These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow exploration work on the Exclusive Prospecting License (EPL) No. 9610. The primary interest will be to seek for base, rare, precious metals and industrial minerals, mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, and etc.
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow exploration work on the Exclusive Prospecting License (EPL) No. 9250. The primary interest will be to seek for base, rare, precious metals, industrial minerals and dimension stone mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
| Attachment | Size | 
|---|---|
| 4448_ESA_EPL No 9250_Karas Region.pdf | 7.03 MB | 
| 4448_EMP_EPL No 9250_Karas Region.pdf | 603.92 KB | 
| 4448_Minutes_EPL No 9250_Karas Region.pdf | 2.56 MB | 
| 4448_Proof of Consultation_EPL No 9250_Karas Region.pdf | 2.56 MB | 
| 4448_Map_EPL No 9250_Karas Region.pdf | 1.25 MB | 
| 4448_NHC Consent_EPL No 9250_Karas Region.pdf | 1009.64 KB | 
| 4448_Screening Notice_EPL No 9250_Karas Region.pdf | 1.37 MB | 
The Proponent is interested in conducting exploration activities on EPL 9490 for Base and Rare Metals, Dimension Stone, Industrial Minerals, and Precious Metals.
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow exploration work on the Exclusive Prospecting License (EPL) No. 9036. The primary interest will be to seek for base, rare, precious metals, industrial minerals and dimension stone mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow the applicant to conduct exploration work on the Exploration Prospecting License No. 7469. The primary interest will be to seek for industrial minerals and nuclear fuel mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
| Attachment | Size | 
|---|---|
| 32_ESAR_EPL 7469_Uis.pdf | 5.87 MB | 
| 32_EMP_EPL 7469_Uis.pdf | 416.02 KB | 
| 32_Consent Letter_EPL 7469_Uis.pdf | 542.7 KB | 
| 32_Proof of Consultation_EPL 7469_Uis.pdf | 2.86 MB | 
| 32_Map_EPL 7469_Uis.pdf | 151.65 KB | 
| 32_Screening Notice_EPL 7469_Uis.pdf | 135.09 KB | 
| 32_CV_EPL 7469_Uis.pdf | 87.15 KB | 
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow exploration work on the Exclusive Prospecting License (EPL) No. 8816. The primary interest will be to seek for dimension stone, industrial minerals, precious metals, base and Rare Earth Elements mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
| Attachment | Size | 
|---|---|
| 1750_ESAR_EPL No 8816 Outjo District.pdf | 2.77 MB | 
| 1750_EMP_EPL No 8816 Outjo District.pdf | 318.29 KB | 
| 1750_Consent Letter_EPL No 8816 Outjo District.pdf | 664.17 KB | 
| 1750_Proof of Consultation_EPL No 8816 Outjo District.pdf | 1.65 MB | 
| 1750_Map_EPL No 8816 Outjo District.pdf | 130.94 KB | 
| 1750_Screening Notice_EPL No 8816 Outjo District.pdf | 82.56 KB | 
| 1750_CV_EPL No 8816 Outjo District.pdf | 57.32 KB | 
| 1750_BID_EPL No 8816 Outjo District.pdf | 486.98 KB | 
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow exploration work on the Exclusive Prospecting License (EPL) No. 8228. The primary interest will be to seek for industrial minerals and precious metals mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
| Attachment | Size | 
|---|---|
| 2315_SR_EPL No 8228 Karas Region.pdf | 4.42 MB | 
| 2315_EMP_EPL No 8228 Karas Region.pdf | 1019.02 KB | 
| 2315_EC Letter_EPL No 8228 Karas Region.pdf | 80.29 KB | 
| 2315_Heritage Impact Assessment_EPL No 8228 Karas Region.pdf | 1.45 MB | 
| 2315_Proof of Consultation_EPL No 8228 Karas Region.pdf | 574.93 KB | 
| 2315_Map_EPL No 8228 Karas Region.pdf | 398.88 KB | 
| 2315_Screening Notice_EPL No 8228 Karas Region.pdf | 42.2 KB | 
| 2315_CV_EPL No 8228 Karas Region.pdf | 57.32 KB | 
| 2315_BID_EPL No 8228 Karas Region.pdf | 561.97 KB | 
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow exploration work on the Exclusive Prospecting License (EPL) No. 6776. The primary interest will be to seek for dimension stone and nuclear fuel mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
Construction of an eco-friendly low impact tourism and leisure facility on a 15ha plot in Ozondati Village, Ohungu Conservancy (Erongo Region).
| Attachment | Size | 
|---|---|
| 2760_EIA_Quagga Camp and Leisure.pdf | 2 MB | 
| 2760_EMP_Quagga Camp and Leisure.pdf | 295.61 KB | 
| 2760_Support Letter_Quagga Camp and Leisure.pdf | 322.02 KB | 
| 2760_Proof of Consultation_Quagga Camp and Leisure.pdf | 6.3 MB | 
| 2760_Map_Quagga Camp and Leisure.pdf | 1.32 MB | 
| 2760_Screening Notice_Quagga Camp and Leisure.pdf | 45.55 KB | 
| 2760_CV_Quagga Camp and Leisure.pdf | 160.05 KB | 
| 2760_BID_Quagga Camp and Leisure.pdf | 488.53 KB | 
For the upgrading of an earth track already proclaimed as DR3417, from Andara Village to Shamaturu Village's clinic, via Mangamba Village. This is a 15km long road with a 30 meters wide road reserve, therefore total project footprint will be less than 50 hectares.
Renewal of the existing Environmental Clearance Certificate 2. Change of project name from Elephant Ridge Camp to Ondjamba Hills.
| Attachment | Size | 
|---|---|
| 2047_EMP_Ondjamba Hills Camp in Erongo Region.pdf | 212.7 KB | 
| 2047_ECC Old_Ondjamba Hills Camp in Erongo Region.pdf | 113.64 KB | 
| 2047_Map_Ondjamba Hills Camp in Erongo Region.pdf | 188.68 KB | 
| 2047_Screening Notice_Ondjamba Hills Camp in Erongo Region.pdf | 42.89 KB | 
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow the applicant to conduct exploration work on the Exploration Prospecting License No. 7498. The primary interest will be to seek for industrial minerals, precious metals, base and Rare Earth Elements mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
| Attachment | Size | 
|---|---|
| 44_ESA_EPL 7498 located in Uis District.pdf | 5.25 MB | 
| 44_EMP_EPL 7498 located in Uis District.pdf | 486.91 KB | 
| 44_Consent Letter_EPL 7498 located in Uis District.pdf | 168.91 KB | 
| 44_Proof of Consultation_EPL 7498 located in Uis District.pdf | 1.65 MB | 
| 44_Map_EPL 7498 located in Uis District.pdf | 226.88 KB | 
| 44_Screening Notice_EPL 7498 located in Uis District.pdf | 81.38 KB | 
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow the applicant to conduct exploration work on the Exploration Prospecting License No. 8100. The primary interest will be to seek for industrial minerals, dimension stone, precious metals, base and Rare Earth Elements mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No.
| Attachment | Size | 
|---|---|
| 36_ESAR_EPL 8100 located in Uis District.pdf | 4.04 MB | 
| 36_EMP_EPL 8100 located in Uis District.pdf | 620.04 KB | 
| 36_Consent Letter_EPL 8100 located in Uis District.pdf | 375.84 KB | 
| 36_Proof of Consultation_EPL 8100 located in Uis District.pdf | 1.45 MB | 
| 36_Map_EPL 8100 located in Uis District.pdf | 226.43 KB | 
| 36_Screening Notice_EPL 8100 located in Uis District.pdf | 81.83 KB | 
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow the applicant to conduct exploration work on the Exploration Prospecting License No. 7576. The primary interest will be to seek for industrial minerals, dimension stone, precious metals, base and rare metals mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No.
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow exploration work on the Exclusive Prospecting License (EPL) No. 8801. The primary interest will be to seek for Nuclear fuel, dimension stone, industrial minerals, precious metals, base and Rare Earth Elements mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No.
| Attachment | Size | 
|---|---|
| 1511_ESAR_EPL No 8801_Karibib District.pdf | 5.51 MB | 
| 1511_EMP_EPL No 8801_Karibib District.pdf | 1.01 MB | 
| 1511_Consent Request_EPL No 8801_Karibib District.pdf | 296.63 KB | 
| 1511_Proof of Consultation_EPL No 8801_Karibib District.pdf | 981.24 KB | 
| 1511_Map_EPL No 8801_Karibib District.pdf | 239.95 KB | 
| 1511_NHC Application_EPL No 8801_Karibib District.pdf | 205.05 KB | 
| 1511_Screening Notice_EPL No 8801_Karibib District.pdf | 159.08 KB | 
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow the applicant to conduct exploration work on the Exploration Prospecting License No. 7470. The primary interest will be to seek for industrial minerals, dimension stone, precious metals, base and Rare Earth Elements mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No.
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow the applicant to conduct exploration work on the Exploration Prospecting License No. 7498. The primary interest will be to seek for Nuclear fuel (applied for) industrial minerals, precious metals, base and Rare Earth Elements mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No.
| Attachment | Size | 
|---|---|
| 66_ESAR_EPL No 6933 Erongo Region.pdf | 9.94 MB | 
| 66_EMP_EPL No 6933 Erongo Region.pdf | 665.19 KB | 
| 66_Proof of Consultation_EPL No 6933 Erongo Region.pdf | 3.26 MB | 
| 66_Map_EPL No 6933 Erongo Region.pdf | 454.33 KB | 
| 66_NHC Consent_EPL No 6933 Erongo Region.pdf | 141.4 KB | 
| 66_Screening Notice_EPL No 6933 Erongo Region.pdf | 154.91 KB | 
Renewal: Construction of a eco-friendly tourism tented camp.
ECC renewal for the construction of an eco-friendly lodge.
| Attachment | Size | 
|---|---|
| 759_EMP_Damaraland Basalt Lodge in Kunene Region.pdf | 724.55 KB | 
| 759_Map_Damaraland Basalt Lodge in Kunene Region.pdf | 280.19 KB | 
| 759_Screening Notice_Damaraland Basalt Lodge in Kunene Region.pdf | 104.01 KB | 
To allow for the upgrading of the 28km DR3662 to gravel standards. The road is already proclaimed.
| Attachment | Size | 
|---|---|
| 720_ESIA_28km DR3662 to gravel standards.pdf | 1.85 MB | 
| 720_ESMP_28km DR3662 to gravel standards.pdf | 608.03 KB | 
| 720_Bidding Document_28km DR3662 to gravel standards.pdf | 1.37 MB | 
| 720_Proof of Consultation_28km DR3662 to gravel standards.pdf | 524.71 KB | 
| 720_Map_28km DR3662 to gravel standards.pdf | 392.71 KB | 
| 720_Screening Notice_28km DR3662 to gravel standards.pdf | 87.29 KB | 
Gravel road construction of DR3682 from Onaanda to Otamanzi (Omusati Region). This road is already a proclaimed road, since the 1990s.
Road upgrading from a gravel road to a tar road (bitumen standards) The proposed project is located in the Kavango East Region in Northern Namibia. It involves the upgrading to bitumen standard of the District Road 3403 stretching from Divundu via Bagani and ending at Mohembo Border Post in the Kavango East Region in Northern Namibia. The District Road 3403 starts at the junction with TR8/4 in Divundu and follows a south easterly direction for 8km to Bagani. From Bagani the road follows a southerly direction towards the Mohembo border post between Namibia and Botswana.
The proposed road construction is a continuation of the DR3427 that starts in Tondoro Village along the B10 highway near Nkurenkuru. The initiation first phase construction was completed in 2015 from Tondoro to Mburu-Uru. This proposed construction aimed at completing the DR3427 construction from where the first phase ended in 2015. Thus the second phase seeks to complete the DR3427 from Mburu-Uru to Calikawo/Charlie Cutline/DR3446.
| Attachment | Size | 
|---|---|
| 3188_EIASR_Construction to Gravel Standard DR3427.pdf | 1.45 MB | 
| 3188_EMP_Construction to Gravel Standard DR3427.pdf | 1.52 MB | 
| 3188_Map_Construction to Gravel Standard DR3427.pdf | 577.67 KB | 
Renewal of existing ECC obtained 10 April 2017 Construction of a 2.5 MW PV Plant in Okongo Village
ECC to be attached to the application for Leasehold.
| Attachment | Size | 
|---|---|
| 1318_EIA_Elephant Ridge Camp.pdf | 1.21 MB | 
| 1318_EMP_Elephant Ridge Camp.pdf | 197.86 KB | 
| 1318_Consent Letter_Elephant Ridge Camp.pdf | 25.02 KB | 
| 1318_Public Meeting Agenda_Elephant Ridge Camp.pdf | 1.96 MB | 
| 1318_Adverts_Elephant Ridge Camp.pdf | 3.31 MB |