Search results custom

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 5501 - 5550 of 5745Click/tap on any title to see full details of the record
Monday, 6 July 2020
NamPower 2020. APP-001312: The operation of the 66KV Bismark-Rehoboth Transmission Line in Khomas and Hardap Regions.

The ECC is for the operation of the 66kV Bismark - Rehoboth transmission line. Bismark – Rehoboth 66kV powerline runs from Bismarck substation in Khomas Region to Rehoboth Substation station Hardap Region. This powerline was constructed in 1980. Under the Environmental Management Act (Act 7 of 2007) and the Environmental Impact Assessment Regulations (2012), the activity described as "The construction of facilities for the transmission and supply of electricity…" requires an Environmental Clearance Certificate.

Monday, 6 July 2020
NamPower 2020. APP-001311: The operation of the 220KV van Eck-Kuiseb Transmission Line in Khomas and Erongo Region.

The ECC is for the operation of the 220 kV Van Eck - Kuiseb transmission line. Van Eck - Kuiseb 220kV powerline runs from Van Eck substation in Khomas Region to Kuiseb Substation station Erongo Region. This powerline was constructed in 2012. Under the Environmental Management Act (Act 7 of 2007) and the Environmental Impact Assessment Regulations (2012), the activity described as “The construction of facilities for the transmission and supply of electricity…" requires an Environmental Clearance Certificate. Section 57.

Monday, 6 July 2020
NamPower 2020. APP-001309: The operation of the 220KV van Eck-Auas transmission Line 1, 2, and 3 in Khomas Region.

The ECC is for the operation of the 220 kV Van Eck - Auas transmission line 1, 2 and 3. The 220kV Van Eck – Auas transmission line 3 was constructed in 2000 - 2001, and line 1 and 2 were constructed in 1982. These lines are 33.7 km in lengths. They run close to one another from Van Eck substation to Auas substation. Line 1 and 2 are sitting on one structure.

Monday, 6 July 2020
NamPower 2020. APP-001308: The operation of the 66KV Rehoboth-Klein Aub Transmission Line in Hardap Region.

The ECC is for the operation of the 66 kV Rehoboth - Klein Aub transmission line in Hardap Region. The 66kV Rehoboth – Klein Aub transmission line is 103km in length and was constructed in 1980. This powerline runs from Rehoboth substation to Klein Aub Substation station. Under the Environmental Management Act (Act 7 of 2007) and the Environmental Impact Assessment Regulations (2012), the activity described as "The construction of facilities for the transmission and supply of electricity…" requires an Environmental Clearance Certificate.

Monday, 6 July 2020
NamPower 2020. APP-001307: The operation of the 66KV Finke-Otjihase Transmission Line in Khomas Region.

The ECC is for the operation of the 66kV Finke - Otjihase transmission line in Kohomas Region. Finke – Otjihase 66kV powerline runs from Finke substation to Otjihase substation in Khomas Region. This powerline was constructed in 1980. Under the Environmental Management Act (Act 7 of 2007) and the Environmental Impact Assessment Regulations (2012), the activity described as "The construction of facilities for the transmission and supply of electricity…" requires an Environmental Clearance Certificate.

Monday, 6 July 2020
NamPower 2020. APP-001306: The operation of the 66kV Finke_Bismark transmission line in Khomas region.

Finke – Bismark 66kV powerline runs from Finke substation to Bismarck substation in Khomas Region. This powerline was constructed in 2012. Under the Environmental Management Act (Act 7 of 2007) and the Environmental Impact Assessment Regulations (2012), the activity described as "The construction of facilities for the transmission and supply of electricity…" requires an Environmental Clearance Certificate. Section 57.

Monday, 6 July 2020
NamPower 2020. APP-001223: Application for the renewal Environmental Clearance Certificate for the operation of Omburu Substation, Erongo Region.

The environmental Clearance certificate is for the Operation of the Omburu Substation, the Substation is located approximately 12km from Omaruru.

Monday, 6 July 2020
SLR Consulting 2020. APP-001119: Amendment application - exploration well drilling in Petroleum Exploration Licence 39 (PEL 39).

The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.

Thursday, 2 July 2020
Environmental Compliance Consultancy (ECC) 2020. APP-001504: Exploration activities on EPL 7703 Base and Rare Metals, Industrial Minerals, Precious Metals, Semi-Precious Stones in Otjozondjupa Region.

Exploration activities on EPL 7703 Base and Rare Metals, Industrial Minerals, Precious Metals, Semi-Precious Stones in Otjozondjupa Region.

Thursday, 2 July 2020
Namibia Water Corporation (NamWater) 2020. APP-001514: Continuation of the Dordabis Water supply scheme and maintenance of associated infrastructure.

The application is for the renewal of an existing Dordabis Water Supply Scheme ECC, issued on the 8th of June 2017 for the above-mentioned project.

Wednesday, 1 July 2020
NamPower 2020. APP-001508: The operation of 66KV Rundu - Mahango Transmission Line.

The ECC is for the operation of the 66kV Rundu - Mahongo transmission line. This powerline was constructed in 2007. There was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Management Act (Act 7 of 2007) and its regulations.

Wednesday, 1 July 2020
APP-001506: The operation of 66KV Gerus - Otjiwarongo Transmission Line.

The ECC is for the Operation of the 66kV Gerus - Otjiwarongo transmission line. This powerline was constructed in 1990 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Management Act (Act 7 of 2007) and its regulations.

Wednesday, 1 July 2020
NamPower 2020. APP-001507: The operation of 132KV Zambezi - Katima Transmission Line.

The ECC is for the operation of the 132kV Zambezi - Katima transmission line. There was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Management Act (Act 7 of 2007) and its regulations.

Wednesday, 1 July 2020
NamPower 2020. APP-001505: The operation of 66KV Gerus - Ombika Transmission Line.

The ECC is for the Operation of the 66kV Gerus - Ombika transmission line. This transmission line was constructed in 1986 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Management Act (Act 7 of 2007) and its regulations.

Thursday, 25 June 2020
Urban Green 2020. APP-001484: Application for the renewal of an Environmental Clearance Certificate for the proposed industrial township and associated infrastructure, on the remainder of Portion 137, of the Farm Brakwater No. 48, Windhoek, Khomas Region.

The Renewal of the Environmental Clearance Certificate is for: Activity 5.1 (a) Land Use and Development Activities. The Rezoning of Land from Residential use to industrial or commercial use. 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1 Title of Activity Proposed Industrial Township Development and Associated Infrastructure, on the remainder of Portion 137, of Farm Brakwater No. 48, Windhoek (Khomas Region). 2.2 Location of Activity The Portion Remainder 137 of the Farm Brakwater No.

Thursday, 25 June 2020
EnviroSolutions 2020. APP-001483: Application for the renewal of an Environmental Clearance Certificate for the mining activities on Mining Licence (ML142), Karibib District, Erongo Region.

The Renewal of the Environmental Clearance Certificate is for: Continuation of an existing mining activity, for which an Environmental Clearance was obtained during June 2017, which requires authorisation in terms of the Minerals (Prospecting and Mining) Act (No. 33 of 1992). 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1 Title of the Activity: Continuation of the mining for mineral dimension stone (i.e. marble and granite) on ML 142 hold by Namibia Marble and Granite (PTY) Ltd. (NAMAGRA).

Thursday, 25 June 2020
Geo Pollution Technologies 2020. APP-001432: Renewal of the ECC for the Lüderitz Speed Challenge hosted by Surf'n'Curve.

Renewal of the existing ECC is required for the continuation of the annual speed sailing event held at Lüderitz's Second Lagoon in October/November. This include preparation and maintenance work on the trench in the months prior to the event.

Thursday, 25 June 2020
Erongo Consulting Group 2020. APP-001428: Environmental Impact Assesment of the proposed township establishment of Portion A of Farm Volmoed No. 1000, located 75km south-east of Windhoek, Namibia.

This BID serves as motivation for a consent application to subdivide a portion of Farm Volmoed, located 75km South-East of Windhoek. The farm falls under the Rehoboth Council area of jurisdiction. Approval is sought for the subdivision of 78.990Ha from 1263.424Ha into portion A and remainder. The purpose of the subdivision is to transfer the 78.990Ha to 31 beneficiaries, in the form of plot sizes varying between 1.3 and 5 hectares, who commit to undertaking agricultural operations.

Thursday, 25 June 2020
Matrix Consulting Services 2020. APP-001413: Proposed upgrade and continued operation of the existing  FP du Toit Transport Consumer Fuel Facility in the Lafrenz Industrial Area of Windhoek.

FP Du Toit Consumer Fuel Facility has been in operation for over 10 years now. ECC application is for proposed upgrade activities and continued operations of the existing fuel facility. In order to comply with the requirements of the Environmental Management Act (No. 7 of 2007), and its regulations of 2012.

Thursday, 25 June 2020
NamPower 2020. APP-001310: The operation of the 66KV van Eck - Finke Transmission Line in Khomas Region.

The ECC is for the operation of the 66kV Van Eck Finke Tansmission line in Khomas region. Van Eck - Finke 66kV powerline runs from Van Eck substation to Finke Substation station Khomas Region. This powerline was constructed in 2012. It enables the supply of electricity to residents of Finkestein Estate. Under the Environmental Management Act (Act 7 of 2007) and the Environmental Impact Assessment Regulations (2012), the activity described as "The construction of facilities for the transmission and supply of electricity…" requires an Environmental Clearance Certificate. Section 57.

Thursday, 25 June 2020
Geo Pollution Technologies 2020. APP-001183: Environmental Scoping Assessment and Environmental Management Plan for Tetelestai Mariculture's Proposed Development at Lüderitz.

ECC is for mariculture of Pacific oyster (Crassostrea gigas) and Peruvian scallop (Argopecten purpuratus) in the dedicated mariculture area at Lüderitz.

Thursday, 25 June 2020
Geo Pollution Technologies 2020. APP-001086: Portion 20 of consolidated farm Tsumore No. 761, Oshikoto Region: Environmental Assessment Scoping Report.

Irrigation Based Activities on Portion 20 of consolidated farm Tsumore No. 761, Oshikoto Region: E

Sunday, 14 June 2020
Nam Geo-Enviro Solutions (NGS) 2020. APP-001427: Environmental Impact Assessment for the operation of an existing Sesriem fuel station at Sesriem ,Sousssvlei, Hardap Region.

Environmental Impact Assessment for the operation of an existing Sesriem fuel station at Sesriem, Sousssvlei, Hardap Region. The fuel station has been operating without an EMP on place, therefore Enercon Namibia (Pty) Ltd intends to regularize the operation of the existing fuel station according to the Environmental Management Act (2007) and its Regulations (2012). The site constitutes of three (3) underground fuel tanks (Diesel (2) and Petrol 1) each with the capacity of 23000L to cater for the vehicles in the Namibia Wildlife Resort in Sesriem.

Wednesday, 10 June 2020
Namibia Water Corporation (NamWater) 2020. APP-001451: Continuation of the Buitepos Water supply scheme and maintenance of associated infrastructure.

The application is for the renewal of an existing Buitepos Water Supply ECC, issued on the 29th of May 2017 for the above-mentioned project.

Wednesday, 10 June 2020
Namibia Water Corporation (NamWater) 2020. APP-001450: Continuation of the Karstland Water supply scheme and maintenance of associated infrastructure.

The application is for the renewal of an existing Karstland Water Supply ECC, issued on the 29th of May 2017 for the above-mentioned project.

Wednesday, 10 June 2020
Namibia Water Corporation (NamWater) 2020. APP-001442: Continuation of the Stampriet Water supply scheme and maintenance of associated infrastructure.

The application is for the renewal of an existing Stampriet Water Supply ECC, issued 19 April 2017 for the above-mentioned project.

Wednesday, 10 June 2020
Namibia Water Corporation (NamWater) 2020. APP-001447: Continuation of the Rehoboth-Oanob Dam Water supply scheme and maintenance of associated infrastructure.

The application is for the renewal of an existing Rehoboth-Oanob Dam Water supply scheme ECC issued on the 19th of April 2017, for the above-mentioned project.

Wednesday, 10 June 2020
Namibia Water Corporation (NamWater) 2020. APP-001448: Continuation of the Baumsgartsbrunn Water supply scheme and maintenance of associated infrastructure.

The application is for the renewal of an existing Baumsgartsbrunn Water Supply ECC, issued on the 29th of May 2017, for the above-mentioned project.

Wednesday, 10 June 2020
Namibia Water Corporation (NamWater) 2020. APP-001446: Continuation of the Omatako Dam - Von Bach Water Pipeline scheme and maintenance of associated infrastructure.

The application is for the renewal of an existing Omatako Dam - Von Bach Water Pipeline ECC, issued on the 29th of May 2017, for the above-mentioned Scheme.

Wednesday, 10 June 2020
Namibia Water Corporation (NamWater) 2020. APP-001449: Continuation of the Schlip Water supply scheme and maintenance of associated infrastructure.

The application is for the renewal of an existing Schlip Water Supply ECC, issued on the 19th of April 2017 for the above-mentioned project.

Tuesday, 9 June 2020
Mafuta Environmental Consultants 2020. APP-001382: Environmental Assessment (EA) for the Proposed Construction and Operation of a Radio Transmission Tower in the Omindamba B Village of the Ruacana Constituency, Omusati Region.

Shalom Messenger Ministries (hereinafter referred to as the Proponent) proposes to construct and operate a 300m high and 20m x 20m base radio transmission tower in the Omindamba B Village near Ruacana in the Omusati Region. The project Proponent identified the need of radio frequency modulation (FM) and related services in the area, hence the intention to erect the said tower.