These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The proponent intends to mine dimension stones on the mining claim 71620 at Farm Kompaneno 104, Omaruru Constituency, Erongo Region, located about 23 km off the C36 road onto the D2344 road from Omaruru to Omatjete.
The ECC is for the operation of the 66kV Bismark - Rehoboth transmission line. Bismark – Rehoboth 66kV powerline runs from Bismarck substation in Khomas Region to Rehoboth Substation station Hardap Region. This powerline was constructed in 1980. Under the Environmental Management Act (Act 7 of 2007) and the Environmental Impact Assessment Regulations (2012), the activity described as "The construction of facilities for the transmission and supply of electricity…" requires an Environmental Clearance Certificate.
The ECC is for the operation of the 220 kV Van Eck - Kuiseb transmission line. Van Eck - Kuiseb 220kV powerline runs from Van Eck substation in Khomas Region to Kuiseb Substation station Erongo Region. This powerline was constructed in 2012. Under the Environmental Management Act (Act 7 of 2007) and the Environmental Impact Assessment Regulations (2012), the activity described as “The construction of facilities for the transmission and supply of electricity…" requires an Environmental Clearance Certificate. Section 57.
The ECC is for the operation of the 220 kV Van Eck - Auas transmission line 1, 2 and 3. The 220kV Van Eck – Auas transmission line 3 was constructed in 2000 - 2001, and line 1 and 2 were constructed in 1982. These lines are 33.7 km in lengths. They run close to one another from Van Eck substation to Auas substation. Line 1 and 2 are sitting on one structure.
The ECC is for the operation of the 66 kV Rehoboth - Klein Aub transmission line in Hardap Region. The 66kV Rehoboth – Klein Aub transmission line is 103km in length and was constructed in 1980. This powerline runs from Rehoboth substation to Klein Aub Substation station. Under the Environmental Management Act (Act 7 of 2007) and the Environmental Impact Assessment Regulations (2012), the activity described as "The construction of facilities for the transmission and supply of electricity…" requires an Environmental Clearance Certificate.
The ECC is for the operation of the 66kV Finke - Otjihase transmission line in Kohomas Region. Finke – Otjihase 66kV powerline runs from Finke substation to Otjihase substation in Khomas Region. This powerline was constructed in 1980. Under the Environmental Management Act (Act 7 of 2007) and the Environmental Impact Assessment Regulations (2012), the activity described as "The construction of facilities for the transmission and supply of electricity…" requires an Environmental Clearance Certificate.
Finke – Bismark 66kV powerline runs from Finke substation to Bismarck substation in Khomas Region. This powerline was constructed in 2012. Under the Environmental Management Act (Act 7 of 2007) and the Environmental Impact Assessment Regulations (2012), the activity described as "The construction of facilities for the transmission and supply of electricity…" requires an Environmental Clearance Certificate. Section 57.
The environmental Clearance certificate is for the Operation of the Omburu Substation, the Substation is located approximately 12km from Omaruru.
Attachment | Size |
---|---|
1223_ECC_For the operation of Omburu Substation.pdf | 365.49 KB |
1223_EMP_For the operation of Omburu Substation.pdf | 544.58 KB |
1223_Map_For the operation of Omburu Substation.pdf | 1.07 MB |
The proposed amendments to the ECC (16 May 2018) and specifically to the Project Description in the EIA Report (SLR, 2017) covers the following items: Geographical Area; Number of Exploration Wells; Timing; and ECC Validity Period.
Attachment | Size |
---|---|
1119_ECC_Exploration well drilling in Petroleum Exploration Licence 39.pdf | 560 KB |
1119_Application_Exploration well drilling in Petroleum Exploration Licence 39.pdf | 5.05 MB |
Exploration activities on EPL 7703 Base and Rare Metals, Industrial Minerals, Precious Metals, Semi-Precious Stones in Otjozondjupa Region.
Attachment | Size |
---|---|
1504_ESC_Exploration activities on EPL 7703.pdf | 8.87 MB |
1504_EMP_Exploration activities on EPL 7703.pdf | 950.82 KB |
1504_ECC_Exploration activities on EPL 7703.pdf | 2.1 MB |
1504_Map_Exploration activities on EPL 7703.pdf | 170.93 KB |
The application is for the renewal of an existing Dordabis Water Supply Scheme ECC, issued on the 8th of June 2017 for the above-mentioned project.
The ECC is for the operation of the 66kV Rundu - Mahongo transmission line. This powerline was constructed in 2007. There was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Management Act (Act 7 of 2007) and its regulations.
Attachment | Size |
---|---|
1508_EMP_The operation of 66KV Rundu_Mahango Transmission Line.pdf | 866.43 KB |
1508_Map_The operation of 66KV Rundu_Mahango Transmission Line.pdf | 248.41 KB |
The ECC is for the Operation of the 66kV Gerus - Otjiwarongo transmission line. This powerline was constructed in 1990 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Management Act (Act 7 of 2007) and its regulations.
The ECC is for the operation of the 132kV Zambezi - Katima transmission line. There was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Management Act (Act 7 of 2007) and its regulations.
Attachment | Size |
---|---|
1507_EMP_The operation of 132KV Zambezi_Katima Transmission Line.pdf | 912.43 KB |
1507_Map_The operation of 132KV Zambezi_Katima Transmission Line.pdf | 254.43 KB |
The ECC is for the Operation of the 66kV Gerus - Ombika transmission line. This transmission line was constructed in 1986 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Management Act (Act 7 of 2007) and its regulations.
Attachment | Size |
---|---|
1505_EMP_The operation of 66KV Gerus_Ombika Transmission Line.pdf | 899.53 KB |
1505_Map_The operation of 66KV Gerus_Ombika Transmission Line.pdf | 325.49 KB |
Mining of Sodalite.
Attachment | Size |
---|---|
1489_Pro_forma Environmental Contract_ Mining activities on mining claim no 71184_71185 Opuwo.pdf | 1.41 MB |
Mining of semi-precious stones.
Attachment | Size |
---|---|
1491_Pro_Forma Environmental Contract_Mining activities on Mining Claim No71721_71730 Karibib.pdf | 4.63 MB |
Mining of semi-precious stones.
Attachment | Size |
---|---|
1490_Pro_forma Environmental Contract_Mining activities on Mining Claim No 71649_71656_Karibib.pdf | 4.42 MB |
Mining of semi-precious stones.
Attachment | Size |
---|---|
1486_Pro_forma Environmental Contract_ Mining activities on Mining Claim No 71692_71701_Usakos.pdf | 2.25 MB |
Mining of semi-precious stones.
Attachment | Size |
---|---|
1485_Pro_forma Environmental Contract_Mining activities on Mining Claim 71739_71748 at Farm Habis 71_Karibib.pdf | 2.58 MB |
The Renewal of the Environmental Clearance Certificate is for: Activity 5.1 (a) Land Use and Development Activities. The Rezoning of Land from Residential use to industrial or commercial use. 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1 Title of Activity Proposed Industrial Township Development and Associated Infrastructure, on the remainder of Portion 137, of Farm Brakwater No. 48, Windhoek (Khomas Region). 2.2 Location of Activity The Portion Remainder 137 of the Farm Brakwater No.
Attachment | Size |
---|---|
1484_ECC_Portion 137 of the Farm Brakwater No 48.pdf | 773.7 KB |
1484_Map_Portion 137 of the Farm Brakwater No 48.pdf | 1.69 MB |
1484_Locality_Portion 137 of the Farm Brakwater No 48.pdf | 513.04 KB |
The Renewal of the Environmental Clearance Certificate is for: Continuation of an existing mining activity, for which an Environmental Clearance was obtained during June 2017, which requires authorisation in terms of the Minerals (Prospecting and Mining) Act (No. 33 of 1992). 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1 Title of the Activity: Continuation of the mining for mineral dimension stone (i.e. marble and granite) on ML 142 hold by Namibia Marble and Granite (PTY) Ltd. (NAMAGRA).
Attachment | Size |
---|---|
1483_ECC_Mining Licence ML142 Karibib District.pdf | 372.04 KB |
1483_EIA_Mining Licence ML142 Karibib District.pdf | 2.41 MB |
1483_Scoping Report_Mining Licence ML142 Karibib District.pdf | 212.07 KB |
Renewal of the Environmental Clearance Certificate for the Environmental Management Plan for the Sossusvlei Desert Lodge, Farm Vreemdelingspoort No. 141, Maltahöhe District, Hardap Region, Namibia.
Renewal of the existing ECC is required for the continuation of the annual speed sailing event held at Lüderitz's Second Lagoon in October/November. This include preparation and maintenance work on the trench in the months prior to the event.
This BID serves as motivation for a consent application to subdivide a portion of Farm Volmoed, located 75km South-East of Windhoek. The farm falls under the Rehoboth Council area of jurisdiction. Approval is sought for the subdivision of 78.990Ha from 1263.424Ha into portion A and remainder. The purpose of the subdivision is to transfer the 78.990Ha to 31 beneficiaries, in the form of plot sizes varying between 1.3 and 5 hectares, who commit to undertaking agricultural operations.
FP Du Toit Consumer Fuel Facility has been in operation for over 10 years now. ECC application is for proposed upgrade activities and continued operations of the existing fuel facility. In order to comply with the requirements of the Environmental Management Act (No. 7 of 2007), and its regulations of 2012.
The ECC is for the operation of the 66kV Van Eck Finke Tansmission line in Khomas region. Van Eck - Finke 66kV powerline runs from Van Eck substation to Finke Substation station Khomas Region. This powerline was constructed in 2012. It enables the supply of electricity to residents of Finkestein Estate. Under the Environmental Management Act (Act 7 of 2007) and the Environmental Impact Assessment Regulations (2012), the activity described as "The construction of facilities for the transmission and supply of electricity…" requires an Environmental Clearance Certificate. Section 57.
ECC is for mariculture of Pacific oyster (Crassostrea gigas) and Peruvian scallop (Argopecten purpuratus) in the dedicated mariculture area at Lüderitz.
Attachment | Size |
---|---|
1183_EIA_Tetelestai Maricultures Proposed Development at Luderitz.pdf | 6.04 MB |
1183_Note_Tetelestai Maricultures Proposed Development at Luderitz.pdf | 221.01 KB |
Irrigation Based Activities on Portion 20 of consolidated farm Tsumore No. 761, Oshikoto Region: E
Attachment | Size |
---|---|
1086_EASR_Portion 20 of consolidated farm Tsumore No 761 Oshikoto Region.pdf | 16.5 MB |
The reason for the appliaction is to get ECC for the establishment of a Maize Milling Plant to add value to the Maize already being produced on Farm Irvington No. 744.
Construction of a school.
Attachment | Size |
---|---|
1459_Screening Questionnaire_Construction of a School_Kommetjie Farm Otjozondjupa Region.pdf | 2.84 MB |
Mining of Semi precious Stones.
Attachment | Size |
---|---|
1454_MC_Mining Activities on Mining Claim No 69870_69874 at Gobobos_Erongo Region.pdf | 4.1 MB |
ECC application for the proposed new Safari house, cottage and tented camp development. In order to comply with the requirements of the Environmental Management Act (No. 7 of 2007), and its regulations of 2012.
Environmental Impact Assessment for the operation of an existing Sesriem fuel station at Sesriem, Sousssvlei, Hardap Region. The fuel station has been operating without an EMP on place, therefore Enercon Namibia (Pty) Ltd intends to regularize the operation of the existing fuel station according to the Environmental Management Act (2007) and its Regulations (2012). The site constitutes of three (3) underground fuel tanks (Diesel (2) and Petrol 1) each with the capacity of 23000L to cater for the vehicles in the Namibia Wildlife Resort in Sesriem.
Attachment | Size |
---|---|
1427_ECC Application and EMP_Sesriem fuel station at Sesriem.pdf | 4.72 MB |
1427_Retail Licence_Sesriem fuel station at Sesriem.PDF | 60.25 KB |
1427_Map_Sesriem fuel station at Sesriem.pdf | 288.13 KB |
For the operation of the !Nara seed processing plant.
Existing sand mining, quarrying and crushing activities on Steinquelle (Portion 23 of Consolidated Farm Tsumore No. 761).
Sand mining activities.
Attachment | Size |
---|---|
1455_Environmental Contract_Sand Mining Activities at Hailulu 3.pdf | 2.45 MB |
Sand mining activities.
Renewal of the existing ECC (02 August 2017) to continue with the operation at the Luedritz Port.
For the construction and operation of an above ground diesel tank with capacity of 20 cubic meters.
The application is for the renewal of an existing Buitepos Water Supply ECC, issued on the 29th of May 2017 for the above-mentioned project.
The application is for the renewal of an existing Karstland Water Supply ECC, issued on the 29th of May 2017 for the above-mentioned project.
The application is for the renewal of an existing Stampriet Water Supply ECC, issued 19 April 2017 for the above-mentioned project.
The application is for the renewal of an existing Rehoboth-Oanob Dam Water supply scheme ECC issued on the 19th of April 2017, for the above-mentioned project.
The application is for the renewal of an existing Baumsgartsbrunn Water Supply ECC, issued on the 29th of May 2017, for the above-mentioned project.
The application is for the renewal of an existing Omatako Dam - Von Bach Water Pipeline ECC, issued on the 29th of May 2017, for the above-mentioned Scheme.
The application is for the renewal of an existing Schlip Water Supply ECC, issued on the 19th of April 2017 for the above-mentioned project.
Fuel Retail Facility and Convenience shop.
Sand mining activities.
Attachment | Size |
---|---|
1455_Pro Forma Environmental Contract_Sand Mining Activities at Hailulu 3.pdf | 2.45 MB |
Shalom Messenger Ministries (hereinafter referred to as the Proponent) proposes to construct and operate a 300m high and 20m x 20m base radio transmission tower in the Omindamba B Village near Ruacana in the Omusati Region. The project Proponent identified the need of radio frequency modulation (FM) and related services in the area, hence the intention to erect the said tower.