These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: o Activity 1(b) – Energy Generation, Transmission and Storage Activities The transmission and supply of electricity (i.e. powerlines) o Activity 8(5) - Water Resource Developments The construction of dams, reservoirs, levees and weirs o Activity 8(6) – Water Resource Developments The construction of domestic wastewater treatment plant and related pipelines o Activity 8(8) – Water Resource Developments Construction and other activities in water courses within flood lines (i.e.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: o Activity 10.1 (g) Infrastructure. Communication networks including towers, telecommunication and marine telecommunication lines and cables. Activity 10.1 (j) Infrastructure. Masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission. 2.
Renewal of ECC 3078 Bannerman Mining Resources Namibia would like to apply for a renewal of the Environmental Clearance Certificate (ECC - 3078) for the Proposed 132 kV Overhead Transmission Line and Substation with Metering Station in accordance with the Environmental Management Regulations.
The Renewal of the Environmental Clearance Certificate is for: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power); Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power); Activity 5.1(c) - Land Use and Development Activities Agricultural use to industrial use 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1.
The Renewal of the Environmental Clearance Certificate is for: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power); Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power); Activity 5.1(c) - Land Use and Development Activities Agricultural use to industrial use 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1.
1.
The activities in which Coastal Precast and Paving CC engage in at the project site is mining and quarrying activities, all of which are registered under their Non-Exclusive Prospecting License No: 6352. Coastal Precast and Paving CC's mining and quarrying activities are being conducted under the following Mining Claims: Old Mining Claims: 68799, 68800, and 68801. All Coastal Precast and Paving CC's mining claims are situated in close proximity to one another and are situated within the Municipal Boundaries of the town of Walvis Bay, in the Erongo Region.
| Attachment | Size | 
|---|---|
| 5004_EMP_Coastal Precast and Paving CC.pdf | 1.22 MB | 
| 5004_Declaration of Authorship_Coastal Precast and Paving CC.pdf | 198.06 KB | 
| 5004_ECC Old_Coastal Precast and Paving CC.pdf | 951.73 KB | 
| 5004_Map_Coastal Precast and Paving CC.pdf | 46.51 KB | 
| 5004_Screening Notice_Coastal Precast and Paving CC.pdf | 81.59 KB | 
| 5004_CV_Coastal Precast and Paving CC.pdf | 199.78 KB | 
1.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: o Activity 1(a) – Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power) o Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power) o Activity 5.1(c) – Land Use and Development Activities Agricultural use to industrial use 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity. Activity 2.3 - Waste Management, Treatment, Handling and Disposal Activities Temporary storage of waste. Activity 4 - Forestry Activities Removal of protected species Activity 5.2 – Land Use and Development Activities Establishment of Land Resettlement Scheme. Activity 8.9 - Water Resource Developments Construction and other activities within a catchment area.
The Environmental Clearance Certificate is for: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (Wind Power) 2.1. TITLE OF ACTIVITY Hoodia Pilot Wind Measuring Tower 2.2. LOCATION OF ACTIVITY The proposed Hoodia Pilot Wind Measuring Tower will be located at Farm Schönau No. 126, which is located in the southern parts of Namibia, in the //Karas Region, approximately 60 km south-west of //Karasburg Town and 50 km north of the Orange River.
1.
| Attachment | Size | 
|---|---|
| 2750_EMP_AB IN BEV Brewery in Okahandja.pdf | 1.1 MB | 
| 2750_ECC Old_AB IN BEV Brewery in Okahandja.pdf | 224.89 KB | 
| 2750_Map_AB IN BEV Brewery in Okahandja.pdf | 406.06 KB | 
| 2750_Screening Notice_AB IN BEV Brewery in Okahandja.pdf | 66.71 KB | 
| 2750_CV_AB IN BEV Brewery in Okahandja_0.pdf | 104.29 KB | 
1.
1.
| Attachment | Size | 
|---|---|
| 2062_SR_Opuwo Aerodrome.pdf | 2.68 MB | 
| 2062_EMP_Opuwo Aerodrome.pdf | 789.12 KB | 
| 2062_Support Letter_Opuwo Aerodrome.pdf | 235.19 KB | 
| 2062_Proof of Consultation_Opuwo Aerodrome.pdf | 1.49 MB | 
| 2062_Map_Opuwo Aerodrome.pdf | 170.24 KB | 
| 2062_Screening Notice_Opuwo Aerodrome.pdf | 74.83 KB | 
| 2062_CV_Opuwo Aerodrome.pdf | 53.91 KB | 
| 2062_BID_Opuwo Aerodrome.pdf | 323.43 KB | 
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: Activity 10.1(b) - Infrastructure The construction of public roads 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 TITLE OF ACTIVITY: Subdivision of Erven 2167, 2168 and 2169, Extension 6, Henties Bay 2.2 NATURE OF ACTIVITY: The activity entails the construction of public roads. 2.3 LOCATION OF ACTIVITY: Erven 2167, 2168 and 216 is in Extension 6 (south dune), Henties Bay which is located within the Erongo Region.
| Attachment | Size | 
|---|---|
| 2776_EMP_ML 142_Karibib District.pdf | 2.06 MB | 
| 2776_Environmental Audit_ML 142_Karibib District.pdf | 591.7 KB | 
| 2776_ECC Old_ML 142_Karibib District.pdf | 390.12 KB | 
| 2776_Map_ML 142_Karibib District.pdf | 162.79 KB | 
| 2776_Screening Notice_ML 142_Karibib District.pdf | 74.35 KB | 
| 2776_CV_ML 142_Karibib District.pdf | 60.4 KB | 
THE RENEWAL OF THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: The construction of public roads and quarrying for the purpose of base material, as well as potential removal of trees, which requires a permit as per the Forest Act, 2001 (Act No. 12 of 2001) or any other law. The ‘listed activities’ that might be affected are listed below: FORESTRY ACTIVITIES 4. The clearance of forest areas, deforestation, afforestation, timber harvesting or any other related activity that requires authorization in terms of the Forest Act, 2001 (Act No. 12 of 2001) or any other law.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: 1. (b) The transmission and supply of electricity. 4. Any other related activity that requires authorization in terms of the forest Act (Act No. 12 of 2001) or any other law. 5.2 The establishment of land resettlement schemes. 10.1 (b) The construction of public roads. 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 Title of the Activity Township Establishment: Amraalsduin Extensions 1& 2.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: The 'listed activities' that might be included as part of this development are listed below: o Activity 1 - Energy Generation, Transmission and Storage Activities (b) The construction of facilities for the transmission and supply of electricity o Activity 4 – Forestry Activities The clearance of forest areas, deforestation, afforestation, timber harvesting or any other related activity that requires authorization in terms of the Forest Act, 2001 (Act No. 12 of 2001) or any other law. 2.
The activities in which Coastal Precast and Paving CC engage in at the project site is mining and quarrying activities, all of which are registered under their Non-Exclusive Prospecting License No: 6352. Coastal Precast and Paving CC's mining and quarrying activities are being conducted under the following Mining Claims: Old Mining Claims: 68799, 68800, and 68801; and New Mining Claims: 73147, 73148, 73149, and 73150. Please note that no mining or quarrying activities are being undertaken or conducted under the new mining claims areas.
| Attachment | Size | 
|---|---|
| 2283_EMP_Coastal Precast and Paving CC.pdf | 902.84 KB | 
| 2283_ECC Old_Coastal Precast and Paving CC.pdf | 951.99 KB | 
| 2283_Map_Coastal Precast and Paving CC.pdf | 282.57 KB | 
| 2283_Screening Notice_Coastal Precast and Paving CC.pdf | 100.22 KB | 
This is an application for the renewal of an existing Environmental Clearance Certificate held by Ongha Service Station CC, in respect of their filling station situated in Ongha Village of the Endola Constituency, situated in Ohangwena Region, Namibia. The Ongha Service Station operates both a filling station, as well as a 24-hour convenience shop, and is supplied with fuel by Total Energies.
1. The Renewal of the Environmental Clearance Certificate is for: Continuation of the Solar Power Plant operation project on ML 142, for which an Environmental Clearance was obtained during October 2020 , which requires authorization in terms of the Environmental Management Act, 2007 (Act 7 of 2007) i.e. Energy Generation, Transmission and Storage activities. 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1. Title of Activity Continuation of the Solar Power Plant operation project on ML 142. 2.2.
The Environmental Clearance Certificate renewal is for: Continuation of an existing mining activity, for which an Environmental Clearance was obtained during November 2020, which requires authorization in terms of the Minerals (Prospecting and Mining) Act (No. 33 of 1992). 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 Title of the Activity Continuation of the mining (quarrying) for mineral dimension stone (i.e. granite).
| Attachment | Size | 
|---|---|
| 2081_EMP_MC 67826_28_31 Damara Granite.pdf | 1.19 MB | 
| 2081_ECC Old_MC 67826_28_31 Damara Granite.pdf | 396.75 KB | 
| 2081_Map_MC 67826_28_31 Damara Granite.pdf | 151.99 KB | 
| 2081_Screening Notice_MC 67826_28_31 Damara Granite.pdf | 73.25 KB | 
This is an application for a new Environmental Clearance Certificate for small scale mining in respect of 4 NEPL Claims on the Farm Rooiberg 83. These 4 NEPL Claims are: NEPL Claim 1 registered under NEPL Number: 73701, applied for on 7 September 2022, pertaining to dimension stone and semi-precious stones, with an extent of 17.868 hectares. NEPL Claim 2 registered under NEPL Number: 73766, applied for on 29 September 2022, pertaining to dimension stone and semi-precious stones, with an extent of 15.6717 hectares.
This is an application for a new Environmental Clearance Certificate. The Proponent, Reload Logistics Namibia (Pty) Ltd intends to establish a bulk warehousing and storage facility at the Port of Walvis Bay, more specifically at Erf 1920, Port of Walvis Bay, Walvis Bay Municipal District, Erongo Region, Namibia. Reload Logistics Namibia (Pty) Ltd intends to store minerals, and hazardous substances and materials, such as copper concentrate, sulfur, copper cathodes etc., as well as mining equipment, and project cargo. The proposed activity, falls under the following listed activity: 9.1.
This in an application for a new Environmental Clearance Certificate. This application had to be resubmitted due to the fact that the MEFT Portal crashed. The previous application number which was issued herein was APP-001175. The listed activities which are to be conducted fall under Mining and Quarrying Activities and are as follows: 3.2: Other forms of mining or extraction of any natural resources whether regulated by law or not; and 3.3: Resource extraction, manipulation, conservation, and related activities.
The Environmental Clearance Certificate renewal is for: Continuation of an existing mining activity, for which the initial Environmental Clearance was obtained during July 2014, which requires authorization in terms of the Minerals (Prospecting and Mining) Act (No. 33 of 1992). 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 Title of the Activity Continuation of the mining (quarrying) for mineral dimension stone (i.e. granite) at ML126.
| Attachment | Size | 
|---|---|
| 963_Environmnetal Questionaire_ML126 Walvis District.pdf | 1.99 MB | 
| 963_Proforma EC_ML126 Walvis District.pdf | 626.71 KB | 
THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: The continuation of the Land Use and Development Activities, for which an Environmental Clearance Certificate was obtained during August 2013. 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 Title of the Activity Continuation of the Land Use and Development Activities (Formalization of the DRC informal settlement and Township Establishment on Erf 184 and Mile 4 Proper as well as Portion 90 of the Remainder of Portion B of Swakopmund Town and Townlands), Swakopmund, Erongo Region.
1. THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: Continuation of an existing mining activity, for which the initial Environmental Clearance was obtained during July 2014, which requires authorization in terms of the Minerals (Prospecting and Mining) Act (No. 33 of 1992). 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1 Title of the Activity Continuation of the mining (quarrying) for mineral dimension stone (i.e. granite) at ML38 and 104.
This is an application for the Renewal of the current Environmental Clearance Certificate, held by Okapana Service Station CC, Ondangwa in the Oshana Region, Namibia. This is for an existing fuel retail facility, which is a public garage or filling station with a 24-hour convenience store. It is thus, a listed activity under paragraph 9.4 - which is the storage and handling of dangerous goods, including petrol, diesel, liquid petroleum, gas, or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location.
| Attachment | Size | 
|---|---|
| 1364_EMP_ECC Okapana Service Station in Ondangwa.pdf | 849.85 KB | 
| 1364_ECC Old_ECC Okapana Service Station in Ondangwa.pdf | 69.74 KB | 
| 1364_Map_ECC Okapana Service Station in Ondangwa.pdf | 280.5 KB | 
| 1364_Screening Notice_ECC Okapana Service Station in Ondangwa.pdf | 105.42 KB | 
This is an application for the renewal of the current Environmental Clearance Certificate, held by Bulk Mining Explosives (Pty) Ltd (Namibia). It is for a bulk emulsion plant and associated magazine situated in Arandis, Erongo Region, Namibia.
The Renewed and valid Environmental Clearance Certificate (ECC-02025) is for: The 'listed activities' that might be affected are listed below: Waste Management, Treatment, Handling and Disposal Activities Activity 2.2 - Activity entailing a scheduled process in the Atmospheric Pollution Prevention ordinance, 1976. Mining and Quarrying Activities Activity 3.2 - Other forms of mining or extracting or extraction of any natural resources whether regulated by law or not. Activity 3.3 - Resource extraction, manipulation, conservation and related activities.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: Activity 8.1 - Water Resource Developments The abstraction of ground or surface water for industrial or commercial purposes; Activity 8.2 - Water Resource Developments The abstraction of groundwater at a volume exceeding the threshold authorized in terms of a law relating to water resources; and o Activity 8.7 – Water Resources Developments Irrigation schemes for agriculture excluding domestic irrigation. TITLE OF ACTIVITY Increased groundwater abstraction at Remainder of Farm Sponholz No. 140.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power); Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (solar Power) o Activity 5.1(c) – Land Use and Development Activities Agricultural use to industrial use 2. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: 2.1. TITLE OF ACTIVITY Rosh Pinah Solar Park 2.2.
The environmental clearance certificate is for: Activity 8.9 Water resource developments: Construction and other activities within a catchment area. o Activity 10.1 (a) (Infrastructure) The construction the construction of - Oil, water, gas and petrochemical and other bulk supply pipelines. o Activity 10.1 (b) (Infrastructure) The construction of - Public roads.
The Application if for the name change from the current holder of Environmental Clearance Certificate (GreeNam Electricity (PTY) Ltd. to NamPower. Reason for Amendment(s): NAMPOWER ASSUMED RESPONSIBILITY OF THE 66kV OVERHEAD POWER TRANSMISSION LINE WHICH DISTRIBUTES ELECTRICITY TO THE NAMPOWER HARDAP SUBSTATION FROM THE HARDAP PHOTOVOLTAIC SOLAR PROJECT.
Valencia Uranium (Pty) Ltd / Namibplaas is a subsidiary of the international company Forsys Metals based in Toronto, Canada. Valencia Uranium (Pty) Ltd partakes in mining and exploration activities, as it is a member of the Namibia Uranium Project. This application was previously submitted for the renewal of the Environmental Clearance Certificate, which was held by Valencia Uranium (Pty) Ltd, under ML 149 and EPL 3638. This application was previously uploaded under App Number: APP-003845.
| Attachment | Size | 
|---|---|
| 924_EMP_Valencia Uranium_Namibplaas.pdf | 1.13 MB | 
| 924_ECC Old_Valencia Uranium_Namibplaas.pdf | 245.39 KB | 
| 924_Map_Valencia Uranium_Namibplaas.pdf | 222.18 KB | 
| 924_Screening Notice_Valencia Uranium_Namibplaas.pdf | 102.85 KB | 
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: o Activity 3(2) – Mining and Quarrying Activities Other forms of mining or extraction of any natural resource whether regulated by law or not (i.e. borrow pits &quarries) o Activity 4 – Forestry Activities Any other related activity that requires authorization in terms of the Forest Act, 2001 (i.e. removal and relocation of protected species) o Activity 8(1) – Water Resource Developments The abstraction of groundwater for industrial or commercial purpose (i.e.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: Activity 1(a) - Energy Generation, Transmission and Storage Activities The construction of facilities for the generation of electricity (solar Power). Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity (Overhead Transmission Lines). Activity 5.1(c) - Land Use and Development Activities Agricultural use to industrial like use 2.1. TITLE OF ACTIVITY Klein Spitskop Solar Energy Park 2.2.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: The ‘listed activities’ that might be included as part of this development are listed below: Land Use and Development Activities o Activity 1(b) - Energy Generation, Transmission and Storage Activities The construction of facilities for the transmission and supply of electricity o Activity 2.3 - Waste Management, Treatment, Handling and Disposal Activities Temporary storage and export of waste o Activity 4 - Forestry Activities Removal of protected species o Activity 8.9 - Water Resource Developments Construction and other activities within a
Urban Green cc (The Environmental Assessment Practitioner) has been appointed by GreeNam Electricity (PTY) Ltd (The Proponent) to apply for the transfer of an Environmental Clearance Certificate for the existing 66kV Power Transmission Line situated within the Mariental District, Hardap Region. The 66kV Power Transmission Line distributes electricity to the NamPower Hardap substation from the Hardap photovoltaic solar project.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: Activity 5.1 – Land Use and Development Activities (a) – The rezoning of land from residential use to industrial or commercial use. DETAILS OF THE ACTIVITY(S) COVERED BY THE ENVIRONMENTAL CLEARANCE CERTIFICATE: Title of the Activity The Rezoning of Portion 32 of Portion 5 of the Farm Döbra No. 49, Brakwater form 'residential' to 'industrial'.
The Environmental Clearance Certificate renewal is for: Activity 10.1 - Infrastructure (j) – Masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission. 2.1 Title of the Activity Operation of a Broadcasting Base Station at Erf 507, Tamariskia, Swakopmund. 2.2 Location of Activity The Broadcasting Base Station (BBS) is located on a portion of Erf 507, Tamariskia Extension 2, Swakopmund.
The environmental clearance certificate renewal is for: Mining and Quarrying Activities - Activity 3.2 - Other forms of mining or extraction of any natural resources whether regulated by law or not. Activity 3.3 - Resource extraction, manipulation, conservation and related activities. Activity 8.4 - Construction of canals and channels including the diversion of the normal flow of water in a riverbed and water transfer schemes between water catchments and impoundments. Activity 8.8 - Construction and other activities in watercourses within flood lines.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: Continuation of an existing mining activity, for which an Environmental Clearance was obtained during April 2018, which requires authorization in terms of the Minerals (Prospecting and Mining) Act (No. 33 of 1992). 2.1 Title of the Activity - Continuation of the mining (quarrying) for mineral dimension stone (i.e. granite). Location of Activity - Mining Claim 67547 (Nebiru Gold) is located 15km north-west of Okombahe, situated within the Omaruru Magistrate District, Daures Constituency, in the Erongo Region.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE RENEWAL IS FOR: o Activity 10.1 - Infrastructure (j) – Masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission. 2.1 Title of the Activity Operation of a Broadcasting Base Station at Erf 1166, Ext. 3, Rundu, Kavango East Region. 2.2 Location of Activity The Broadcasting Base Station (BBS) is located on a portion of Erf 1166, Extension 3 in Rundu, which is situated to the north-central parts of the larger Rundu town.
THE ENVIRONMENTAL CLEARANCE CERTIFICATE IS FOR: Activity 8.1- Water Resource Developments The abstraction of ground or surface water for industrial or commercial purposes. Activity 8.2 - Water Resource Developments The abstraction of groundwater at a volume exceeding the threshold authorized in terms of a law relating to water resources. Activity 8.7 - Water Resources Developments Irrigation schemes for agriculture excluding domestic irrigation 2.1. TITLE OF ACTIVITY Remainder of Farm Grunewald No. 135 Irrigation Expansion Development 2.2.
The application is for a renewal of an existing ECC issued in 2019.