These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The ECC is for the operation and maintenance of existing 220kV Harib - Aggeneis 1 and 2 transmission lines. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. The 220kV Harib - Aggeneis 1 and 2 transmission lines were constructed before the Environmental Management Act (Act 7 of 2007) and its regulations.
The ECC is for the operation and maintenance of an existing 66kV Okapya – Efundja transmission line including Okapya and Efundja substations and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. The 66kV Okapya – Efundja transmission line was constructed was constructed before the Environmental Management Act (Act 7 of 2007) and its regulations.
The ECC is for the operation and maintenance of an existing 220kV Khan – Trekkopje transmission line including Trekkopje Substation and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity.
The ECC is for the operation and maintenance of an existing 66kv Rehoboth - Blumfelde transmission line including Blumfelde, Rehoboth Substations and other associated infrastructures. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020, NamPower obtained the Environmental Clearance Certificate for the maintenance and operation of the 66kV Rehoboth - Blumfelde transmission line.
The ECC is for the operation and maintenance of the existing 66kv Gerus - Welwitschia transmission Line. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Gerus - Welwitschia transmission line.
Attachment | Size |
---|---|
4597_EMP_132kv Auas_Omaere transmission line.pdf | 1.24 MB |
4597_ECC Old_132kv Auas_Omaere transmission line.pdf | 198.44 KB |
4597_Map_132kv Auas_Omaere transmission line.pdf | 465.17 KB |
4597_Screening Notice_132kv Auas_Omaere transmission line.pdf | 82.15 KB |
4597_CV_132kv Auas_Omaere transmission line.pdf | 1.34 MB |
The ECC is for the operation and maintenance of an existing 66kV Omburu – Uis transmission line including Uis and Okombahe Substations and other associated infrastructures. In 2020, NamPower obtained the Environmental Clearance Certificate for the maintenance and operation of the 66kV Omburu - Uis transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV 66kV Omburu - Uis line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Attachment | Size |
---|---|
3977_EMP_66kV Omburu_Uis transmission line.pdf | 898.86 KB |
3977_ECC Old_66kV Omburu_Uis transmission line.pdf | 417.75 KB |
3977_Map_66kV Omburu_Uis transmission line.pdf | 531.85 KB |
3977_Screening Notice_66kV Omburu_Uis transmission line.pdf | 4.17 KB |
3977_CV_66kV Omburu_Uis transmission line.pdf | 1.49 MB |
The ECC is for the operation and maintenance of an existing 66kV Welwitschia - Kamanjab transmission line including Welwitschia, Fransfontein, Kamanjab Substations and other associated infrastructures. In 2020, NamPower obtained the Environmental Clearance Certificate for the maintenance and operation of the 66kV Welwitschia – Kamanjab transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Welwitschia – Kamanjab line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
The ECC is for the operation and maintenance of an existing 66kV Omburu - Marble transmission line and other associated infrastructures. In 2020, NamPower obtained the Environmental Clearance Certificate for the maintenance and operation of the 66kV Omburu - Marble transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Omburu - Marble line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Attachment | Size |
---|---|
3979_EMP_66kV Omburu_Marble transmission line.pdf | 910.77 KB |
3979_ECC Old_66kV Omburu_Marble transmission line.pdf | 204.22 KB |
3979_Screening Notice_66kV Omburu_Marble transmission line.pdf | 81.86 KB |
3979_Screening Notice_66kV Omburu_Marble transmission line_0.pdf | 81.86 KB |
The ECC is for the operation of the existing 66kv Otjikoto - Berg Aukas - Grootfontein transmission line including Berg Aukas, Khusib, and Grootfontein Substations and other associated infrastructures. In 2020, NamPower obtained the Environmental Clearance Certificate for the maintenance and operation of the 66kV Otjikoto - Grootfontein transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Otjikoto - Grootfontein line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
The ECC is for the operation and maintenance of an existing 66kV Otjiwarongo - Matemba transmission line including Matemba Substation. In 2020, NamPower obtained the Environmental Clearance Certificate for the maintenance and operation of the 66kV Otjiwarongo - Matemba transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Otjiwarongo - Matemba line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. This application will also include the Matemba Substation that was not previously included.
The ECC is for the operation and maintenance of an existing 220kV Omburu - New Khan 1 & 2 transmission lines including New Khan substation and other associated infrastructures. In 2020, NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of the 220kV Omburu - Khan 1 and 2. NamPower would therefore like to apply for the renewal of the ECC for 66kV Bismarck - Witvlei line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
The ECC is for the operation and maintenance of an existing 66kV Hardap – Mariental transmission line including Mariental Substation and other associated infrastructures. In 2021, NamPower obtained the Environmental Clearance Certificate for the maintenance and operation of the 66kV Hardap - Mariental transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Hardap - Mariental line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
The ECC is for the operation and maintenance of an existing 66kV Witvlei – Omaheke transmission line including Witvlei and Omaheke Substations in Omaheke Region. In 2020, NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Witvlei - Omaheke transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Witvlei - Omaheke line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
The ECC is for the operation and maintenance of an existing 66kV Otjikoto – Asis West transmission line including Asis West substation and other associated infrastructures. In 2020, NamPower obtained the Environmental Clearance Certificate for the maintenance and operation of the 66kV Otjikoto - Asis West transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Otjikoto - Asis West line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Attachment | Size |
---|---|
3828_EMP_Khomas Substation in Khomas Region.pdf | 268.21 KB |
3828_ECC Old_Khomas Substation in Khomas Region.pdf | 394.71 KB |
3828_Map_Khomas Substation in Khomas Region.pdf | 496.26 KB |
3828_Screening Notice_Khomas Substation in Khomas Region.pdf | 324.97 KB |
3828_CV_Khomas Substation in Khomas Region.pdf | 123.04 KB |
The ECC is for the Environmental Clearance Certificate for the operation and maintenance of an existing 66kV transmission Line from Omatako T-Off Substation to Omatako Base Substation including Omatako T-Off, Hochfeld, Omatako Booster, Ombotozu and Omatako Substations. The 66kv transmission line from Omatako T-Off substation to Omatako Base was constructed in 1984 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development.
The Environmental Clearance Certificate is for the operation and maintenance of the existing 350kv Gerus - Zambezi Transmission Line Associated Infrastructures. In 2020 NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of the 350kV Gerus - Zambezi High Voltage Direct Current (HVDC) transmission line. NamPower would therefore like to apply for the renewal of the ECC for 350kV Gerus - Zambezi line and associated infrastructure in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
The Environmental Clearance certificate is for the construction and operation of the second (II) 400kV transmission line from Korkerboom substation near Keetmanshoop to Auas substation near Windhoek. Note: The updated EMP file is unfortunately corrupted. MET has been informed.
The ECC is for the operation and maintenance of an existing 66kV Gerus - Ombika Transmission line including Ombika Substation. In 2020, NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Gerus - Ombika transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Gerus - Ombika line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. This application will also include Ombika Substation that was not previously included.
The ECC is for the operation and maintenance of an existing 66kV Gerus - Paresis Transmission line including Paresis Substation. In 2020, NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Gerus - Paresis transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Gerus - Paresis line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. This application will also include the Paresis Substation that was not previously included.
The ECC is for the operation and maintenance of an existing 66kV Gerus - Otjiwarongo Transmission line including Otjiwarongo Substation. In 2020, NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Gerus - Otjiwarongo transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Gerus - Otjiwarongo line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. This application will also include the Otjiwarongo Substation that was not previously included.
The ECC is for the operation and maintenance of the existing 220kV Omburu - Gerus Transmission line. In 2020 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 220kV Omburu - Gerus transmission line. NamPower would therefore like to apply for the renewal of the ECC for 220kV Omburu - Gerus line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Attachment | Size |
---|---|
2455_EMP_220kV Omburu_Gerus Transmission Line.pdf | 809.91 KB |
2455_Map_220kV Omburu_Gerus Transmission Line.pdf | 532.06 KB |
2455_Screening Notice_220kV Omburu_Gerus Transmission Line.pdf | 81.5 KB |
The ECC is for the operation and maintenance of an existing 66kV Gerus - Platveld Transmission line including Platveld and Okorusu Substations. In 2020, NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Gerus - Platveld transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Gerus - Platveld line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Attachment | Size |
---|---|
2462_EMP_66kV Gerus_Platveld Transmission line.pdf | 757.5 KB |
2462_Map_66kV Gerus_Platveld Transmission line.pdf | 450.07 KB |
2462_Screening Notice_66kV Gerus_Platveld Transmission line.pdf | 81.55 KB |
The ECC is for the operation and maintenance of the existing 220kv Auas - Hardap 1 and 2 transmission lines. In 2020 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 220kV Auas - Hardap 1 and 2 transmission line. NamPower would therefore like to apply for the renewal of the ECC for 220kV Auas - Hardap 1 and 2 line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Attachment | Size |
---|---|
2456_EMP_220kv Auas_Hardap 1 and 2 Transmission Lines.pdf | 772.95 KB |
2456_Map_220kv Auas_Hardap 1 and 2 Transmission Lines.pdf | 560.61 KB |
2456_Screening Notice_220kv Auas_Hardap 1 and 2 Transmission Lines.pdf | 81.59 KB |
The ECC is for the operation and maintenance of the 66kV Bismarck - Witvlei transmission line including Seeis and Otjivero substations and other associated infrastructures. In 2020, NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Bismarck - Witvlei transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Bismarck - Witvlei line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
The ECC is for the operation and maintenance of an existing 66kv Mariental - Maltahöhe Distribution Line including Mariental and Maltahöhe Substations in Hardap Region. In 2020, NamPower obtained the Environmental Clearance Certificate for the management and operation of the 33kV Mariental – Maltahohe distribution line. NamPower would therefore like to apply for the renewal of the ECC for 33kV Mariental – Maltahohe line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Attachment | Size |
---|---|
2457_EMP_66kv Mariental_Maltahohe Distribution Line.pdf | 976.75 KB |
2457_Map_66kv Mariental_Maltahohe Distribution Line.pdf | 441.83 KB |
2457_Screening Notice_66kv Mariental_Maltahohe Distribution Line.pdf | 81.69 KB |
The ECC is for the operation and maintenance of an existing 66kv Omaere - Gobabis transmission line including Omaere substation. In 2020, NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Omaere - Gobabis transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Omaere - Gobabis line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations. This application will also include Omaere Substation that was not previously included.
Attachment | Size |
---|---|
2458_EMP_66kv Omaere_Gobabis transmission line.pdf | 728.2 KB |
2458_Map_66kv Omaere_Gobabis transmission line.pdf | 88.56 KB |
2458_Screening Notice_66kv Omaere_Gobabis transmission line.pdf | 81.49 KB |
The ECC is for the operation and maintenance of an existing 66kV Rundu - Mahango Transmission line including Mahango substation and other associated infrastructures. In 2020 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 66kV Rundu - Mahango transmission line. NamPower would therefore like to apply for the renewal of the ECC for 66kV Rundu - Mahango line in order to comply with the Environmental Management Act (Act 7 of 2007) and its regulations.
Attachment | Size |
---|---|
2342_EMP_66kV Rundu_Mahango Transmission line.pdf | 1018.09 KB |
2342_ECC Old_66kV Rundu_Mahango Transmission line.pdf | 341.11 KB |
2342_Map_66kV Rundu_Mahango Transmission line.pdf | 437.43 KB |
2342_Screening Notice_66kV Rundu_Mahango Transmission line.pdf | 82 KB |
Construction and Operation of the Grunau Wind Mast, Site 4.
Attachment | Size |
---|---|
2249_SR_Grunau Wind Mast Site 4_Karas Region.pdf | 1.66 MB |
2249_ECC Old_Grunau Wind Mast Site 4_Karas Region.pdf | 450.62 KB |
2249_Map_Grunau Wind Mast Site 4_Karas Region.pdf | 196.9 KB |
2249_Screening Notice_Grunau Wind Mast Site 4_Karas Region.pdf | 31.11 KB |
The ECC is for the operation and maintenance of Ruacana Eha Lodge. Under the Environmental Management Act (Act 7 of 2007) and the Environmental Impact Assessment Regulations (2012), the activity described as "Tourism development activities" requires an Environmental Clearance Certificate. In 2020 NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of Ruacana Eha Lodge.
Attachment | Size |
---|---|
2221_EMP_Ruacana Eha Lodge in Omusati.pdf | 1.07 MB |
2221_ECC Old_Ruacana Eha Lodge in Omusati.pdf | 306.23 KB |
2221_Map_Ruacana Eha Lodge in Omusati.pdf | 163.51 KB |
2221_Screening Notice_Ruacana Eha Lodge in Omusati.pdf | 82.14 KB |
The application to renew the Environmental Clearance Certificate for the operation and maintenance of an existing Okatope transmission station in Oshikoto Region. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of the Okatope Transmission Station.
The ECC is for the operation and maintenance of an existing Kokerboom Transmission Station in \\Karas Region. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of the Kokerboom Transmission Station.
The ECC application to renew the environmental clearance certificate for the operation and maintenance of an existing Hardap transmission station in Hardap region. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of the Hardap Transmission Station.
The application to renew the Environmental Clearance Certificate for the operation and maintenance of an existing Obib transmission station in \\Karas Region. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of the Obib Transmission Station.
Attachment | Size |
---|---|
2115_EMP_Obib Transmission Station in Karas Region.pdf | 1015.07 KB |
2115_ECC Old_Obib Transmission Station in Karas Region.pdf | 338.36 KB |
2115_Map_Obib Transmission Station in Karas Region.pdf | 512.07 KB |
2115_Screening Notice_Obib Transmission Station in Karas Region.pdf | 82.06 KB |
The application to renew Environmental Clearance Certificate for the operation and maintenance of an existing Otjikoto transmission station in Oshikoto region. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the operation and maintenance of the Otjikoto Transmission Station.
The ECC is for the operation and maintenance of the existing 220kV Van Eck - Auas Powerline 1, 2 & 3. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 220kV Van Eck - Auas transmission line.
The ECC is for the operation and maintenance of an existing 132kV Zambezi - Katima transmission line including Katima substation. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 132kV Zambezi - Katima transmission line.
The ECC is for the operation and maintenance of the existing 220kV Van Eck - Kuiseb transmission line. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 220kV Van Eck - Kuiseb transmission line.
Attachment | Size |
---|---|
1898_EMP_220kV Van Eck_Kuiseb transmission line.pdf | 1001.42 KB |
1898_ECC Old_220kV Van Eck_Kuiseb transmission line.pdf | 218.9 KB |
1898_Map_220kV Van Eck_Kuiseb transmission line.pdf | 562.87 KB |
1898_Screening Notice_220kV Van Eck_Kuiseb transmission line.pdf | 81.96 KB |
The ECC is for the operation and maintenance of an existing 66kV Rehoboth - Klein Aub transmission line including Klein Aub and Oanob Substations. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the management and operation of the 220kV Van Eck - Kuiseb transmission line.
Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy distribution, transmission and generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2019 NamPower obtained the Environmental Clearance Certificate for the 400kV Auas - Kokerboom. NamPower would like to apply for the renewal of the 400kV Auas - Kokerboom in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.
Attachment | Size |
---|---|
1232_EMP_400KV Auas_Kokerboom transmission line.pdf | 725.68 KB |
1232_ECC Old_400KV Auas_Kokerboom transmission line.pdf | 291.91 KB |
1232_Map_400KV Auas_Kokerboom transmission line.pdf | 116.08 KB |
1232_Screening Notice_400KV Auas_Kokerboom transmission line.pdf | 184.41 KB |
The ECC is for the operation and maintenance of an existing 66kv Okapya – Oshakati Transmission Line and Oshakati Substation. The 66 kV Okapya – Oshakati transmission line and Oshakati substation was constructed prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development.
The ECC is for the Operation and Maintenance of Ruacana Power Station. Under the Environmental Management Act (Act 7 of 2007) section 27 the activity described as "energy generation" requires an Environmental Clearance Certificate (ECC) as it is a listed activity. In 2020 NamPower obtained the Environmental Clearance Certificate for the Operation of Ruacana Power station. The ECC will expire on 24 August 2023.
Attachment | Size |
---|---|
1779_ECC Old and EMP_Ruacana Power Station.pdf | 967.11 KB |
1779_Map_Ruacana Power Station.pdf | 114.49 KB |
1779_Screening Notice_Ruacana Power Station.pdf | 184.28 KB |
For the operation and maintenance of the existing Namib Substation, Koichab T- Off substation, Luderitz Substation, Lorelei Substation and associated infrastructure : - 66kV transmission line from Namib Substation to Koichab T-Off Substation covering 100m in length. - 66KV transmission line from Namib Substation to Lorelei substation in Rosh Pinah, covering 213km in length and 22m wide powerline servitude. - 66kV transmission line from Koichab T-Off Substation to Luderitz Substation covering approximately 26km in length and 22m wide powerline line servitude.
The Environmental Clearance certificate is for the operation and maintenance of the existing Finke-Bismark 66kV transmission line, Van-Eck- Finke 66kV transmission line, Finke Substation , Bismark Substation and Finke-Hoffnung 33kV powerline.
In 2019, NamPower obtained an Environmental Clearance Certificate (ECC) for the Vegetation Management for the 132 kV Otjikoto - Rundu Transmission line servitudes in Otjikoto and Kavango East Regions. However, the other operational and maintenance activities and the proposed 220kV transmission line were not included in the previous ECC which was issued.
The environmental clearance certificate is for the operation of Omburu substation and construction and operation of the Battery Energy Storage System and associated infrastructure.
Attachment | Size |
---|---|
1552_EMP_Omburu substation.pdf | 1.15 MB |
1552_ECC Old_Omburu substation.pdf | 463.56 KB |
1552_Map_Omburu substation.pdf | 241.28 KB |
1552_Screening Notice_Omburu substation.pdf | 245.51 KB |
The ECC is for the renewal for the operation and maintenance of the 132kV Hippo - Omatando transmission line and Hippo Substation. In 2019, NamPower obtained an Environmental Clearance Certificate (ECC) for the Vegetation Management, Ruacana - Omatando along the 132 kV Transmission line. However, Hippo substation and the other operational and maintenance activities were not included in the previous ECC. Furthermore, the name of the line also changed from Ruacana – Omatando to Hippo – Omatando.