Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 11 of 11
Tuesday, 3 June 2025
Harmonic Town Planning Consultants 2025. 250508005785: The renewal and amendment for the proposed Township Establishment on Erf 3302, Kaisosi Extension 10, Rundu, Kavango East Region. Township to be known as Kaisosi Extension 14.

Following a review by the Ministry of Urban and Regional Planning Board, it was observed that the current Environmental Clearance Certificate (ECC) for Kaisosi Extension 10 does not accurately reflect the nature of the submitted application. During the Board's deliberations, concerns were raised regarding whether the current ECC pertains specifically to the provision of municipal services for Extension 10 or whether it comprehensively covers the township establishment process as intended.

Tuesday, 11 March 2025
Harmonic Town Planning Consultants 2025. 250213005365: Renewal and amendment of the proposed Auasblick Ext. 1 township development, creation and formalisation of streets in Windhoek, Khomas Region.
For the renewal and amendment of the ECC for the proposed Auasblick Ext.1 Township Development and realignment of Jason Hamutenya Ndadi Street, in Windhoek, Homas Region. The renewal is required as the current ECC for the township development of Auasblick Ext. 1 has expired on the 15th of August 2024. The amendment is required to realign and formalise the Jason Hamutenya Ndadi Street. The construction of the township is already completed. Unfortunately, a number of cadastral boundary changes are required to reflect the conditions on the ground.
Monday, 25 November 2024
Harmonic Town Planning Consultants 2024. 241018004827: Proposed rezoning of Erf 159 Block D, Extension 1 Rehoboth.
The listed activity that requires an Environmental Clearance Certificate in terms of Section 5.1(a) of the Regulations in Government Notice No. 30 of 6 February 2012, which reads as follows: Land Use and development activities 5.1. The rezoning of land from: (a) residential use to industrial or commercial use: Erf 159 Block D Extension 1, Rehoboth is to be rezoned from Single Residential with a density of 1:600 to Business with a bulk of 1.0.
Tuesday, 1 November 2022
SLR Consulting 2022. 221017000128: Proposed three-dimensional (3D) seismic survey in Petroleum Exploration Licence 90 (PEL 90), Orange Basin, off the coast of southern Namibia.

3. MINING AND QUARRYING ACTIVITIES 3.2 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining Act), 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources.

Monday, 31 October 2022
SLR Consulting 2022. 221014000087: Proposed meteorological mast and remote sensing campaign for the proposed Hyphen Hydrogen Energy Facility in the Tsau//Khaeb (Spergebiet) National Park, Namibia.

10.1 The construction of: (j) masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmission, but excluding - (i) flag poles, and (ii) lightening conductor poles. In November 2021, the Namibian government issued a notice of award stating its intention to appoint HYPHEN Hydrogen Energy (Hyphen) as the preferred bidder to develop the country’s first large-scale export green hydrogen (H2) project within in two concession areas (namely Springbok and Dolphin) in the Tsau//Khaeb National Park.

Monday, 31 October 2022
SLR Consulting 2022. 221017000129: Renewal of Alten Solar Power Hardap (Pty) Ltd Environmental Clearance Certificate.

Original Application Activities that triggered EIA process (EMA Regulations 2012) Activity 1 (a) Energy Generation, Transmission and Storage The construction of facilities for the generation of electricity. The construction of three 10 MW PV facilities is proposed. Activity 1 (b) Energy Generation, Transmission and Storage The construction of facilities for the transmission and supply of electricity. The construction of PV facilities entails associated infrastructure, including transmission lines and a small onsite substation to connect to existing substations.

Friday, 24 June 2022
Harmonic Town Planning Consultants 2022. APP-003875: Environmental and Social Impact Assessment for the Outapi Flexible Land Tenure Scheme (FLTS): Erf 1499, Outapi Extension 5, Portion 15 of the Farm Outapi Townlands No. 860 and a Portion of Green Field in Outapi Town, Omusati Region - Namibia.

Feasibility Study for the implementation of the Flexible Land Tenure System (FLTS) in Outapi Town of the Omusati Region, Namibia (the proposed project). The Feasibility Study also includes the Environmental Impact Assessment (EIA) Study and development of an Environmental Management Plan (EMP) for the proposed project and to apply for an Environmental Clearance Certificate (ECC).

Wednesday, 22 June 2022
SLR Consulting 2022. APP-003899: ECC renewal application for exploration well drilling in Block 2913B, Orange Basin, Namibia.

TotalEnergies EP Namibia B.V. ("TEEPNA") is applying to renew its ECC to continue with the previously assessed and approved activities, including appraisal well drilling in Block 2913B. TEEPNA and its partners hold an Exploration Right over Block 2913B.

Tuesday, 15 June 2021
Harmonic Town Planning Consultants 2021. APP-002669: The proposed subdivision and development of Erf RE 1-177, Rehoboth - Hardap Region, Namibia.

Subdivision and construction of low-cost housing -Provision of services (sewer, water, electricity).

Monday, 6 July 2020
SLR Consulting 2020. APP-001119: Amendment application - exploration well drilling in Petroleum Exploration Licence 39 (PEL 39).

The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.

Thursday, 28 May 2020
SLR Consulting 2020. APP-001407: Environmental Performance Report and EMP.

For Groundwater Abstraction for industrial purposes.

Not found what you are looking for? Amend your search...