These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
ECC renewal for the mining of semi-precious stones on Mining Claims No. 71032, 71033 and 71034 located about 75km northwest of Kamanjab in the Outjo District, Kunene Region. The three MCs cover a total surface area of 53.095 hectares (ha), with MC71032 covering 17.7378 ha, MC71033 covering 17.541 and 17.8162 ha covered by MC71034.
The Henning Crusher brick making factory in Ondangwa, Oshana Region.
The operational and maintenance activities for the existing 3 MW Solar PV Park within the townlands of Arandis in the Erongo Region.
The proposed construction and operation of a fuel service station and associated infrastructure in Okomapuku Village near Omatjete in the Erongo Region.
The Proposed prospecting and exploration activities on Exclusive Prospecting License (EPL) 7746 near Helmeringhausen, //Karas Region The EPL has potential for Base & Rare Metals, Industrial Minerals, Precious Metals and Precious Stones. However, the commodities of interest which the Proponent intends to prospect and explore for and as recommended in the Desktop Geological Report are Base & Rare Metals (Copper and Zinc) and Precious Metals (Gold). The proposed activities are expected to take between 6 and 24 months.
ECC Renewal: The Mining of Semi-Precious Stones on the Mining Claim No. 71032 – 71034 situated at Kamanjab, Outjo District in the Kunene Region.
Renewal of the expired Environmental Clearance Certificate (ECC): Operational and maintenance of the 22.80 MWac Trekkopje Solar Park (Photovoltaic Plant) in the Erongo Region.
Proposed construction and operation of a Wastewater Managment Facility (Four New Oxidation Ponds) in Tses Village, //Karas Region.