activities may be undertaken without an environmental clearance certificate. The proposed prospecting activities are listed in the Environmental Management Act, 2007, (Act No. 7 of 2007) and the EIA Regulations 30 of 2012 and cannot be undertaken without an Environmental Clearance Certificate (ECC).

Friday, 20 December 2024
Laveka Built Environment Services 2024. 240620004008: Environmental Impact Assessment (EIA) of the proposed subdivision of the Oniipa Town and Townlands No 1164 inot Portion A and the Remainder for the Township Establishment, Oniipa, Oshikoto Region.
The application is for Environmental Impact Assessment (EIA) for the proposed subdivision of the Oniipa Town and Townlands No. 1164 into Portion A and the Remainder for Township Establishment.
Thursday, 19 December 2024
LM Environmental Consulting 2024. 241204005047: Renewal of ECC for the EMP for the !Aimab Superfarm, Mariental, Hardap Region.
Renewal of the Environmental Clearance Certificate for the Environmental Management Plan for the !Aimab Superfarm, Mariental, Hardap Region, Namibia.
Thursday, 19 December 2024
NamPower 2024. 241202005044: The application for the renewal of the Environmental Clearance Certificate for the operation, maintenance and upgrade of an existing Gerus - Gerus earth electrode line, station and other associated infrastructures in Otjozondjupa Region.

The Environmental Clearance Certificate for the operation, maintenance and upgrade of an existing Gerus - Gerus earth electrode line, station and other associated infrastructures in Otjozondjupa Region. The purpose of the earth electrode line and stations is to provide a current path when the 350 HVDC line is operated on earth mode. The 350 HVDC line may be operated under certain conditions in "earth return" mode. The 350 HVDC line may be operated under certain conditions in "earth return" return due to significant savings in power losses.

Wednesday, 18 December 2024
EVIMA Consulting Engineers and Project Managers 2024. 241116004973: Environmental Impact Assessment (EIA) and development of the Environmental Management Plan (EMP) for the Subdivision and Establishment of two townships on Portions A and B on Farm Divundu Townlands No: 1362.

The proponent (Divundu Village Council) is of the intention to expand the existing village by establishing two (2) new extensions in the Village of Divundu (Portion A and B). The layouts of the proposed two extensions will make provision for a wide variety of land uses. The establishment of the new extensions will ease the shortage of housing in the village of Divundu and make more serviced land available. In order to finalize the planning actions and as part of the application, an Environmental Clearance Certificate should be obtained.

Wednesday, 18 December 2024
NamPower 2024. 241111004931: The application for the Environmental Clearance Certificate for the operation and maintenance of the existing 330kV Ruacana - Kunene - Omburu transmission line and other associated infrastructures.

The ECC is for the operation and maintenance of the existing 330kV Ruacana - Kunene - Omburu transmission line and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. The 330kV Ruacana - Kunene - Omburu transmission line, was constructed before the promulgation of the Environmental Management Act (Act 7 of 2007) and its regulations, thus it did not obtain an ECC.

Wednesday, 18 December 2024
NamPower 2024. 241111004930: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 220kV Rössing– Lithops transmission line including Rössing substation and other associated infrastructures.

The ECC is for the operation and maintenance of an existing 220kV Rössing– Lithops transmission line including Rössing substation and other associated infrastructures Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for 220kV Rössing– Lithops in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Wednesday, 18 December 2024
NamPower 2024. 241108004927: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 132kv Trekkopje - Wlotzka Transmission line including Wlotzka, Dolerite, Lichen Substations and other associated Infrastructure.

The ECC is for the operation and maintenance of an existing 132kv Trekkopje - Wlotzka Transmission line including Wlotzka, Dolerite, Lichen Substations And other associated Infrastructure. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity.

Wednesday, 18 December 2024
NamPower 2024. 241108004925: The application for the Environmental Clearance Certificate for the operation and maintenance of existing 132kv Lithops - Husab 1 and 2 transmission lines and other associated infrastructures.

The ECC is for the operation and maintenance of existing 132kv Lithops - Husab 1 and 2 transmission lines and other associated infrastructures. The construction of the 132kV Lithops - Husab 1 and 2 transmission lines was part of the ECC issued to Husab Mine. However, the powerline belongs to NamPower and would therefore like to apply for the ECC for the operation and maintenance of an existing 132kv Lithops - Husab 1 and 2 transmission lines in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Wednesday, 18 December 2024
Ekwao Consulting 2024. 241022004862: Application for renewal an ECC for recreation facility comprising of a camp site and restaurant amenities located in Eros Park, Windhoek, Khomas Region.
The application is a renewal for an ECC (ECC-01858) which was granted to Open Range Market cc for the operation of its recreational facility in Eros Park, Windhoek. The ECC is due to expire on 24 december 2024.
Wednesday, 18 December 2024
Excel Dynamic Solutions 2024. 240829004619: Environmental Scoping Assessment (ESA) for the Exclusive Prospecting License (EPL) No. 8244 located around Tsumeb, in Oshikoto Region, Namibia.
For the Exclusive Prospecting License (EPL) No. 8244 located around Tsumeb, in Oshikoto Region, Namibia.
Tuesday, 17 December 2024
Excel Dynamic Solutions 2024. 241126005008: Environmental Clearance Certificate (ECC) renewal for the proposed exploration activities on Exclusive Prospective License (EPL) 4817 and 4833 located in Erongo Region, Namibia.
Renewal for the proposed exploration activities on Exclusive Prospective License (EPL) 4817 and 4833 located in Erongo Region, Namibia.
Tuesday, 17 December 2024
Nam Geo-Enviro Solutions (NGS) 2024. 241122004998: Operations of the existing Solar Photovoltaic (PV) facility and associated infrastructures at Rosh Pinah, Karas Region.
For the renewal of the Environmental Clearance Certificate (ECC) for the operations of the existing Solar Photovoltaic (PV) facility and associated infrastructures at Rosh Pinah, Karas Region.
Tuesday, 17 December 2024
NamPower 2024. 241112004944: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 220kv Khan - Rössing transmission line.

The ECC is for the operation and maintenance of an existing 220kv Khan – Rossing transmission line. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. The 220kV Khan - Rossing was constructed before the promulgation of the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241112004943: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 66kV Van Eck - Osona transmission line including Osona T-off - Von Bach base and other associated infrastructures.

The ECC is for the operation and maintenance of an existing 66kV Van Eck – Osona transmission line including Osona T-off - Von Bach base and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue ECC for 66kV Van Eck– Osona in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241112004942: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 132kV Schlangkopf T-off - Schlangkopf transmission line including Schlangkopf substation and other associated infrastructures.

The ECC is for the operation and maintenance of an existing 132kV Schlangkopf T-off - Schlangkopf transmission line including Schlangkopf substation and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity.

Tuesday, 17 December 2024
NamPower 2024. 241112004941: The application for the Environmental Clearance Certificate for the operation and maintenance of the existing 132kV Omatando - Okatope transmission line.

The ECC is for the operation and maintenance of the existing 132kV Omatando - Okatope transmission line. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. This transmission line was constructed before the promulgation of the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241112004940: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 66kV Okapya - Efundja transmission line including Okapya and Efundja substations and other associated infrastructures.

The ECC is for the operation and maintenance of an existing 66kV Okapya – Efundja transmission line including Okapya and Efundja substations and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. The 66kV Okapya – Efundja transmission line was constructed was constructed before the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241112004939: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 66kV Omatando - Oshakati 1 transmission line.

The ECC is for the operation and maintenance of an existing 66kV Omatando - Oshakati 1 transmission line. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. This transmission line was constructed before the promulgation of the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241112004938: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 66kV Bismarck - Naruchas transmission line including Groot Aub - Oamites T-off line and other associated infrastructures.

The ECC is for the operation and maintenance of an existing 66kV Bismarck – Naruchas transmission line including Groot Aub - Oamites T-off line and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. The 66kV Bismarck – Naruchas, was constructed before the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241112004937: The application for the Environmental Clearance Certificate for the operation and maintenance of the 66kV Hardap - Stampriet transmission line including Stampriet substation and other associated infrastructures.

The ECC operation and maintenance of the 66kV Hardap – Stampriet transmission line including Stampriet substation and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. The 66kV Hardap - Stampriet, was constructed before the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241112004936: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 400kv Kokerboom - Obib transmission line.

The ECC is for the operation and maintenance of an existing 400kv Kokerboom - Obib transmission line. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the ECC for 400kV Kokerboom – Obib transmission line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241111004935: The application for the Environmental Clearance Certificate for the operation and maintenance of an existing 132kv Lithops - Walmund transmission lines.

The ECC is for the operation and maintenance of an existing 132kv Lithops – Walmund transmission lines. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. NamPower would therefore like to apply for the issue of the ECC for 220kV Lithops - Walmund in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 17 December 2024
NamPower 2024. 241111004934: The application for the Environmnetal Clearance Certificate for the operation and maintenance of an existing 220kV Khan - Trekkopje transmission line including Trekkopje Substation and other associated infrastructures.

The ECC is for the operation and maintenance of an existing 220kV Khan – Trekkopje transmission line including Trekkopje Substation and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity.

Tuesday, 17 December 2024
NamPower 2024. 241111004933: The application for the Environmental Clearance Certificate or the operation and maintenance of existing 220kV Harib - Aggeneis 1 and 2 transmission lines.

The ECC is for the operation and maintenance of existing 220kV Harib - Aggeneis 1 and 2 transmission lines. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. The 220kV Harib - Aggeneis 1 and 2 transmission lines were constructed before the Environmental Management Act (Act 7 of 2007) and its regulations.