These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
This is the renewal of the Environment Clearance Certifiate for the EIA and EMP for the Development of Cemetery on Portion Y situated in Rockey Crest, Windhoek District, Khomas Region.
Attachment | Size |
---|---|
1013_EMP_Cemetery on Portion Y situated in Rockey Crest.pdf | 1023.06 KB |
1013_ECC Renewal_Cemetery on Portion Y situated in Rockey Crest.pdf | 643.8 KB |
1013_ECC_Cemetery on Portion Y situated in Rockey Crest.pdf | 831.94 KB |
Environmental Impact Assessment (EIA) for the proposed establishment and operation of a poultry farm and a processing facility at Witvlei, Okarukambe Constituency, Omaheke Region.
Continued operations of the fuel retail facility of Malena Property Investments in Katima Mulilo.
Continuation of fuel bunkering operations within the exclusive economic zone of Namibia and the transfer of the ECC previously issued to Manica Group Namibia (Pty) Ltd to Monjasa Namibia (Pty) Ltd.
Renewal of the environmental clearance certificate for exploration activities for base and rare metals, industrial minerals and precious metals on EPL 5399, in the Otjozondjupa Regions, Namibia. Nature of Activity: The project involves the exploration for Base and Rare Metals, Industrial Minerals and Precious Metals Scale and Scope of Activity: Exploration activities take place within the boundaries of EPL 5399.
Attachment | Size |
---|---|
1220_Enviromental Compliance Report_EPL 5399 in the Otjozondjupa Regions.pdf | 4.56 MB |
1220_Locality_EPL 5399 in the Otjozondjupa Regions.pdf | 138.28 KB |
1220_ECC_EPL 5399 in the Otjozondjupa Regions.pdf | 87.09 KB |
Renewal of the Environmental Clearance Certificate.
To start processing of already harvested Namibian timber into value added products 2. To receive funding from The Development Bank of Namibia.
Title of Activity: Exploration activities for base and rare metals, industrial minerals and precious metals, in the Otjozondjupa Region, Namibia Nature of Activity: The project involves exploration for base and rare metals, industrial minerals and precious metals. Scale and Scope of Activity: Exploration activities take place within the boundaries of EPL 5402 as illustrated on.
Attachment | Size |
---|---|
1219_Env Compliance Rep_EPL 5402 in the Otjozondjupa Regions.pdf | 9.51 MB |
1219_Locality_EPL 5402 in the Otjozondjupa Regions.pdf | 147.42 KB |
1219_ECC_EPL 5402 in the Otjozondjupa Regions.pdf | 87.09 KB |
Proposed construction of a base transceiver station and associated infrastructure for Paratus Telecommunication (Pty) Ltd located east of Block 55 (Townlands No.41) in Swakopmund, Erongo Region, Namibia. Listed activities triggered by the project include: INFRASTRUCTURE 10.1. The construction of: (g) Communication networks including towers, telecommunication, and marine telecommunication lines and cables.
Proposed construction of a base transceiver station and associated infrastructure for Paratus Telecommunication (Pty) Ltd on a portion of land (Erf 785) adjacent to the Tamariskia cemetery in Swakopmund, Erongo Region, Namibia. Listed activities triggered by the project include: INFRASTRUCTURE 10.1. The construction of: (g) Communication networks including towers, telecommunication, and marine telecommunication lines and cables.
Operational phase: The Mining Activities on the Mining Claims No. 68463 to 68472 near Ruacana in the Omusati Region (SLS Crushers or hereinafter referred to as The Proponent) intends to continue with their aggregate mining operations on the currently active part of one of the ten mining claims near Ruacana in the Omusati Region. The mining claims are reported to be covering parts of the Omusati and Kunene Regions with the current mining site/activities located in the Omusati Region part only).
ECC is for the continued operations of the Agri Koës fuel retail facility.
Continued operation of the camp site and establishment of additional camp sites.
Attachment | Size |
---|---|
1191_Map_ Renewal for operation of Livingstones Camp.pdf | 15.58 MB |
1191_EMP_ Renewal for operation of Livingstones Camp.pdf | 1.84 MB |
1191_ECC Renewal for operation of Livingstones Camp.pdf | 577.07 KB |
Mining and Quarrying Activities 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not; 3.3 Resource extraction, manipulation, conservation and related activities.
For the operation of Okapya Substation.
Attachment | Size |
---|---|
1128_EMP_Operation of Okapya Substation_Oshana.pdf | 682.69 KB |
1128_ECC_Operation of Okapya Substation_Oshana.pdf | 620.38 KB |
Uno Investment cc, a Namibian company, intents to establish a charcoal processing plant in Arandis Town. Charcoal being a product that is demanded by the international market, Arandis town is identified to be strategically situated as it is close to Walvis Bay Harbour which the exit to such markets. Establishing the proposed charcoal processing plant triggers a number of activities that are listed under the EMA. Meaning an EIA should be conducted and an ECC obtained accordingly.
Attachment | Size |
---|---|
1118_Advert_Establishment of a charcoal processing plant in Arandis.pdf | 1.68 MB |
1118_Application_Establishment of a charcoal processing plant in Arandis.pdf | 66.42 KB |
ECC is for the continued Operations of the Exclusive Household Trading Enterprises’ Fuel Retail Facility in Oshakati.
Attachment | Size |
---|---|
1014_EIA_Proposed service provision at Goreangab Extension 4_Windhoek.pdf | 2.64 MB |
1014_ECC_Proposed service provision at Goreangab Extension 4_Windhoek.pdf | 359.49 KB |
Continued operations of the Goreangab Waterfront Service Station.
Bukalo Service Centre has been in operation for many years before the EMA Act was promulgated. We are hereby applying for an ECC for the continued operation of the existing Bukalo Service Centre Fuel Retail Facility in order to comply with EMA act.
Attachment | Size |
---|---|
167_EMP_Bukalo Service Centre in Bukalo.pdf | 2.01 MB |
167_Document_Bukalo Service Centre in Bukalo.pdf | 317.47 KB |
The Environmental clearance certificate is for the construction and operation of the Kunene Substation, approximately 30km from Ruacana Power station towards Etoto.
Attachment | Size |
---|---|
1143_EMP_ECC_Kunnene Substation_Omusati.pdf | 571.55 KB |
1143_Map_ECC_Kunnene Substation_Omusati.pdf | 824.28 KB |
Environmental Compliance Consultancy (ECC) has been engaged by Jumbo Charcoal (Pty) Ltd to act on their behalf for the environmental clearance certificate application for the operations of the Jumbo charcoal factory and briquette plant in the Otjozondjupa Region, Namibia. Jumbo Charcoal (Pty) Ltd was established in Okahandja in 1989 and has been operating for over 30 years. As such, the facility predates the promulgation of the Environmental Management Act (EMA), No.7 of 2007.
The application is for the renewal of an existing ECC issued in 2017 for the above mentioned project.
Attachment | Size |
---|---|
1210_EMP_Maltahohe Water Supply Scheme and Maintenance to Infrastructure.pdf | 775.82 KB |
The application is for the renewal of an existing ECC issued in 2016 for the above mentioned project.
Attachment | Size |
---|---|
1209_EMP_Leonardville Water Supply Scheme and Maintenance to Infrastructure.pdf | 862.7 KB |
1209_Location_Leonardville Water Supply Scheme and Maintenance to Infrastructure.pdf | 203.02 KB |
Attachment | Size |
---|---|
1194_ECC Expires_Township extension in Otjiwarongo.pdf | 539.94 KB |
1194_ECC_Township extension in Otjiwarongo.pdf | 742.68 KB |
Attachment | Size |
---|---|
1193_ECC Expired_Cemetery in Otjiwarongo.pdf | 539.94 KB |
1193_ECC_Cemetery in Otjiwarongo.pdf | 735.46 KB |
The proponent intends to establish the proposed Katima Mulilo Extensions 55 and 56 on Erf 2818 Katima Mulilo Extension 10. The townships combined will create 542 erven of which 521 will be Residential erven. The proposed layouts comprise mostly of Residential zoned erven with some General Residential, Institutional, Business, Local Authority, Government, Agriculture and Public Open Space zoned erven additionally provided for.
The ECC is required for exploration activities in the EPL 7269 leading to the preparation of a feasibility report will use techniques such as mapping, drilling, sampling and trenching, starting with the desktop studies, followed by regional and local field-based activities.
Mining and Quarrying Activities 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not; 3.3 Resource extraction, manipulation, conservation and related activities; Water Resource Developments 8.1 The abstraction of ground or surface water for industrial or commercial purposes; 8.8 Construction and other activities in water courses within flood lines.
To apply for Environmental Clearance Certificate for the establishment, mining and crushing of aggregate stones at Ocikokola Village in Ruacana Constituency.
Renewal of Previous Environmental Clearance Certificate.
The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.
ECC is for Oyster an Scallop mariculture activities
ECC is for irrigation and establishment and operations of guest accommodation and related hospitality infrastructure on Farm Campbellsdrei.
The application is for the renewal of an existing ECC issued in 2017 for the above mentioned project.
Attachment | Size |
---|---|
1211_ECC_Onderombapa Water Supply Scheme and Maintenance to Infrastructure.pdf | 108.84 KB |
1211_EMP_Onderombapa Water Supply Scheme and Maintenance to Infrastructure.pdf | 792.19 KB |
The application is for the renewal of an existing ECC issued in 2016 for the above mentioned project..
Attachment | Size |
---|---|
1208_EMP_Kwakwas Water Supply Scheme and Maintenance to Infrastructure.pdf | 760.4 KB |
1208_ECC_Kwakwas Water Supply Scheme and Maintenance to Infrastructure.pdf | 109.14 KB |
The application is for the renewal of an existing ECC issued in 2016 for the above mentioned project.
Attachment | Size |
---|---|
1207_EMP_Kriess Water Supply Scheme and Maintenance to Infrastructure.pdf | 763.02 KB |
1207_ECC_Kriess Water Supply Scheme and Maintenance to Infrastructure.pdf | 109.21 KB |
The application is for the renewal of an existing ECC issued in 2016 for the above mentioned project.
Attachment | Size |
---|---|
1206_EMP_Aranos Water Supply Scheme and Maintenance to Infrastructure.pdf | 901.82 KB |
1206_ECC_Aranos Water Supply Scheme and Maintenance to Infrastructure.pdf | 550.21 KB |
It is the intension of the proponent to permanently close Portion X of Portion 82 of the Remainder of the Farm Hentiesbaai Town and Townlands No. 133 as a Public Open Space and rezone Portion X of Portion 82 of the Remainder of the Farm Hentiesbaai Town and Townlands No. 133 from “Public Open Space” to “General Residential 2” to accommodate the formalization and development of the Golf Lodge. In order to permanently close Portion X, Portion 82 of the Remainder of the Farm Hentiesbaai Town and Townlands No. 133 will be subdivided into Portion X and Remainder.
The application is for a renewal of an existing ECC issued for the above mentioned project issued in 2016.
The existing Environmental Clearance Certificate is expiring on 30 May 2020, therefore the application for renewal.
Attachment | Size |
---|---|
1197_Location_Sea Bird Guano_Mining License ML 83.pdf | 225.9 KB |
1197_EMP_Sea Bird Guano_Mining License ML 83.pdf | 533.08 KB |
1197_ECC_Sea Bird Guano_Mining License ML 83.pdf | 400.4 KB |
Desert Lion Energy (DLE) (Pty) Ltd is applying for the for the renewal and transfer of Environmental Clearance Certificate (ECC) from !HUNI-/URIB Investments (Pty) Ltd to Desert Lion Energy (DLE) (Pty) Ltd with respect to the following exploration activities in the EPL 5439: (i) Initial desktop exploration activities (no field-work undertaken); (ii) Regional reconnaissance field-based mapping and sampling activities (Subject to the positive results of (i); (iii) Initial local field-based mapping and sampling activities (Subject to the positive results of (i) and (ii) above), (iv) Detailed l
Mining Activities for Semi Precious Stones.
Attachment | Size |
---|---|
976_Mining Claim NO 70264_70267 and 71520_71523.pdf | 5.75 MB |
The following activities are triggered by the Project: 3.1 The construction of facilities for any process or activities which requires a licence, right or other form of authorisation, and the renewal of a licence, right or other form of authorisation, in terms of the Minerals (Prospecting and Mining) Act, 1992. 3.2 Other forms of mining or extraction of any natural resources whether regulated by law or not. 3.3 Resource extraction, manipulation, conservation and related activities. 2.
Attachment | Size |
---|---|
1181_EMP_proposed quarry activities for base materials at Oranjemund Town.pdf | 1.76 MB |
1181_ECC_proposed quarry activities for base materials at Oranjemund Town.pdf | 2.9 MB |
The purpose of this application of the Environmental Clearance certificate for rezoning Atta Rental Portion 503 from residential area to restricted business of bulk 0.4. Such application includes the following activities 1. Re-zoning from residential to restricted business (Bulk 0.4) a) Mechanical work and handling of heavy and light vehicles. b) Charcoal storage & packaging c) Hydraulic engineering workshop 2. Construction of new access road (800m) 3. Refurbishment of septic tanks 4. Operation of workshop facility.
Attachment | Size |
---|---|
1187_EMP_Atta Rentals new portion 503.pdf | 1.68 MB |
1187_Supporting Doc_Atta Rentals new portion 503.pdf | 3.93 MB |
The Environmental Clearance Certificate Renewal is for: Activity 8.9 Water resource developments namely, Construction of – Oil, water, gas and petrochemical and other bulk supply pipelines. Activity 10.1 (a) (Infrastructure) namely, the construction of - Public roads.
Renewal application for Environmnetal Clearance Certificate for exploration activities for base and rare metals, on EPL 3456, 3537, 3538, and 3539 in the Otjozondjupa Regions, Namibia. Environmental Compliance Consultancy (ECC) has been engaged by Otjozundu Namibia (Pty) Ltd, to act on their behalf for the environmental clearance certificate renewal application for the mining activities for base and rare metals on EPL 3456, 3537, 3538, and 3539. ECC has compiled this application in accordance with the Environmental Management Act No. 7 of 2007 on behalf of the proponent.
Environmental Compliance Consultancy (ECC) has been engaged by Otjozundu Namibia (Pty) Ltd, to act on their behalf for the environmental clearance certificate renewal application for the mining activities for base and rare metals on ML 145. ECC has compiled this application in accordance with the Environmental Management Act No. 7 of 2007 on behalf of the proponent.