Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 10 of 10
Thursday, 13 November 2025
Kamau Town Planning and Development Specialists 2025. 250717006133: ECC for the layout approval and township establishment on the Remainder of Consolidated Erf X, Otjomuise Extension 1, Otjomuise, Windhoek, Khomas Region.
The ECC is for the Layout Approval and Township Establishment on the Remainder of Consolidated Erf X, Otjomuise Extension 1, Otjomuise, Windhoek, Khomas Region, which triggers Activity 5.1 (d) Land Use and Development Activity 8.8 Water resource developments Activity 10.1 (a) Infrastructure Activity 10.1 (b) Infrastructure The construction of public roads Activity Activity 10.2 (a) Infrastructure The route determination of roads and design of associated physical infrastructure where - it is a public road.
Tuesday, 15 July 2025
Kamau Town Planning and Development Specialists 2025. 250613005922: Environmental Clearance Certificate for the Rezoning of Erf 1370, Keetmanshoop from General Residential with a density of 1:100 to Business Zone 2 with a bulk of 2- Keetmanshoop, Karas Region.

Kamau Town Planning and Development Specialist have been appointed by the Motor Vehicle Accidents Fund of Namibia (MVA) to undertake an Environmental Impact Assessment for the proposed rezoning of Erf 1370, Keetmanshoop from "General Residential" with a density of 1:100 to "Business Zone 2" with a bulk of 2.00.

Wednesday, 2 April 2025
Kamau Town Planning and Development Specialists 2025. 250314005526: Renewal and amendment of the Environmental Clearance Certificate for the layout approval and establishment of a Township on Consolidated Erf 2579, Tsumeb to be known as Tsumeb Extension No. 11, Tsumeb, Oshikoto Region.

The Environmental Clearance Certificate being renewed and amended is for the Layout Approval and Township Establishment on Consolidated Erf 2579, Tsumeb.

Monday, 30 September 2024
Kamau Town Planning and Development Specialists 2024. 240528003837: Subdivision of Erf 1000 into 26 Portion and the Remainder and Erf 1001 into 23 Portion and the Remainder, Extension 5, Grootfontein, and subsequent rezoning.

In accordance with section 27 of the EMA and section 5 of the EMA regulations, the land use transformation proposed below is listed as part of the activities which may not be undertaken without an Environmental Impact Assessment:subdivision of erf 1000 extension 5, grootfontein into 26 portions and the remainder street of erf 1000, rezoning of portions 1-13 and 24 (of erf 1000), extension 5 grootfontein from 'industrial 1' to 'local business', rezoning of portions 14-23 (of erf 1000), extension 5 grootfontein from 'industrial 1' to 'residential 1', rezoning of portions 25,26, and re/1000 (o

Tuesday, 1 November 2022
SLR Consulting 2022. 221017000128: Proposed three-dimensional (3D) seismic survey in Petroleum Exploration Licence 90 (PEL 90), Orange Basin, off the coast of southern Namibia.

3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.

Monday, 31 October 2022
SLR Consulting 2022. 221017000129: Renewal of Alten Solar Power Hardap (Pty) Ltd Environmental Clearance Certificate.

Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.

Monday, 31 October 2022
SLR Consulting 2022. 221014000087: Proposed meteorological mast and remote sensing campaign for the proposed Hyphen Hydrogen Energy Facility in the Tsau//Khaeb (Spergebiet) National Park, Namibia.

10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.

Wednesday, 22 June 2022
SLR Consulting 2022. APP-003899: ECC renewal application for exploration well drilling in Block 2913B, Orange Basin, Namibia.

TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.

Monday, 6 July 2020
SLR Consulting 2020. APP-001119: Amendment application - exploration well drilling in Petroleum Exploration Licence 39 (PEL 39).

The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.

Thursday, 28 May 2020
SLR Consulting 2020. APP-001407: Environmental Performance Report and EMP.

For Groundwater Abstraction for industrial purposes.

Not found what you are looking for? Amend your search...