Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 1 - 38 of 38
Thursday, 14 August 2025
Gecko Exploration 2025. 250703006036: Renewal of the Environmental Clearance Certificate (ECC) for prospecting and exploration activities on Exclusive Prospecting Licenses (EPLs) 5992 and 6561, located near Grootfontein in the Otjozondjupa Region.
Prospecting and Exploration Activities on Exclusive Prospecting Licenses (EPLs) 5992 and 6561, Located Near Grootfontein in the Otjozondjupa Region.
Tuesday, 10 June 2025
SLR Environmental Consulting (Namibia) 2025. 240905004659: The proposed abstraction of groundwater from the Kranzberg Aquifer, Erongo Region, Namibia.
8. Water Resource Developments 8.1 The abstraction of ground or surface water for industrial or commercial purposes. 8.2 The abstraction of groundwater at a volume exceeding the threshold authorised in terms of a law relating to water resources.
Tuesday, 3 June 2025
SLR Environmental Consulting (Namibia) 2025. 250407005638: ECC renewal application for exploration and appraisal well drilling in Block 2913B, Orange Basin, Namibia.

ECC Renewal Application: TEEPNA and its Joint Venture (JV) Partners (at present Impact Oil and Gas, NAMCOR and QatarEnergy) hold an Exploration Right over Block 2913B. As part of the process of applying for offshore exploration and appraisal drilling activities in the Block, an Environmental and Social Impact Assessment (ESIA) process was undertaken, which culminated in the Ministry of Environment, Forestry and Tourism (MEFT) issuing an ECC for the proposed activities on 19 September 2019 (MEFT Ref No. ECC-00134).

Tuesday, 13 May 2025
SLR Environmental Consulting (Namibia) 2025. 240828004608: Proposed appraisal well drilling in Petroleum Production License (PPL) 003, Orange Basin, off the coast of southern Namibia.
Primary Listed Activity triggered: 3.0 MINING 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 3.4 The extraction or processing of gas from natural and non-natural resources. CC is for appraisal well drilling within BW Kudu's license area, PPL 003 and all associated activities.
Wednesday, 12 March 2025
Gecko Exploration 2025. 250218005381: Renewal of the Environmental Clearance Certificate (ECC) for mining activities of Barite on Mining Claims 70070, 70071, 70072 and 70073, located in the Epupa Constituency, Kunene Region.
The ECC is for Mining Activities of Barite on Mining Claims 70070, 70071, 70072 and 70073, Located Northwest of Opuwo on the Steilrand Mountains in the Epupa Constituency, Kunene Region.
Wednesday, 25 September 2024
SLR Environmental Consulting (Namibia) 2024. 231110002454: Construction and operation of general and hazardous waste treatment and disposal facility in the Erongo Region.

Namwaste (Pty) Ltd proposes to develop a new general and hazardous waste treatment and disposal facility in the Erongo region (to be known as the Namwaste Management Facility (NMF)), which will address the pressing shortage of solutions for hazardous waste management in the Country and contribute to the protection of the environment whilst also creating employment opportunities and fostering economic growth. The following listed activities in terms of the EIA regulations of 2012 are triggered by the proposed project: 1. Energy Generation, Transmission and Storage Activities 2.

Tuesday, 20 August 2024
SLR Environmental Consulting (Namibia) 2024. 240129002730: Proposed water pipeline from the Kranzberg Boreholes via Karibib to Twin Hills Mine, Erongo Region.

SLR Environmental Consulting Namibia (Pty) Ltd (SLR) was commissioned by Osino to undertake the Environmental Impact Assessment (EIA) for the water pipeline proposed from the Kranzberg boreholes to the Twin Hills Mine in the Erongo Region. The Project triggers listed activities (as outlined below) in terms of the EIA Regulations 2012 promulgated under the Environmental Management Act, No.7 of 2007. An Environmental Clearance Certificate (ECC) is required from the Ministry of Environment, Forestry and Tourism (MEFT).

Friday, 16 August 2024
SLR Environmental Consulting (Namibia) 2024. 240508003558: Halliburton Liquid Mud Treatment and Completion Fluid Plant (LMTP).

Halliburton Industries Limited (Halliburton) is a multinational corporation that provides a range of products and services to the energy industry, specializing in oil and gas exploration, drilling, and production as well as engineering and construction services. Halliburton is proposing to construct and operate a LMTP at Berth 8 in the Port of Walvis Bay within the Namport property.

Tuesday, 30 July 2024
SLR Environmental Consulting (Namibia) 2024. 240228002888: Amendment and renewal of ECC for the Seismic Survey Programme in Licence Block 2912 and 2913B, Orange Basin, Namibia.

TotalEnergies E&P Namibia B.V. ("TEEPNA") is the holder of two Exploration Licences for Blocks 2912 and 2913B. TEEPNA currently holds an Environmental Clearance Certificate and approved Environmental and Social Management Plan (ESMP) for a 3D seismic survey (dated 29 June 2021) over a portion of Blocks 2912 and 2913B. The current ECC provides for the undertaking of a 3D Seismic survey covering an area of Blocks 2912 and 2913B. TEEPNA is now applying to amend its ECC to cover the full extent of Licence Blocks 2912 and 2913B, a total area of 18 170 km².

Monday, 24 June 2024
SLR Environmental Consulting (Namibia) 2024. 240604003949: Proposed exploration well drilling in Licence Block 2914A, Orange Basin, off the coast of southern Namibia.

Rhino Resources Namibia Ltd. (Rhino) is proposing to undertake oil and gas exploration well drilling activities within Block 2914A. The proposed offshore exploration programme includes drilling up to ten wells, some being exploration wells and some being appraisal wells. 2. Waste management, treatment, handling and disposal activities 2.2 Any activity entailing a scheduled process referred to in the Atmospheric Pollution Prevention Ordinance, 1976. There are currently no scheduled activities listed in terms of the Atmospheric Pollution Prevention Ordinance, 1976.

Tuesday, 9 April 2024
SLR Environmental Consulting (Namibia) 2024. 231019002343: Amendment to the existing Environmental Clearance Certificate for Namibia Rare Earths (Pty) LTD ML 200 project.

The current ECC provides for the development of an open pit mine, processing plant, and various mine infrastructure at Farm Lofdal. The Lofdal Mining Project will produce a concentrate consisting mainly of 'rare earths'. The proposed amendments to the Lofdal Mining Project include an increased project footprint due to additional infrastructure and mining areas, improved processing of minerals, and increased Life of Mine (LoM).

Thursday, 7 March 2024
SLR Environmental Consulting (Namibia) 2024. 231017002321: Proposed exploration well drilling in Licence Block 2813B, Orange Basin, off the coast of southern Namibia.
2. Waste management, treatment, handling and disposal activities 2.2 Any activity entailing a scheduled process referred to in the Atmospheric Pollution Prevention Ordinance, 1976. There are currently no scheduled activities listed in terms of the Atmospheric Pollution Prevention Ordinance, 1976. This activity has, however, been included should the incineration of waste be listed in future. 2.3 The import, processing, use and recycling, temporary storage, transit or export of waste. Waste would be generated by the drilling unit and transported to shore by the support vessels. 3.
Thursday, 7 March 2024
SLR Environmental Consulting (Namibia) 2024. 231107002431: Proposed exploration well drilling in Licence Block 2914A, Orange Basin, off the coast of southern Namibia.
2. Waste management, treatment, handling and disposal activities 2.2 Any activity entailing a scheduled process referred to in the Atmospheric Pollution Prevention Ordinance, 1976. There are currently no scheduled activities listed in terms of the Atmospheric Pollution Prevention Ordinance, 1976. This activity has, however, been included should the incineration of waste be listed in future. 2.3 The import, processing, use and recycling, temporary storage, transit or export of waste. Waste would be generated by the drilling unit and transported to shore by the support vessels. 3.
Tuesday, 23 January 2024
SLR Environmental Consulting (Namibia) 2024. 231219002588: Supply Scenario 1 of the Desalination Plant and Water Carriage System to secure Water Supply to the Central Coast, Namibia.

The ECC is for the following: 3. MINING AND QUARRYING ACTIVITIES 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 4. FORESTRY ACTIVITIES 4. The clearance of forest areas, deforestation, afforestation, timber harvesting or any other related activity that requires authorisation in term of the Forest Act, 2001 (Act No. 12 of 2001) or any other law. 7. AGRICULTURE AND AQUACULTURE ACTIVITIES 7.8 The introduction of alien species into local ecosystems. 8.

Tuesday, 23 January 2024
SLR Environmental Consulting (Namibia) 2024. 231221002638: #Gaingu PV power plant and associated infrastructure.

The project proposes the development of a photovoltaic solar installation with a cumulative capacity of 35.10 MWp to supply electricity to the proposed desalination plant near Wlotzkasbaken for the production of desalinated water (through reverse osmosis). The two demand centres (desalination plant and Pump Station 1 (PSS-1)) will be supplied by a combination of solar Photovoltaic (PV), Li-Ion Battery Energy Storage System (BESS) and utility supplied power.

Monday, 6 November 2023
SLR Environmental Consulting (Namibia) 2023. 230428001399: Proposed development of Namdeb Wind (Phase 1) Project and associated infrastructure, ML43 (Southern Coastal Mines), Oranjemund.

Namdeb Diamond Corporation (Pty) Ltd is proposing the development of the following and is legally required to apply for an ECC: 1. Energy generation, transmission and storage facilities: The construction of facilities for the generation of electricity; transmission and supply of electricity. 2. Land use and development activities: The rezoning of land from use for nature conservation or zoned open space to any other land use. 3. Infrastructure: The construction of communication networks including towers, telecommunication and marine telecommunication lines and cables.

Friday, 3 November 2023
SLR Environmental Consulting (Namibia) 2023. 231019002345: Encroacher Bush Biomass Power Project in Namibia - fuel supply activities including harvesting, processing and logistics of encroacher bush or woodchips, Oshikoto Region..

Renewal of Environmental Clearance Certificate for Encroacher Bush Biomass Power Project in Namibia – fuel supply activities including harvesting, processing and logistics of encroacher bush or woodchips, Oshikoto region.

Thursday, 2 November 2023
SLR Environmental Consulting (Namibia) 2023. 231018002334: Construction and operation of the proposed Encroacher Bush Biomass Otjikoto Power Station.

Renewal of Environmental Clearance Certificate (ECC) for Construction and Operation of the proposed Encroacher Bush Biomass Otjikoto Power Station, Oshikoto Region.

Tuesday, 23 May 2023
SLR Environmental Consulting (Namibia) 2023. 230428001408: Amendment and renewal of ECC for the abstraction of groundwater on Farm Cadix, No. 678 Oshikoto Region.

Amendment and Renewal of ECC for the abstraction of groundwater on Farm Cadix, No. 678. from 350 000m3/a to 642 000m3/a Title of Activity: Groundwater abstraction for irrigation. Nature of Activity: Irrigation of vegetables, maize, and fruit trees. Location of Activity: Farm Cadix No. 678, Tsumeb. Located 30 km east of Tsumeb. The farm cultivates maize and vegetables which are sold commercially. From Tsumeb, the farm is accessible via the D3021 district road en route Abenab.

Friday, 28 April 2023
SLR Environmental Consulting (Namibia) 2023. 230130000930: Shell: Ongoing exploration and appraisal well drilling in Petroleum Exploration Licence 389 (PEL39) Karas Region.

Shell currently holds an ECC (APP-001119) for the drilling of up to 5 exploration and/appraisal wells across PEL39. Shell is now applying to drill up to an additional 10 exploration and appraisal wells within the same drill area of interest as authorised 17 August 2020. Shell is thus applying to amend its current ECC to allow for the drilling of additional exploration and appraisal wells, including performing well tests, and amending the timing of the activities to commence in 2023.

Friday, 23 December 2022
SLR Environmental Consulting (Namibia) 2022. 221108000279: Proposed exploration well drilling and related activities in Licence Block 2912, Orange Basin, off the coast of southern Namibia.

TotalEnergies E and P Namibia B.V. ("TEEPNA") currently holds an ECC for 3D seismic surveying across Block 2912 and is now proposing to undertake further oil and gas exploration activities within the block. The proposed activities include the following: Drilling in a focused area within the block, including: - Exploration and/or appraisal wells (up to 10) - Vertical Seismic Profiling (VSP); - Well testing; and - Abandonment of wellheads in the deep offshore. Sonar surveys. Seafloor sampling and coring surveys.

Wednesday, 21 December 2022
SLR Environmental Consulting (Namibia) 2022. 221130000511: Smelter operations and other related activities in Tsumeb, Oshikoto region.

ECC for smelter expansion and optimization project.

Thursday, 15 December 2022
SLR Environmental Consulting (Namibia) 2022. 221129000499: Proposed HDF Energy Renewstable Swakopmund Hydrogen-to-Power Project.

ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES 1. The construction of facilities for - (a) the generation of electricity; (b) the transmission and supply of electricity; LAND USE AND DEVELOPMENT ACTIVITIES 5.1 The rezoning of land from - (a) residential use to industrial or commercial use; (b) light industrial use to heavy industrial use; (c) agricultural use to industrial use; and (d) use for nature conservation or zoned open space to any other land use.

Monday, 23 August 2021
SLR Environmental Consulting (Namibia) 2021. APP-002544: Amendment application: EIA amendment process to the Husab Mine: Proposed heap leach facility and associated infrastructure.

Amendment application: Proposed Changes to the Husab Mine and Linear Infrastructure, Erongo Region (ECC - 00127). EIA amendment process to the Husab Mine: Proposed heap leach facility and associated infrastructure. Swakop Uranium is investigating the feasibility of utilising their low-grade ROM material at the Husab Mine, in order to further extract available uranium through a heap leach process. The low-grade material is regarded as unsuitable and uneconomic for treatment through the current Tank Leach Facility (TLF).

Friday, 26 February 2021
SLR Environmental Consulting (Namibia) 2021. APP-001702: Environmental Impact Assessment process for the proposed development and upgrading of park management infrastructure in the Coastal Parks of Namibia - NamParks V (Springbokwasser).

The Namibia National Parks Programme (NamParks) is a long-established, government development programme executed by the MEFT and co-financed by the Federal Republic of Germany. NamParks V objective is that "Coastal Parks and their support zones are sustainably managed and fair access to their natural resources is ensured thus contributing to biodiversity conservation and improved living conditions of the neighbouring communities". NamParks has been implemented in phases and "NamParks V" is focussed on Namibia’s Coastal Parks.

Friday, 26 February 2021
SLR Environmental Consulting (Namibia) 2021. APP-001704: Environmental Impact Assessment process for the proposed development and upgrading of park management infrastructure in the Coastal Parks of Namibia - NamParks V (Möwe Bay).

The Namibia National Parks Programme (NamParks) is a long-established, government development programme executed by the MEFT and co-financed by the Federal Republic of Germany. NamParks V objective is that "Coastal Parks and their support zones are sustainably managed and fair access to their natural resources is ensured thus contributing to biodiversity conservation and improved living conditions of the neighbouring communities". NamParks has been implemented in phases and "NamParks V" is focussed on Namibia’s Coastal Parks.

Friday, 26 February 2021
SLR Environmental Consulting (Namibia) 2021. APP-001708: Environmental Impact Assessment process for the proposed development and upgrading of park management infrastructure in the Coastal Parks of Namibia – NamParks V (Cape Cross Station).

The Namibia National Parks Programme (NamParks) is a long-established, government development programme executed by the MEFT and co-financed by the Federal Republic of Germany. NamParks V objective is that "Coastal Parks and their support zones are sustainably managed and fair access to their natural resources is ensured thus contributing to biodiversity conservation and improved living conditions of the neighbouring communities". NamParks has been implemented in phases and "NamParks V" is focussed on Namibia’s Coastal Parks.

Friday, 26 February 2021
SLR Environmental Consulting (Namibia) 2021. APP-001710: Environmental Impact Assessment process for the proposed development and upgrading of park management infrastructure in the Coastal Parks of Namibia – NamParks V (Gobabeb Training and Research Centre).

The Namibia National Parks Programme (NamParks) is a long-established, government development programme executed by the MEFT and co-financed by the Federal Republic of Germany. NamParks V objective is that "Coastal Parks and their support zones are sustainably managed and fair access to their natural resources is ensured thus contributing to biodiversity conservation and improved living conditions of the neighbouring communities". NamParks has been implemented in phases and "NamParks V" is focussed on Namibia’s Coastal Parks.

Friday, 26 February 2021
SLR Environmental Consulting (Namibia) 2021. APP-001711: Sesriem: Environmental Impact Assessment process for the proposed development and upgrading of park management infrastructure in the Coastal Parks of Namibia – NamParks V (Sesriem).

The Namibia National Parks Programme (NamParks) is a long-established, government development programme executed by the MEFT and co-financed by the Federal Republic of Germany. NamParks V objective is that "Coastal Parks and their support zones are sustainably managed and fair access to their natural resources is ensured thus contributing to biodiversity conservation and improved living conditions of the neighbouring communities". NamParks has been implemented in phases and "NamParks V" is focussed on Namibia’s Coastal Parks.

Friday, 26 February 2021
SLR Environmental Consulting (Namibia) 2021. APP-001713: Environmental Impact Assessment process for the proposed development and upgrading of park management infrastructure in the Coastal Parks of Namibia - NamParks V (Ugabmund).

The Namibia National Parks Programme (NamParks) is a long-established, government development programme executed by the MEFT and co-financed by the Federal Republic of Germany. NamParks V objective is that “Coastal Parks and their support zones are sustainably managed and fair access to their natural resources is ensured thus contributing to biodiversity conservation and improved living conditions of the neighbouring communities". NamParks has been implemented in phases and "NamParks V” is focussed on Namibia's Coastal Parks.

Monday, 28 December 2020
SLR Environmental Consulting (Namibia) 2020. APP-001500: Encroacher Bush Biomass Project in Namibia - Otjikoto Biomass Power Station.

Encroacher Bush Biomass Power Project: Construction and operation of the 40 MWe Otjikoto Biomass Power Station, near Tsumeb, which includes the transmission substation and transmission lines. Please note: The Scoping phase of the EIA has been completed. The Scoping Report was accepted by MET on 21 May 2018. Also, two separate applications for ECCs were submitted to the two relevant competent authorities, respectively relating to the Biomass Power Project.

Monday, 28 December 2020
SLR Environmental Consulting (Namibia) 2020. APP-001501: Encroacher Bush Biomass Power Project in Namibia - fuel supply activities, including the harvesting, processing and logistics of encroacher bush or wood chips.

Encroacher Bush Biomass Power Project: Related fuel supply activities, including the harvesting, processing and logistics of encroacher bush or wood chips for the Otjikoto Biomass Power Station as main fuel source. Please note: The Scoping phase of the EIA has been completed. The Scoping Report was accepted by MET on 21 May 2018. Also, two separate applications for ECCs were submitted to the two relevant competent authorities, respectively relating to the Biomass Power Project. The other application relates to the Biomass Power Station.

Monday, 28 December 2020
SLR Environmental Consulting (Namibia) 2020. APP-001376: Proposed three-dimensional (3D) seismic survey in Licence Blocks 2912 and 2913B, Orange Basin, off the coast of southern Namibia.

Total E and P Namibia B.V. ("TEPNA") is proposing to undertake a 3D seismic survey to investigate for oil and gas reserves in Licence Blocks 2912 and 2913B.

Thursday, 13 August 2020
SLR Environmental Consulting (Namibia) 2020. APP-001680: Renewal Application: Environmental Clearance Certificate for the amendment to the Arandis Power Thermal Power Generation and Waste Oil Recycling Plant, Erongo Region.

Renewal application: The renewal of Arandis Power’s Environmental Clearance Certificate (ECC) for the Amendment to the Arandis Power Thermal power generation and waste oil recycling plant, Erongo Region (i.e. Renewal Application for: Arandis Power 120MW Heavy Fuel Oil (HFO) power plant and the associated solar photovoltaic power plant).

Wednesday, 12 August 2020
SLR Environmental Consulting (Namibia) 2020. APP-001104: Environmental Performance Report and Management Plan for water abstraction boreholes on Farm Finsterbergen WW 205370 (BH1), WW 205368 (BH2), WW 205369 (BH3), WW 205367 (BH4), and WW 205371 (BH5).

Farm Finsterbergen No. 469 (Farm Finisterbegen) managed by Mr. Siegfried Kuhn is located 30 km north-west of Otavi and 40 km south west of Tsumeb, in the Otjozondjupa Region. The farm was previously owned by Finsterbergen Holdings CC as an irrigation farm and it has since 2017 been bought over by Marabu Trading (PTY) Ltd (Marabu Trading) also for the purposes of conducting an irrigation scheme.

Friday, 31 July 2020
SLR Environmental Consulting (Namibia) 2020. APP-001626: The renewal of the environmental clearance certificate for the telecommunication transmitter mast at the Husab Mine.

Renewal Application: Continue operating the telecommunication transmitter mast (i.e. cell phone tower) to ensure effective communication for Swakop Uranium’s activities at the Husab Mine plant complex. Swakop Uranium required a telecommunication transmitter mast (i.e. cell phone mast) in order to meet communication requirements at their Husab Mine. As part of the original Husab Mine EIA and the EIA Amendment process, a 30 m high cell phone mast was described and assessed for radio and cell-phone communication repeaters to be installed on site near the plant complex.

Friday, 31 July 2020
SLR Environmental Consulting (Namibia) 2020. APP-001625: The renewal of the environmental clearance certificate for the Emulsion Manufacturing Plant at the Husab Mine.

Renewal Application: Continue operating the emulsion manufacturing plant, which stores and then mixes relatively inert chemicals and oils to produce an emulsified product for use in blasting. Swakop Uranium’s emulsion manufacturing plant at the Husab Mine, which stores and then mixes relatively inert chemicals (ammonium nitrate and sodium nitrate) and oils (used diesel and machine oil) to produce an emulsified product for use in blasting. The product from the plant is a non-explosive yellowish paste.

Wednesday, 19 February 2020
SLR Environmental Consulting (Namibia) 2020. APP-0076: Environmental Impact Assessment process for a Mining License application by Gecko Cobalt Mining (Pty) Ltd (Gecko) to mine and process ore in Exclusive Prospecting Licences (EPL) 4346 "Proposed Opuwo Cobalt Project".

Gecko is proposing to apply to the Ministry of Mines and Energy (MME) for a Mining Licence to mine ore (cobalt mineralisation) and process it on site within EPL 4346. The proposed Opuwo Cobalt Project also includes access, water and power supply infrastructure to the mine.