These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow exploration work on the Exclusive Prospecting License (EPL) No. 9250. The primary interest will be to seek for base, rare, precious metals, industrial minerals and dimension stone mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
Attachment | Size |
---|---|
4448_ESA_EPL No 9250_Karas Region.pdf | 7.03 MB |
4448_EMP_EPL No 9250_Karas Region.pdf | 603.92 KB |
4448_Minutes_EPL No 9250_Karas Region.pdf | 2.56 MB |
4448_Proof of Consultation_EPL No 9250_Karas Region.pdf | 2.56 MB |
4448_Map_EPL No 9250_Karas Region.pdf | 1.25 MB |
4448_NHC Consent_EPL No 9250_Karas Region.pdf | 1009.64 KB |
4448_Screening Notice_EPL No 9250_Karas Region.pdf | 1.37 MB |
The Proponent is interested in conducting exploration activities on EPL 9490 for Base and Rare Metals, Dimension Stone, Industrial Minerals, and Precious Metals.
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow exploration work on the Exclusive Prospecting License (EPL) No. 9036. The primary interest will be to seek for base, rare, precious metals, industrial minerals and dimension stone mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow the applicant to conduct exploration work on the Exploration Prospecting License No. 7469. The primary interest will be to seek for industrial minerals and nuclear fuel mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
Attachment | Size |
---|---|
32_ESAR_EPL 7469_Uis.pdf | 5.87 MB |
32_EMP_EPL 7469_Uis.pdf | 416.02 KB |
32_Consent Letter_EPL 7469_Uis.pdf | 542.7 KB |
32_Proof of Consultation_EPL 7469_Uis.pdf | 2.86 MB |
32_Map_EPL 7469_Uis.pdf | 151.65 KB |
32_Screening Notice_EPL 7469_Uis.pdf | 135.09 KB |
32_CV_EPL 7469_Uis.pdf | 87.15 KB |
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow exploration work on the Exclusive Prospecting License (EPL) No. 8816. The primary interest will be to seek for dimension stone, industrial minerals, precious metals, base and Rare Earth Elements mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
Attachment | Size |
---|---|
1750_ESAR_EPL No 8816 Outjo District.pdf | 2.77 MB |
1750_EMP_EPL No 8816 Outjo District.pdf | 318.29 KB |
1750_Consent Letter_EPL No 8816 Outjo District.pdf | 664.17 KB |
1750_Proof of Consultation_EPL No 8816 Outjo District.pdf | 1.65 MB |
1750_Map_EPL No 8816 Outjo District.pdf | 130.94 KB |
1750_Screening Notice_EPL No 8816 Outjo District.pdf | 82.56 KB |
1750_CV_EPL No 8816 Outjo District.pdf | 57.32 KB |
1750_BID_EPL No 8816 Outjo District.pdf | 486.98 KB |
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow exploration work on the Exclusive Prospecting License (EPL) No. 6776. The primary interest will be to seek for dimension stone and nuclear fuel mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow exploration work on the Exclusive Prospecting License (EPL) No. 8228. The primary interest will be to seek for industrial minerals and precious metals mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
Attachment | Size |
---|---|
2315_SR_EPL No 8228 Karas Region.pdf | 4.42 MB |
2315_EMP_EPL No 8228 Karas Region.pdf | 1019.02 KB |
2315_EC Letter_EPL No 8228 Karas Region.pdf | 80.29 KB |
2315_Heritage Impact Assessment_EPL No 8228 Karas Region.pdf | 1.45 MB |
2315_Proof of Consultation_EPL No 8228 Karas Region.pdf | 574.93 KB |
2315_Map_EPL No 8228 Karas Region.pdf | 398.88 KB |
2315_Screening Notice_EPL No 8228 Karas Region.pdf | 42.2 KB |
2315_CV_EPL No 8228 Karas Region.pdf | 57.32 KB |
2315_BID_EPL No 8228 Karas Region.pdf | 561.97 KB |
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow the applicant to conduct exploration work on the Exploration Prospecting License No. 7498. The primary interest will be to seek for industrial minerals, precious metals, base and Rare Earth Elements mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No. 7 of 2007) the Government has made a list of projects which need an environmental clearance like mining, thermal power plants, infrastructure etc.
Attachment | Size |
---|---|
44_ESA_EPL 7498 located in Uis District.pdf | 5.25 MB |
44_EMP_EPL 7498 located in Uis District.pdf | 486.91 KB |
44_Consent Letter_EPL 7498 located in Uis District.pdf | 168.91 KB |
44_Proof of Consultation_EPL 7498 located in Uis District.pdf | 1.65 MB |
44_Map_EPL 7498 located in Uis District.pdf | 226.88 KB |
44_Screening Notice_EPL 7498 located in Uis District.pdf | 81.38 KB |
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow the applicant to conduct exploration work on the Exploration Prospecting License No. 8100. The primary interest will be to seek for industrial minerals, dimension stone, precious metals, base and Rare Earth Elements mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No.
Attachment | Size |
---|---|
36_ESAR_EPL 8100 located in Uis District.pdf | 4.04 MB |
36_EMP_EPL 8100 located in Uis District.pdf | 620.04 KB |
36_Consent Letter_EPL 8100 located in Uis District.pdf | 375.84 KB |
36_Proof of Consultation_EPL 8100 located in Uis District.pdf | 1.45 MB |
36_Map_EPL 8100 located in Uis District.pdf | 226.43 KB |
36_Screening Notice_EPL 8100 located in Uis District.pdf | 81.83 KB |
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow the applicant to conduct exploration work on the Exploration Prospecting License No. 7576. The primary interest will be to seek for industrial minerals, dimension stone, precious metals, base and rare metals mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No.
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow exploration work on the Exclusive Prospecting License (EPL) No. 8801. The primary interest will be to seek for Nuclear fuel, dimension stone, industrial minerals, precious metals, base and Rare Earth Elements mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No.
Attachment | Size |
---|---|
1511_ESAR_EPL No 8801_Karibib District.pdf | 5.51 MB |
1511_EMP_EPL No 8801_Karibib District.pdf | 1.01 MB |
1511_Consent Request_EPL No 8801_Karibib District.pdf | 296.63 KB |
1511_Proof of Consultation_EPL No 8801_Karibib District.pdf | 981.24 KB |
1511_Map_EPL No 8801_Karibib District.pdf | 239.95 KB |
1511_NHC Application_EPL No 8801_Karibib District.pdf | 205.05 KB |
1511_Screening Notice_EPL No 8801_Karibib District.pdf | 159.08 KB |
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow the applicant to conduct exploration work on the Exploration Prospecting License No. 7470. The primary interest will be to seek for industrial minerals, dimension stone, precious metals, base and Rare Earth Elements mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No.
For the renewal of the Environmental Clearance Certificate for the operation of Sanny Auto Repairs Service Station at Ogongo in Omusati region.
The renewal of Environmental Clearance Certificate for the operation of the existing Omungwelume Service Station in Ohangwena Region.
For the renewal of Environmental Clearance Certificate of the operation of existing Sesriem Service Station at Sesriem, Sossusvlei, Hardap Region.
The renewal of Environmental Clearance Certificate for the operation of the existing Onesi Service Station at Onesi, Omusati Region.
The applicant wishes to apply and obtain an Environmental clearance, this clearance will allow the applicant to conduct exploration work on the Exploration Prospecting License No. 7498. The primary interest will be to seek for Nuclear fuel (applied for) industrial minerals, precious metals, base and Rare Earth Elements mineral groups within the license area. Under the 2012 Environmental Impact Assessment (EIA) Regulations of the Environmental Management Act (EMA) (Act No.
Attachment | Size |
---|---|
66_ESAR_EPL No 6933 Erongo Region.pdf | 9.94 MB |
66_EMP_EPL No 6933 Erongo Region.pdf | 665.19 KB |
66_Proof of Consultation_EPL No 6933 Erongo Region.pdf | 3.26 MB |
66_Map_EPL No 6933 Erongo Region.pdf | 454.33 KB |
66_NHC Consent_EPL No 6933 Erongo Region.pdf | 141.4 KB |
66_Screening Notice_EPL No 6933 Erongo Region.pdf | 154.91 KB |
The construction and operation of the proposed Ketu Two Thousand service station at Etunda Village in Omusati Region.
The operation of the existing Puma Eros service station in Eros, Windhoek, Khomas Region.
Attachment | Size |
---|---|
502_EMP_Puma Eros service station in Eros.pdf | 1.26 MB |
502_Retail Licence_Puma Eros service station in Eros.pdf | 162.6 KB |
502_Map_Puma Eros service station in Eros.pdf | 236.68 KB |
503_Screening Notice_Nelson Mandela service station in Windhoek_0.pdf | 53.74 KB |
The operation of the existing Nelson Mandela service station in Windhoek, Khomas Region.
The operation of the existing Henadava service station in Katutura, Windhoek, Khomas Region.
Attachment | Size |
---|---|
504_EMP_Henadava service station in Katutura.pdf | 1.09 MB |
504_Retail Licence_Henadava service station in Katutura.pdf | 26.38 KB |
504_Map_Henadava service station in Katutura.pdf | 261.81 KB |
504_Screening Notice_Henadava service station in Katutura.pdf | 54.24 KB |
The operation of the existing Soweto service station in Katutura, Windhoek, Khomas Region.
Attachment | Size |
---|---|
505_EMP_Soweto service station in Katutura.pdf | 1.47 MB |
505_Retail Licence_Soweto service station in Katutura.pdf | 473.49 KB |
505_Map_Soweto service station in Katutura.pdf | 243.16 KB |
505_Screening Notice_Soweto service station in Katutura.pdf | 48.39 KB |
The operation of the existing Munitenge service station in Windhoek, Khomas Region.
The operation of the existing Rhino Park service station in Windhoek, Khomas Region.
The operation of the existing Bach Street Puma service station in Windhoek, Khomas Region.
The operation of the existing Van der Walt Motors service station in Windhoek, Khomas Region.
The operation of the existing Puma Klein Windhoek Service Station in Windhoek, Khomas Region.
The continuation of the operations of existing Onamulunga Service Station at Oniipa in Oshikoto Region.
The operation of the existing Nelson Mandela Service Station in Windhoek Khomas Region.
The operation of the existing Puma Eros Service Station in Windhoek, Khomas Region.
Attachment | Size |
---|---|
447_EMP_Puma Eros service station in Windhoek.pdf | 194.82 KB |
447_Environmental Monitoring_Puma Eros service station in Windhoek.pdf | 529.83 KB |
447_Retail Licence_Puma Eros service station in Windhoek.pdf | 199.1 KB |
447_Map_Puma Eros service station in Windhoek.pdf | 444.91 KB |
The operation of the existing Henadava Service Station in Katutura, Windhoek, Khomas Region.
Attachment | Size |
---|---|
443_EMP_Henadava service station in Katutura.pdf | 193.08 KB |
443_Environmental Monitoring_Henadava service station in Katutura.pdf | 517.13 KB |
443_Retail Licence_Henadava service station in Katutura.pdf | 26.38 KB |
443_Map_Henadava service station in Katutura.pdf | 410.04 KB |
The operation of the existing Munitenge Service Station in Windhoek, Khomas Region.
Attachment | Size |
---|---|
442_EMP_Munitenge service station in Windhoek.pdf | 193.29 KB |
442_Environmental Monitoring_Munitenge service station in Windhoek.pdf | 571.27 KB |
442_Retail Licence_Munitenge service station in Windhoek.pdf | 22.98 KB |
442_Map_Munitenge service station in Windhoek.pdf | 449.51 KB |
The operation of the existing Soweto Service Station in Katutura, Windhoek, Khomas Region.
Attachment | Size |
---|---|
452_EMP_Soweto service station in Katutura.pdf | 195.02 KB |
452_Monitoring Report_Soweto service station in Katutura.pdf | 475.61 KB |
452_Retail Licence_Soweto service station in Katutura.pdf | 473.49 KB |
452_Map_Soweto service station in Katutura.pdf | 428.87 KB |
Construction and operations of an abattoir for a piggery on Farm Oribib 33A at Otjikondo, Outjo, Kunene Region.
Renewal of Environmental Clearance Certificate for the operation of Ekuku Service Station in Oshakati, Oshana Region. The service station constitutes of three underground tanks , one Petrol (1) and two Diesel tanks each with the capacity of 46 cubic meter(m³).
Attachment | Size |
---|---|
2922_EMP_Ekuku Service Station in Oshakati_Oshana Region.pdf | 349.23 KB |
2922_ECC_Ekuku Service Station in Oshakati_Oshana Region.PDF | 459.28 KB |
2922_Map_Ekuku Service Station in Oshakati_Oshana Region.pdf | 2.47 MB |
Renewal of Environmental Clearance Certificate for the operations of EJ Trading Filling Station in Oshikango, Ohangwena region. The filling station constitutes of three underground storage tanks, consisting of Petrol (1) and Diesel (2) with the capacity of 46m³ and 23m³ respectively.
Renewal of Environmental Clearance Certificate for the operations of solar photovoltaic facility and associated infrastructure at Rosh Pinah, Karas region. The solar plant covers 12 hectares with 18000 solar panels.
Renewal of Environmental Clearance Certificate for the operation of existing Okalongo Service Station in Onandjaba, Okalongo. The service stations constitutes of two underground tanks, each with the capacity of 46m³.
Renewal of Environmental Clearance Certificate for the construction and operation of Soweto service station in Windhoek, Khomas Region. The site will consist of one(1) Petrol and two(2) Diesel underground tanks, each with the capacity of 23cubic meter(m³).
Renewal of Environmental Clearance Certificate for the construction and operation of Masivi Truckport and Filling Station in Rundu, Kavango West Region. The site will consist of one(1) Petrol and two(2) Diesel underground tanks, each with the capacity of 46 cubic meter(m³).
Transfer of Environmental Clearance certificate from Eco-Fuel CC to trade under Erongo Petroleum CC 2. There is no change of activities and no adverse environmental effect arising from the proposed amendment 3. To operate under the same EMP issued to Eco-Fuel cc.
The ECC is for the Exploration activities on Exclusive Prospecting Licenses 7405, 7406 and 7407 at Otjozondu village, Otjozondjupa region. The Prospecting programme will consist of both non-invasive and invasive methods. The non- invasive method consist topographical and geophysical survey followed by a mapping and rock chip phase. The invasive method consist of both reverse circulation and Diamond Core Drilling.
To renew environmental clearance of mwene Fuel Service Station at Omuntele , Oshikoto Region, That was expire .
Environmental Impact Assessment for the operation of an existing Sesriem fuel station at Sesriem, Sousssvlei, Hardap Region. The fuel station has been operating without an EMP on place, therefore Enercon Namibia (Pty) Ltd intends to regularize the operation of the existing fuel station according to the Environmental Management Act (2007) and its Regulations (2012). The site constitutes of three (3) underground fuel tanks (Diesel (2) and Petrol 1) each with the capacity of 23000L to cater for the vehicles in the Namibia Wildlife Resort in Sesriem.
Attachment | Size |
---|---|
1427_ECC Application and EMP_Sesriem fuel station at Sesriem.pdf | 4.72 MB |
1427_Retail Licence_Sesriem fuel station at Sesriem.PDF | 60.25 KB |
1427_Map_Sesriem fuel station at Sesriem.pdf | 288.13 KB |
For the operation of a temporary fuel consumer installation facility on portion 8 of farm 67, Kapps farm, Windhoek, Khomas region. The site will constitute of two (2) self bunded above ground fuel tanks with a combined capacity of 126340L (126.34 cubic meters), to use as a temporary storage and source of fuel supply for the road construction project of Windhoek-Hosea Kutako Airport road, but not for public retail purposes.
Attachment | Size |
---|---|
1081_EMP_portion 8 of farm 67_Kapps farm.pdf | 1.23 MB |
1081_Newspaper adverts_portion 8 of farm 67_Kapps farm.PDF | 3.91 MB |
1081_Scoping Report_portion 8 of farm 67_Kapps farm.pdf | 18.27 MB |
1081_Support doc_portion 8 of farm 67_Kapps farm.pdf | 395.04 KB |