EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 5751 - 5800 of 6161Click/tap on any title to see full details of the record
Friday, 21 August 2020
NamPower 2020. APP-001726: The operation of the 66KV Omburu-Uis transmission line in Erongo Region.

The ECC is for the operation of 66kV Omburu - Uis transmission line. The 66kV Omburu - Uis line was constructed was constructed in 1974 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 21 August 2020
NamPower 2020. APP-001725: The operation of the 66KV Gobabis-Omaere transmission line in Omaheke Region.

The ECC is for the operation of the 66kV Gobabis - Omaere transmission line. The 66kV Gobabis-Omaere line was constructed from 1992 and was commissioned in 1995 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 21 August 2020
NamPower 2020. APP-001724: The operation of the 66KV Gerus-Welwitchia transmission line in Otjozondjupa and Kunene Regions.

The ECC is for the operation of the 66kV Gerus -Welwitchia transmission line. 66kV Gerus – Welwitchia line was constructed in 1989 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 21 August 2020
Nghivelwa Planning Consultants 2020. APP-001722: Closure of Portion A of Erf 912, Omuthiya Extension 3 as a public open space and subsequent rezoning.

To close a portion of erf 912, Omuthiya Extension 3 as a public open space and subsequent rezoning, subdivision and consolidation to enable the Regional Government to formalise a house already constructed on the property.

Friday, 21 August 2020
Environmental Compliance Consultancy (ECC) 2020. APP-001720: Proposed Otjikoto Agricultural Project on Farm Erhardshof 575, Otjozondjupa Region, Namibia.

The environmental clearance certificate is for the proposed agriculture project for farm Erhardshof 575, Otjozondjupa region, Namibia The proposed project will be located on Farm Erhardshof 575, which is approximately 3 522 hectares in size, of which the total irrigated project size at the final phase will be 135 hectares. The intention is to initially plant fodder for cattle such as Katambora Rhodes grass as well as rotational grain crops such as maize and wheat.

Friday, 21 August 2020
Stubenrauch Planning Consultants 2020. APP-001688: Environmental Assessment for the Subdivision, Permanent Closure, Consolidation and Rezoning of Erf 695, Erf 502 and Erf 683, Nkurenkuru Extension 1.

The environmental clearance certificate is for: Activity 5.1 (d) Infrastructure The rezoning of land from use for nature conservation or zoned open space to any other land use. Activity 10.1 (b) (Infrastructure) The construction of - Public roads. Activity 10.2 (a) (Infrastructure) The route determination of roads and design of associated physical infrastructure where - it is a public road. The Proponent intends to subdivide Erf 502, Nkurenkuru Extension 1 into Erf A and the Remainder.

Friday, 21 August 2020
Erongo Consulting Group 2020. APP-001638: Construction of the Swakopmund Smallholdings potable water reservoir on remainder of Portion 79 of the Swakopmund Town and Townlands 41, Erongo.

The ECC application is for the construction of the proposed Swakopmund Smallholding Potable Water Reservoir, and it will consist of the following main elements: • Supply and installation of a prefabricated water treatment plant including all fittings and accessories: • Construction of a concrete storage tank The reservoir will be a reinforced concrete structure, and will have a round shape with a smooth surface. The round shape of the reservoir will result in the strongest and most cost effective solution.

Wednesday, 19 August 2020
Erongo Consulting Group 2020. APP-001649: Subdivision: Creation of A Public Road (Portions 180 and 181 of Remainder of Portion B of Swakopmund Town and Townlands No.41 into 12 Portions and Remainder), Swakopmund, Erongo Region, Namibia.

The creation of a Public Street / Road on Portions 180 and 181 of Remainder of Portion B of Swakopmund Town and Townlands No. 41, that will givs access to some of the newly created portions. The proposed public street obtains direct access from Tsavorite Street, and Henties Bay Road. The proposed public street is designed to be an 18m. wide cul-de-sac street. The proposed public street is designed to Swakopmund Council, Ministry of Urban and Rural Development and accepted traffic engineering design standards.

Tuesday, 18 August 2020
Erongo Consulting Group 2020. APP-001621: The Proposed Integrated Animal and Crop Farming and Related Infrastructure at Mubiza Village, Katima Mlilo, Namibia.

The EIA Process and the purpose of this EIA study is to identify the direct and indirect impacts that the development - Integration of crop, pasture, and livestock - , will have on the natural resources, eco-system, and the socio-economic dimensions of the neighbouring communities and populations. The integrated farming system is a commonly used term to explain a more integrated approach to farming compared to monoculture approaches.

Tuesday, 18 August 2020
Environmental Compliance Consultancy (ECC) 2020. APP-001426: Pilot sustainable water supply project by means of desalination, powered by solar to supplement water supply for Walvis Bay, Erongo Region, Namibia.

Application for the proposed pilot sustainable water supply project by means of desalination, powered by solar to supplement water supply for Walvis Bay Erongo Region. Listed activities triggered by the project include: Energy generation, transmission and storage activities 1. The construction of facilities for - (a) the generation of electricity; (b) the transmission and supply of electricity; Water resource develeopments 8.1 The abstraction of groundwater and surface water industrial or commercial purposes 8.12 The release of brine back into the ocean by desalination plants.

Monday, 17 August 2020
Risk-Based Solutions (RBS) 2020. APP-001686: Proposed Exploration/Prospecting in the Exclusive Prospecting License (EPL) No. 6667, Opuwo/Ruacana Districts, Kunene/Omusati Regions north-western Namibia.

Application for the transfer of the ECC was granted on the 14th September 2018 to the previous license holder / Proponent, KDN Geo Consulting CC. This ECC need to be transferred to the current license holder / Proponent, Philco One Hundred and Seventy-Three (173) (Pty) Ltd.

Monday, 17 August 2020
Risk-Based Solutions (RBS) 2020. APP-001567: Proposed Mining and Ongoing Exploration Activities in the Mining License (ML) No. 190 Karibib District, Erongo Region, Namibia.

The ECC is required with respect to the proposed dimension stone (marble) mining and ongoing exploration activities in the Mining License (ML) No. 190 Karibib District, Erongo Region. Following the completion of the exploration programme, the company has delineated economic marble resources within the ML No.

Monday, 17 August 2020
Risk-Based Solutions (RBS) 2020. APP-001566: Proposed Mining and Ongoing Exploration Activities in the Mining License (ML) No. 195 Karibib District, Erongo Region, Namibia.

The ECC is required for the proposed dimension stone (marble) mining and ongoing exploration activities in the Mining License (ML) No. 195 Karibib District, Erongo Region. The proposed dimension stone mining project will involve the mining of variable sizes of 5m3 and 7m3 blocks, sorting, storage, transportation to the two (2) plants in Karibib and Walvis Bay for final processing of the dimension stones. The processed dimension stone products will be sold local, regionally and also exported to the various parts of the World such as the USA, China and Europe.

Monday, 17 August 2020
Namibia Water Corporation (NamWater) 2020. APP-001669: Construction of a Short Power supply line Project - Stampriet.

The application is for an Environmental Clearance Certificate for the Construction of a Power Supply line Project, Stampriet, Hardap Region.

Monday, 17 August 2020
Namibia Water Corporation (NamWater) 2020. APP-001671: Construction of a Short Power supply line Project - Maltahohe.

The application is for an Environmental Clearance Certificate for the Construction of a Power Supply line Project, Maltahohe, Hardap Region.

Monday, 17 August 2020
Namibia Water Corporation (NamWater) 2020. APP-001672: Construction of a Short Power supply line Project - Khorixas.

The application is for an Environmental Clearance Certificate for the Construction of a Power Supply line Project, Khorixas, Kunene Region.

Monday, 17 August 2020
Cenored 2020. APP-001685: Construction of the proposed 33 kV overhead power line from Maroelaboom to Mangetti Dune.

Construction of a new 33 kV overhead power line to be constructed along the existing roads (C44 and D3304) from Maroelaboom to Mangetti Dune in Otjozondjupa Region. The new overhead powerline will cover a distance of 125km.

Saturday, 15 August 2020
Outrun Consultants 2020. APP-001557: An Environmental Management Plan for an existing red meat abattoir at Katima Mulilo, Zambezi Region.

The application for an ECC for an existing Meat Abattoir at Katima Mulilo in Zambezi Region.