These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Kamau Town Planning and Development Specialist have been appointed by the Motor Vehicle Accidents Fund of Namibia (MVA) to undertake an Environmental Impact Assessment for the proposed rezoning of Erf 1370, Keetmanshoop from "General Residential" with a density of 1:100 to "Business Zone 2" with a bulk of 2.00.
The Environmental Clearance Certificate being renewed and amended is for the Layout Approval and Township Establishment on Consolidated Erf 2579, Tsumeb.
In accordance with section 27 of the EMA and section 5 of the EMA regulations, the land use transformation proposed below is listed as part of the activities which may not be undertaken without an Environmental Impact Assessment:subdivision of erf 1000 extension 5, grootfontein into 26 portions and the remainder street of erf 1000, rezoning of portions 1-13 and 24 (of erf 1000), extension 5 grootfontein from 'industrial 1' to 'local business', rezoning of portions 14-23 (of erf 1000), extension 5 grootfontein from 'industrial 1' to 'residential 1', rezoning of portions 25,26, and re/1000 (o
The proposed construction and Operation of a piggery and an abattoir and associated infrastructures for the Evaristus Shikongo Correctional Facility near Tsumeb in the Oshikoto Region. The proposed facilities will be established on the NCS property/premises, i.e. on its Farm where the Evaristus Shikongo Correctional Facility is situated.
Stantoll Properties CC (hereinafter referred to as Stantoll Properties or the Proponent) intends to continue with their sand/gravel mining activities from a sand/gravel bank in the Onanime Village, Okatana Constituency of the Oshana Region. The project has been in operation since October 2015 whereby the sand/gravel has been extracted from a burrow pit with an approximate surface area of 7 hectares (ha).
Shalom Messenger Ministries (hereinafter referred to as the Proponent) proposes to construct and operate a 300m high and 20m x 20m base radio transmission tower in the Omindamba B Village near Ruacana in the Omusati Region. The project Proponent identified the need of radio frequency modulation (FM) and related services in the area, hence the intention to erect the said tower.
This report presents an Environmental Impact Assessment (EIA) for the proposed construction and operation of a fuel service station by Omushona Trading cc (CC/2013/01124) at Okatana area, Oshakati North East, Oshana Region along the Oshakati-Onuno C45 Highway road. The proposed development will result in the establishment of 2 storage tanks of both diesel and petrol connected to a pump for easy filling of vehicles.
Operational phase: The Mining Activities on the Mining Claims No. 68463 to 68472 near Ruacana in the Omusati Region (SLS Crushers or hereinafter referred to as The Proponent) intends to continue with their aggregate mining operations on the currently active part of one of the ten mining claims near Ruacana in the Omusati Region. The mining claims are reported to be covering parts of the Omusati and Kunene Regions with the current mining site/activities located in the Omusati Region part only).