These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
Exploration activities on EPL 7341 for base and rare metals, industrial minerals, precious metals in the Oshikoto and Otjozondjupa Regions. Nature of activity: The proposed project is for the exploration of base and rare metals, industrial minerals and precious metals.
Exploration activities on EPL 7402 for base and rare metals, industrial minerals, precious metals in the Kunene and Otjozondjupa Regions. Nature of activity: The proposed project is for the exploration of base and rare metals, industrial minerals and precious metals.
The environmental clearance certificate is for the proposed agriculture project for farm Erhardshof 575, Otjozondjupa region, Namibia The proposed project will be located on Farm Erhardshof 575, which is approximately 3 522 hectares in size, of which the total irrigated project size at the final phase will be 135 hectares. The intention is to initially plant fodder for cattle such as Katambora Rhodes grass as well as rotational grain crops such as maize and wheat.
Application for the proposed pilot sustainable water supply project by means of desalination, powered by solar to supplement water supply for Walvis Bay Erongo Region. Listed activities triggered by the project include: Energy generation, transmission and storage activities 1. The construction of facilities for - (a) the generation of electricity; (b) the transmission and supply of electricity; Water resource develeopments 8.1 The abstraction of groundwater and surface water industrial or commercial purposes 8.12 The release of brine back into the ocean by desalination plants.
Renewal of environmental clearance certificate - Skorpion zinc for the conversion of the Nam Zinc refinery facility to process zinc sulphide concentrates in addition to zinc oxide ores, in the !Karas Region, Namibia. The project involves processing of Zinc sulphide concentrates in addition to zinc oxide ores. The mine life was extended from 2017 to 2019 due to the availability of additional ore reserves in the pit. As a result of the mine life being extended, the refinery conversion project was deferred at that time.
Exploration activities on EPL 7303 Base and Rare Metals, Industrial Minerals, Precious Metals in the Otjozondjupa Region.
Exploration activities on EPL 7340 Base and Rare Metals, Industrial Minerals, Precious Metals in Otjozondjupa Region.
Renewal application of an Environmental Clearance Certificate for an existing telecommunication tower erected in 2008 in the Khomas region, Namibia. The existing tower is used for radio communication and has been operational for the past twelve years. Listed activity 10.1 (j) is triggered Masts of any material or type and of any height, including those used for telecommunication broadcasting and radio transmissions.
The development of the Olupale Lodge in the Iipumbu Ya Tshilongo Conservancy, Oshana Region, Namibia.
Exploration activities on EPL 7172 Base and Rare Metals, Industrial Minerals, Precious Metals in Oshikoto and Otjozondjupa Regions. Nature of Activity: The proposed project is for the exploration of base and rare metals, industrial minerals, precious metals.
Exploration activities on EPL 7703 Base and Rare Metals, Industrial Minerals, Precious Metals, Semi-Precious Stones in Otjozondjupa Region.
Attachment | Size |
---|---|
1504_ESC_Exploration activities on EPL 7703.pdf | 8.87 MB |
1504_EMP_Exploration activities on EPL 7703.pdf | 950.82 KB |
1504_ECC_Exploration activities on EPL 7703.pdf | 2.1 MB |
1504_Map_Exploration activities on EPL 7703.pdf | 170.93 KB |
Renewal Application for environmental clearance certificate for mining activities for base and rare metals, industrial minerals, and precious metals on mining licence 129,133 and 134 in the Erongo Region, Namibia. The project involves, the following activities: Mining activities, and creation of tracks and access roads.
Exploration activities on EPL 7744 for base and rare metals, industrial minerals and precious metals in the Otjozondjupa Region.
Renewal of the environmental clearance certificate for exploration activities for base and rare metals, industrial minerals and precious metals on EPL 5399, in the Otjozondjupa Regions, Namibia. Nature of Activity: The project involves the exploration for Base and Rare Metals, Industrial Minerals and Precious Metals Scale and Scope of Activity: Exploration activities take place within the boundaries of EPL 5399.
Attachment | Size |
---|---|
1220_Enviromental Compliance Report_EPL 5399 in the Otjozondjupa Regions.pdf | 4.56 MB |
1220_Locality_EPL 5399 in the Otjozondjupa Regions.pdf | 138.28 KB |
1220_ECC_EPL 5399 in the Otjozondjupa Regions.pdf | 87.09 KB |
Proposed construction of a base transceiver station and associated infrastructure for Paratus Telecommunication (Pty) Ltd on a portion of land (Erf 785) adjacent to the Tamariskia cemetery in Swakopmund, Erongo Region, Namibia. Listed activities triggered by the project include: INFRASTRUCTURE 10.1. The construction of: (g) Communication networks including towers, telecommunication, and marine telecommunication lines and cables.
Proposed construction of a base transceiver station and associated infrastructure for Paratus Telecommunication (Pty) Ltd located east of Block 55 (Townlands No.41) in Swakopmund, Erongo Region, Namibia. Listed activities triggered by the project include: INFRASTRUCTURE 10.1. The construction of: (g) Communication networks including towers, telecommunication, and marine telecommunication lines and cables.
Title of Activity: Exploration activities for base and rare metals, industrial minerals and precious metals, in the Otjozondjupa Region, Namibia Nature of Activity: The project involves exploration for base and rare metals, industrial minerals and precious metals. Scale and Scope of Activity: Exploration activities take place within the boundaries of EPL 5402 as illustrated on.
Attachment | Size |
---|---|
1219_Env Compliance Rep_EPL 5402 in the Otjozondjupa Regions.pdf | 9.51 MB |
1219_Locality_EPL 5402 in the Otjozondjupa Regions.pdf | 147.42 KB |
1219_ECC_EPL 5402 in the Otjozondjupa Regions.pdf | 87.09 KB |
Environmental Compliance Consultancy (ECC) has been engaged by Jumbo Charcoal (Pty) Ltd to act on their behalf for the environmental clearance certificate application for the operations of the Jumbo charcoal factory and briquette plant in the Otjozondjupa Region, Namibia. Jumbo Charcoal (Pty) Ltd was established in Okahandja in 1989 and has been operating for over 30 years. As such, the facility predates the promulgation of the Environmental Management Act (EMA), No.7 of 2007.
Environmental Compliance Consultancy (ECC) has been engaged by Otjozundu Namibia (Pty) Ltd, to act on their behalf for the environmental clearance certificate renewal application for the mining activities for base and rare metals on ML 145. ECC has compiled this application in accordance with the Environmental Management Act No. 7 of 2007 on behalf of the proponent.
Renewal application for Environmnetal Clearance Certificate for exploration activities for base and rare metals, on EPL 3456, 3537, 3538, and 3539 in the Otjozondjupa Regions, Namibia. Environmental Compliance Consultancy (ECC) has been engaged by Otjozundu Namibia (Pty) Ltd, to act on their behalf for the environmental clearance certificate renewal application for the mining activities for base and rare metals on EPL 3456, 3537, 3538, and 3539. ECC has compiled this application in accordance with the Environmental Management Act No. 7 of 2007 on behalf of the proponent.
An amendment of the Gondwana Etosha King Nehale Lodge Environmental Management Plan (ENP) to include a hide at the Kameeldoring Water Hole, Etosha National Park, Namibia. Environmental Compliance Consultancy (ECC) has been engaged by Gondwana Collection Namibia (Pty) Ltd the proponent to act on their behalf for the EMP amendment of the environmental clearance certificate application, which was granted and issued 24th April 2019, for the development of the Gondwana Etosha King Nehale Lodge in the Oshikoto Region, Namibia.
Construction of The B2Gold Namibia (Pty) Ltd 66 kV power line in the Otjozondjupa Region, Namibia. Listed activities triggered by the project include: ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES 1. The construction of facilities for (b) The transmission and supply of electricity FORESTRY ACTIVITIES 4. The clearance of forest areas, deforestation, afforestation, timber harvesting or any other related activity that requires authorisation in term of the Forest Act, No. 12 of 2001 or any other law.
Construction Of The B2Gold Namibia (Pty) Ltd, 220 kV Powerline, Otjiwarongo, in the Otjozondjupa Region. Listed activities triggered by the project include: ENERGY GENERATION, TRANSMISSION AND STORAGE ACTIVITIES 1. The construction of facilities for (a) The generation of electricity (b) The transmission and supply of electricity FORESTRY ACTIVITIES 4. The clearance of forest areas, deforestation, afforestation, timber harvesting or any other related activity that requires authorisation in term of the Forest Act No. 12 of 2001 or any other law. LAND USE AND DEVELOPMENT ACTIVITIES 5.1.