These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Kamau Town Planning and Development Specialist have been appointed by the Motor Vehicle Accidents Fund of Namibia (MVA) to undertake an Environmental Impact Assessment for the proposed rezoning of Erf 1370, Keetmanshoop from "General Residential" with a density of 1:100 to "Business Zone 2" with a bulk of 2.00.
The Environmental Clearance Certificate being renewed and amended is for the Layout Approval and Township Establishment on Consolidated Erf 2579, Tsumeb.
In accordance with section 27 of the EMA and section 5 of the EMA regulations, the land use transformation proposed below is listed as part of the activities which may not be undertaken without an Environmental Impact Assessment:subdivision of erf 1000 extension 5, grootfontein into 26 portions and the remainder street of erf 1000, rezoning of portions 1-13 and 24 (of erf 1000), extension 5 grootfontein from 'industrial 1' to 'local business', rezoning of portions 14-23 (of erf 1000), extension 5 grootfontein from 'industrial 1' to 'residential 1', rezoning of portions 25,26, and re/1000 (o
The amendment of conditions of establishment, the construction of a public road and the closing of public open space through statutory town planning procedures at Eheke settlement.
Rezoning of land from "General Industrial" to "Undetermined" and simultaneously for the construction of public roads, infrastructure and activities in water courses within flood lines through township establishments at Karibib to be known as Usab Extensions.
Construction of public roads and infrastructure, and construction activities within watercourses, through township establishments.
The ECC is for the establishment and operation of a self-catering tent lodge in the Sikunga Conservancy.
Construction of Infrastructure through Township Establishment at Okahao.
Environmental Clearance for, construction of public roads, infrastructure, and construction of other activities in watercourses within flood liens through Township Establishment. The Environmental Management Act (Act 7 of 2007), Section 8. Water Resource Developments; 8.8. Construction and other activities in watercourses within flood lines; 8.9. Construction and other activities within a catchment area; Section 10. Infrastructure: 10.1. The construction of- 10.1. (b) public roads; 10.2. Route determination of roads and design of associate physical infrastructure where- 10.2.
For infrastructure development through township establishment and layout planning within potential flood areas.