These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: o Activity 10.1 (g) Infrastructure. Communication networks including towers, telecommunication and marine telecommunication lines and cables. Activity 10.1 (j) Infrastructure. Masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission. 2.
Renewal of ECC 3078 Bannerman Mining Resources Namibia would like to apply for a renewal of the Environmental Clearance Certificate (ECC - 3078) for the Proposed 132 kV Overhead Transmission Line and Substation with Metering Station in accordance with the Environmental Management Regulations.
The renewal of the expired Environmental Clearance Certificate (ECC No. 00203). The establishment of new townships, including the construction of roads and supporting infrastructure. Compliance with Namibia’s Environmental Management Act and associated regulations The ECC for the township establishment covers the following key activities under the Environmental Management Act: Public Roads and Road Alignment (Section 10.2). Route Determination & Road Design (Section 10.1(b)). Construction of Canals and Channels (Section 8.4).
The Renewal of the Environmental Clearance Certificate is for: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power); Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power); Activity 5.1(c) - Land Use and Development Activities Agricultural use to industrial use 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1.
The Renewal of the Environmental Clearance Certificate is for: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power); Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power); Activity 5.1(c) - Land Use and Development Activities Agricultural use to industrial use 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1.
1.
Attachment | Size |
---|---|
4777_EMP_Divava Okavango Lodge and Spa.pdf | 5.97 MB |
4777_Map_Divava Okavango Lodge and Spa.pdf | 432.26 KB |
4777_Screening Notice_Divava Okavango Lodge and Spa.pdf | 168.97 KB |
4777_CV_Divava Okavango Lodge and Spa.pdf | 137.72 KB |
1.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: o Activity 1(a) – Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power) o Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power) o Activity 5.1(c) – Land Use and Development Activities Agricultural use to industrial use 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity. Activity 2.3 - Waste Management, Treatment, Handling and Disposal Activities Temporary storage of waste. Activity 4 - Forestry Activities Removal of protected species Activity 5.2 – Land Use and Development Activities Establishment of Land Resettlement Scheme. Activity 8.9 - Water Resource Developments Construction and other activities within a catchment area.
The Environmental Clearance Certificate is for: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (Wind Power) 2.1. TITLE OF ACTIVITY Hoodia Pilot Wind Measuring Tower 2.2. LOCATION OF ACTIVITY The proposed Hoodia Pilot Wind Measuring Tower will be located at Farm Schönau No. 126, which is located in the southern parts of Namibia, in the //Karas Region, approximately 60 km south-west of //Karasburg Town and 50 km north of the Orange River.
1.
1.
1.
Attachment | Size |
---|---|
2062_SR_Opuwo Aerodrome.pdf | 2.68 MB |
2062_EMP_Opuwo Aerodrome.pdf | 789.12 KB |
2062_Support Letter_Opuwo Aerodrome.pdf | 235.19 KB |
2062_Proof of Consultation_Opuwo Aerodrome.pdf | 1.49 MB |
2062_Map_Opuwo Aerodrome.pdf | 170.24 KB |
2062_Screening Notice_Opuwo Aerodrome.pdf | 74.83 KB |
2062_CV_Opuwo Aerodrome.pdf | 53.91 KB |
2062_BID_Opuwo Aerodrome.pdf | 323.43 KB |
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: Activity 10.1(b) - Infrastructure The construction of public roads 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 TITLE OF ACTIVITY: Subdivision of Erven 2167, 2168 and 2169, Extension 6, Henties Bay 2.2 NATURE OF ACTIVITY: The activity entails the construction of public roads. 2.3 LOCATION OF ACTIVITY: Erven 2167, 2168 and 216 is in Extension 6 (south dune), Henties Bay which is located within the Erongo Region.
Attachment | Size |
---|---|
2776_EMP_ML 142_Karibib District.pdf | 2.06 MB |
2776_Environmental Audit_ML 142_Karibib District.pdf | 591.7 KB |
2776_ECC Old_ML 142_Karibib District.pdf | 390.12 KB |
2776_Map_ML 142_Karibib District.pdf | 162.79 KB |
2776_Screening Notice_ML 142_Karibib District.pdf | 74.35 KB |
2776_CV_ML 142_Karibib District.pdf | 60.4 KB |
THE RENEWAL OF THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: The construction of public roads and quarrying for the purpose of base material, as well as potential removal of trees, which requires a permit as per the Forest Act, 2001 (Act No. 12 of 2001) or any other law. The ‘listed activities’ that might be affected are listed below: FORESTRY ACTIVITIES 4. The clearance of forest areas, deforestation, afforestation, timber harvesting or any other related activity that requires authorization in terms of the Forest Act, 2001 (Act No. 12 of 2001) or any other law.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: 1. (b) The transmission and supply of electricity. 4. Any other related activity that requires authorization in terms of the forest Act (Act No. 12 of 2001) or any other law. 5.2 The establishment of land resettlement schemes. 10.1 (b) The construction of public roads. 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 Title of the Activity Township Establishment: Amraalsduin Extensions 1& 2.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: The 'listed activities' that might be included as part of this development are listed below: o Activity 1 - Energy Generation, Transmission and Storage Activities (b) The construction of facilities for the transmission and supply of electricity o Activity 4 – Forestry Activities The clearance of forest areas, deforestation, afforestation, timber harvesting or any other related activity that requires authorization in terms of the Forest Act, 2001 (Act No. 12 of 2001) or any other law. 2.
A 10m right-of-way servitude over the Remainder of Farm Divundu Townlands No. 1362.
1. The Renewal of the Environmental Clearance Certificate is for: Continuation of the Solar Power Plant operation project on ML 142, for which an Environmental Clearance was obtained during October 2020 , which requires authorization in terms of the Environmental Management Act, 2007 (Act 7 of 2007) i.e. Energy Generation, Transmission and Storage activities. 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1. Title of Activity Continuation of the Solar Power Plant operation project on ML 142. 2.2.
The Environmental Clearance Certificate renewal is for: Continuation of an existing mining activity, for which an Environmental Clearance was obtained during November 2020, which requires authorization in terms of the Minerals (Prospecting and Mining) Act (No. 33 of 1992). 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 Title of the Activity Continuation of the mining (quarrying) for mineral dimension stone (i.e. granite).
Attachment | Size |
---|---|
2081_EMP_MC 67826_28_31 Damara Granite.pdf | 1.19 MB |
2081_ECC Old_MC 67826_28_31 Damara Granite.pdf | 396.75 KB |
2081_Map_MC 67826_28_31 Damara Granite.pdf | 151.99 KB |
2081_Screening Notice_MC 67826_28_31 Damara Granite.pdf | 73.25 KB |
The closure, realignment and construction of a public road and the closure and realignment of a public open space.
Renewal of Environmental Clearance Certificate for the township establishment on Erf 1373 (currently known as Oneshila informal settlement), Oshakati Townlands, Oshana Region.
Construction of infrastructure and development within floodlines through township establishment on Portion A of the Remainder of Farm Okahao Extension No.1213 (to be known as Kashenda Extension 3) in the Omusati Region.
Infrastructure development through township establishments.
The Environmental Clearance Certificate renewal is for: Continuation of an existing mining activity, for which the initial Environmental Clearance was obtained during July 2014, which requires authorization in terms of the Minerals (Prospecting and Mining) Act (No. 33 of 1992). 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 Title of the Activity Continuation of the mining (quarrying) for mineral dimension stone (i.e. granite) at ML126.
Attachment | Size |
---|---|
963_Environmnetal Questionaire_ML126 Walvis District.pdf | 1.99 MB |
963_Proforma EC_ML126 Walvis District.pdf | 626.71 KB |
THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: The continuation of the Land Use and Development Activities, for which an Environmental Clearance Certificate was obtained during August 2013. 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 Title of the Activity Continuation of the Land Use and Development Activities (Formalization of the DRC informal settlement and Township Establishment on Erf 184 and Mile 4 Proper as well as Portion 90 of the Remainder of Portion B of Swakopmund Town and Townlands), Swakopmund, Erongo Region.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: Continuation of an existing mining activity, for which the initial Environmental Clearance was obtained during July 2014, which requires authorization in terms of the Minerals (Prospecting and Mining) Act (No. 33 of 1992). 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 Title of the Activity Continuation of the mining (quarrying) for mineral dimension stone (i.e. granite) at ML38 and 104.
The Renewed and valid Environmental Clearance Certificate (ECC-02025) is for: The 'listed activities' that might be affected are listed below: Waste Management, Treatment, Handling and Disposal Activities Activity 2.2 - Activity entailing a scheduled process in the Atmospheric Pollution Prevention ordinance, 1976. Mining and Quarrying Activities Activity 3.2 - Other forms of mining or extracting or extraction of any natural resources whether regulated by law or not. Activity 3.3 - Resource extraction, manipulation, conservation and related activities.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: Activity 8.1 - Water Resource Developments The abstraction of ground or surface water for industrial or commercial purposes; Activity 8.2 - Water Resource Developments The abstraction of groundwater at a volume exceeding the threshold authorized in terms of a law relating to water resources; and o Activity 8.7 – Water Resources Developments Irrigation schemes for agriculture excluding domestic irrigation. TITLE OF ACTIVITY Increased groundwater abstraction at Remainder of Farm Sponholz No. 140.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power); Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power) o Activity 5.1(c) – Land Use and Development Activities Agricultural use to industrial use 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1. TITLE OF ACTIVITY Rosh Pinah Solar Park 2.2.
The environmental clearance certificate is for: Activity 8.9 Water resource developments: Construction and other activities within a catchment area. o Activity 10.1 (a) (Infrastructure) The construction the construction of - Oil, water, gas and petrochemical and other bulk supply pipelines. o Activity 10.1 (b) (Infrastructure) The construction of - Public roads.
The Application if for the name change from the current holder of Environmental Clearance Certificate (GreeNam Electricity (PTY) Ltd. to NamPower. Reason for Amendment(s): NAMPOWER ASSUMED RESPONSIBILITY OF THE 66kV OVERHEAD POWER TRANSMISSION LINE WHICH DISTRIBUTES ELECTRICITY TO THE NAMPOWER HARDAP SUBSTATION FROM THE HARDAP PHOTOVOLTAIC SOLAR PROJECT.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: o Activity 3(2) – Mining and Quarrying Activities Other forms of mining or extraction of any natural resource whether regulated by law or not (i.e. borrow pits &quarries) o Activity 4 – Forestry Activities Any other related activity that requires authorization in terms of the Forest Act, 2001 (i.e. removal and relocation of protected species) o Activity 8(1) – Water Resource Developments The abstraction of groundwater for industrial or commercial purpose (i.e.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power). Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (Overhead Transmission Lines). Activity 5.1(c) - Land Use and Development Activities Agricultural use to industrial like use 2.1. TITLE OF ACTIVITY Klein Spitskop Solar Energy Park 2.2.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: The ‘listed activities’ that might be included as part of this development are listed below: Land Use and Development Activities o Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity o Activity 2.3 - Waste Management, Treatment, Handling and Disposal Activities Temporary storage and export of waste o Activity 4 - Forestry Activities Removal of protected species o Activity 8.9 - Water Resource Developments Construction and other activities within a
Renewal of the Environmental Clearance Certificate (ECC)and transfer of the ECC to Corridor Logistic (Pty) Ltd. Unifood Charcoal.
Amendment of the title of the certificate already issued for the Amendment of erven in Okalongo Proper, Extensions 1 and 2 Okalongo through the closure of public open spaces and public streets within the Omusati Region.
Attachment | Size |
---|---|
403_EMP_Okalongo Proper_Omusati Region.pdf | 832.75 KB |
403_ECC Old_Okalongo Proper_Omusati Region.pdf | 256.09 KB |
403_Map_Okalongo Proper_Omusati Region.pdf | 309.77 KB |
403_Screening Notice_Okalongo Proper_Omusati Region.pdf | 123.8 KB |
For the construction of public roads, infrastructure and activities in watercourses within flood lines through township establishments.
Urban Green cc (The Environmental Assessment Practitioner) has been appointed by GreeNam Electricity (PTY) Ltd (The Proponent) to apply for the transfer of an Environmental Clearance Certificate for the existing 66kV Power Transmission Line situated within the Mariental District, Hardap Region. The 66kV Power Transmission Line distributes electricity to the NamPower Hardap substation from the Hardap photovoltaic solar project.