Title:

APP-003875: Environmental and Social Impact Assessment for the Outapi Flexible Land Tenure Scheme (FLTS): Erf 1499, Outapi Extension 5, Portion 15 of the Farm Outapi Townlands No. 860 and a Portion of Green Field in Outapi Town, Omusati Region - Namibia

Publication Year:
2022
Abstract:

Feasibility Study for the implementation of the Flexible Land Tenure System (FLTS) in Outapi Town of the Omusati Region, Namibia (the proposed project). The Feasibility Study also includes the Environmental Impact Assessment (EIA) Study and development of an Environmental Management Plan (EMP) for the proposed project and to apply for an Environmental Clearance Certificate (ECC). The FLTS project has triggered the application for an ECC as per the following listed activities: Land use and development activities - 5.1 ( d) the rezoning of land from; zoned open space to any other land use, 8.4 Construction of canals and channels including the diversion of the normal flow of water in a riverbed and water transfer schemes between water catchments and impoundments, and 8.8 Construction and other activities in water courses within flood lines.

Item Type:
Report
Language:
en
Last date for commenting on this EIA: Friday, 24 June 2022

This EIA Report is/was listed currently or previously for Public Comment on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na. You can search the eLibrary for all EIA reports for public comment here, track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.