EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal http://eia.met.gov.na.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 401 - 450 of 759Click/tap on any title to see full details of the record
Wednesday, 19 August 2020
Erongo Consulting Group 2020. APP-001649: Subdivision: Creation of A Public Road (Portions 180 and 181 of Remainder of Portion B of Swakopmund Town and Townlands No.41 into 12 Portions and Remainder), Swakopmund, Erongo Region, Namibia.

The creation of a Public Street / Road on Portions 180 and 181 of Remainder of Portion B of Swakopmund Town and Townlands No. 41, that will givs access to some of the newly created portions. The proposed public street obtains direct access from Tsavorite Street, and Henties Bay Road. The proposed public street is designed to be an 18m. wide cul-de-sac street. The proposed public street is designed to Swakopmund Council, Ministry of Urban and Rural Development and accepted traffic engineering design standards.

Tuesday, 18 August 2020
Erongo Consulting Group 2020. APP-001621: The Proposed Integrated Animal and Crop Farming and Related Infrastructure at Mubiza Village, Katima Mlilo, Namibia.

The EIA Process and the purpose of this EIA study is to identify the direct and indirect impacts that the development - Integration of crop, pasture, and livestock - , will have on the natural resources, eco-system, and the socio-economic dimensions of the neighbouring communities and populations. The integrated farming system is a commonly used term to explain a more integrated approach to farming compared to monoculture approaches.

Tuesday, 18 August 2020
Environmental Compliance Consultancy (ECC) 2020. APP-001426: Pilot sustainable water supply project by means of desalination, powered by solar to supplement water supply for Walvis Bay, Erongo Region, Namibia.

Application for the proposed pilot sustainable water supply project by means of desalination, powered by solar to supplement water supply for Walvis Bay Erongo Region. Listed activities triggered by the project include: Energy generation, transmission and storage activities 1. The construction of facilities for - (a) the generation of electricity; (b) the transmission and supply of electricity; Water resource develeopments 8.1 The abstraction of groundwater and surface water industrial or commercial purposes 8.12 The release of brine back into the ocean by desalination plants.

Monday, 17 August 2020
Risk-Based Solutions (RBS) 2020. APP-001686: Proposed Exploration/Prospecting in the Exclusive Prospecting License (EPL) No. 6667, Opuwo/Ruacana Districts, Kunene/Omusati Regions north-western Namibia.

Application for the transfer of the ECC was granted on the 14th September 2018 to the previous license holder / Proponent, KDN Geo Consulting CC. This ECC need to be transferred to the current license holder / Proponent, Philco One Hundred and Seventy-Three (173) (Pty) Ltd.

Monday, 17 August 2020
Risk-Based Solutions (RBS) 2020. APP-001567: Proposed Mining and Ongoing Exploration Activities in the Mining License (ML) No. 190 Karibib District, Erongo Region, Namibia.

The ECC is required with respect to the proposed dimension stone (marble) mining and ongoing exploration activities in the Mining License (ML) No. 190 Karibib District, Erongo Region. Following the completion of the exploration programme, the company has delineated economic marble resources within the ML No.

Monday, 17 August 2020
Risk-Based Solutions (RBS) 2020. APP-001566: Proposed Mining and Ongoing Exploration Activities in the Mining License (ML) No. 195 Karibib District, Erongo Region, Namibia.

The ECC is required for the proposed dimension stone (marble) mining and ongoing exploration activities in the Mining License (ML) No. 195 Karibib District, Erongo Region. The proposed dimension stone mining project will involve the mining of variable sizes of 5m3 and 7m3 blocks, sorting, storage, transportation to the two (2) plants in Karibib and Walvis Bay for final processing of the dimension stones. The processed dimension stone products will be sold local, regionally and also exported to the various parts of the World such as the USA, China and Europe.

Monday, 17 August 2020
Namibia Water Corporation (NamWater) 2020. APP-001669: Construction of a Short Power supply line Project - Stampriet.

The application is for an Environmental Clearance Certificate for the Construction of a Power Supply line Project, Stampriet, Hardap Region.

Monday, 17 August 2020
Namibia Water Corporation (NamWater) 2020. APP-001671: Construction of a Short Power supply line Project - Maltahohe.

The application is for an Environmental Clearance Certificate for the Construction of a Power Supply line Project, Maltahohe, Hardap Region.

Monday, 17 August 2020
Namibia Water Corporation (NamWater) 2020. APP-001672: Construction of a Short Power supply line Project - Khorixas.

The application is for an Environmental Clearance Certificate for the Construction of a Power Supply line Project, Khorixas, Kunene Region.

Monday, 17 August 2020
Cenored 2020. APP-001685: Construction of the proposed 33 kV overhead power line from Maroelaboom to Mangetti Dune.

Construction of a new 33 kV overhead power line to be constructed along the existing roads (C44 and D3304) from Maroelaboom to Mangetti Dune in Otjozondjupa Region. The new overhead powerline will cover a distance of 125km.

Saturday, 15 August 2020
Outrun Consultants 2020. APP-001557: An Environmental Management Plan for an existing red meat abattoir at Katima Mulilo, Zambezi Region.

The application for an ECC for an existing Meat Abattoir at Katima Mulilo in Zambezi Region.

Friday, 14 August 2020
Namibia Environmental Consultants (NEC) 2020. APP-001475: The construction and operation of WT Fuel Centre (Truck Port) on Erf 546 in Katima Mulilo.

The Environmental Clearance Certificate is for the construction and operation of the WT Fuel Center (Truck Port) in Katima Mulilo. The site area is located on the premises of Roads Contractor Company (RCC) in Katima Mulilo. The site has previously been used by RCC to fill up their construction machinery and as a result, there is already an underground diesel tank. The tank has a capacity of 82000 Litres and the current proponent will make use of the same tank.

Thursday, 13 August 2020
Stubenrauch Planning Consultants 2020. APP-001674: Environmental Assessment for the Subdivision of the Remainder of Portion 49 of the Consolidated Farm Tsumore No. 761 into Portions A- E and Remainder, and creation, Tsumeb, Oshikoto Region.

The environmental clearance certificate is for: Activity 10.1 (b) Infrastructure The construction of Public roads Activity 10.2 (a) Infrastructure The route determination of roads and design of associated physical infrastructure where - it is a public road The proponent intends to subdivide the Remainder of Portion 49 of the Consolidated Farm Tsumore No. 761 into Portions A - E and Remainder. Currently portion D accommodates the existing rubbish dump of the Municipality while Portions A - C, E and the Remainder is currently vacant.

Thursday, 13 August 2020
NamPower 2020. APP-001670: The operation of the 66KV Gerus-Platveld Transmission Line.

The ECC is for the operation of the 66kV Gerus - Platveld transmission line in Otjozondjupa Region. The 66kV Gerus - Platveld line was constructed prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 13 August 2020
NamPower 2020. APP-001667: The operation of the 66KV Gerus-Paresis Transmission Line in Otjozondjupa Region.

The ECC is for the operation of the 66kV Gerus - Paresis transmission line. The 66kV Gerus – Paresis line was constructed in 1999 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Thursday, 13 August 2020
SLR Environmental Consulting (Namibia) 2020. APP-001680: Renewal Application: Environmental Clearance Certificate for the amendment to the Arandis Power Thermal Power Generation and Waste Oil Recycling Plant, Erongo Region.

Renewal application: The renewal of Arandis Power’s Environmental Clearance Certificate (ECC) for the Amendment to the Arandis Power Thermal power generation and waste oil recycling plant, Erongo Region (i.e. Renewal Application for: Arandis Power 120MW Heavy Fuel Oil (HFO) power plant and the associated solar photovoltaic power plant).

Wednesday, 12 August 2020
SLR Environmental Consulting (Namibia) 2020. APP-001104: Environmental Performance Report and Management Plan for water abstraction boreholes on Farm Finsterbergen WW 205370 (BH1), WW 205368 (BH2), WW 205369 (BH3), WW 205367 (BH4), and WW 205371 (BH5).

Farm Finsterbergen No. 469 (Farm Finisterbegen) managed by Mr. Siegfried Kuhn is located 30 km north-west of Otavi and 40 km south west of Tsumeb, in the Otjozondjupa Region. The farm was previously owned by Finsterbergen Holdings CC as an irrigation farm and it has since 2017 been bought over by Marabu Trading (PTY) Ltd (Marabu Trading) also for the purposes of conducting an irrigation scheme.

Tuesday, 11 August 2020
NamPower 2020. APP-001673: The operation of the 66KV Otjiwarongo-Matemba Transmission Line in Otjozondjupa Region.

The ECC is for the operation of the Otjiwarongo - Matemba transmission line. 66kV Otjiwarongo - Matemba line was constructed prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Tuesday, 11 August 2020
Stubenrauch Planning Consultants 2020. APP-001581: Subdivision of Erf 3108 (of Erf 101), Okahao Proper into 12 erven and Remainder, Okahao, Omusati Region.

The proponent intends to rezone Erf 3108 from Government to Undetermined after which it will be subdivided into 12 Erven and Remainder. The proposed subdivision will create 11 Residential erven and 1 Public Open Space. The proposed subdivision will also provide for the creation of a 12-meter-wide street.

Monday, 10 August 2020
LM Environmental Consulting 2020. APP-001596: Environmental Management Plan for the Chobe Savanna Lodge, Zambezi Region, Namibia.

Environmental Management Plan for the Chobe Savanna Lodge, Zambezi Region, Namibia Existing Tourism Establishment (Chobe Savanna Lodge was built in 1999; the present owner, Caprivi Fly Fishing Safaris (Pty) Ltd T/A Chobe Savanna Lodge, purchased the property in 2008).

Monday, 3 August 2020
Stubenrauch Planning Consultants 2020. APP-001623: Environmental Assessment for the Subdivision, Permanent Closure and Rezoning of Erf 599, Ondangwa Extension 1, Ondangwa.

The environmental clearance certificate is for: Activity 5.1 (d) (Infrastructure) The rezoning of land from use for nature conservation or zoned open space to any other land use. The proponent intends to subdivide Erf 599 into Erf A, B, C and Remainder. It is thus further the intention of the proponent to permanently close Erven A/599, B/599 and C/599, as Public Open Space in order to rezone Erf A/599 from Public Open Space to Office; Erf B/599 from Public open space to Civil and Erf C/599 from Public Open Space to Institutional.

Monday, 3 August 2020
Stubenrauch Planning Consultants 2020. APP-001624: Environmental Assessment for the Subdivision, Permanent Closure and Rezoning of Erf 332 Onethindi Extension 1, Oniipa, Oshikoto Region.

The environmental clearance certificate is for: Activity 5.1 (d) (Infrastructure) The rezoning of land from use for nature conservation or zoned open space to any other land use. The proponent aims to subdivide Erf 332 Onethindi Extension 1 into Erven A/332, B/332 and Remainder. Erf 332, Onethindi Extension 1 is currently owned by the Oniipa Town Council. The erf however accommodates JSN Automotive Groups business in the form of a car garage.

Monday, 3 August 2020
Stubenrauch Planning Consultants 2020. APP-001623: Environmental Assessment for the Subdivision, Permanent Closure and Rezoning of Erf 599, Ondangwa Extension 1, Ondangwa.

The environmental clearance certificate is for: Activity 5.1 (d) (Infrastructure) The rezoning of land from use for nature conservation or zoned open space to any other land use. The proponent intends to subdivide Erf 599 into Erf A, B, C and Remainder. It is thus further the intention of the proponent to permanently close Erven A/599, B/599 and C/599, as Public Open Space in order to rezone Erf A/599 from Public Open Space to Office; Erf B/599 from Public open space to Civil and Erf C/599 from Public Open Space to Institutional.

Monday, 3 August 2020
Stubenrauch Planning Consultants 2020. APP-001624: Environmental Assessment for the Subdivision, Permanent Closure and Rezoning of Erf 332 Onethindi Extension 1, Oniipa, Oshikoto Region.

The environmental clearance certificate is for: Activity 5.1 (d) (Infrastructure) The rezoning of land from use for nature conservation or zoned open space to any other land use. The proponent aims to subdivide Erf 332 Onethindi Extension 1 into Erven A/332, B/332 and Remainder. Erf 332, Onethindi Extension 1 is currently owned by the Oniipa Town Council. The erf however accommodates JSN Automotive Groups business in the form of a car garage.

Friday, 31 July 2020
LM Environmental Consulting 2020. APP-001456: Operation of the Kappsvalley Lodge, Farm Kappsvalley Farm No. 65, Windhoek Rural, Khomas Region.

To open Lodge for tourists, and to get registration from NTB.

Friday, 31 July 2020
SLR Environmental Consulting (Namibia) 2020. APP-001625: The renewal of the environmental clearance certificate for the Emulsion Manufacturing Plant at the Husab Mine.

Renewal Application: Continue operating the emulsion manufacturing plant, which stores and then mixes relatively inert chemicals and oils to produce an emulsified product for use in blasting. Swakop Uranium’s emulsion manufacturing plant at the Husab Mine, which stores and then mixes relatively inert chemicals (ammonium nitrate and sodium nitrate) and oils (used diesel and machine oil) to produce an emulsified product for use in blasting. The product from the plant is a non-explosive yellowish paste.

Friday, 31 July 2020
SLR Environmental Consulting (Namibia) 2020. APP-001626: The renewal of the environmental clearance certificate for the telecommunication transmitter mast at the Husab Mine.

Renewal Application: Continue operating the telecommunication transmitter mast (i.e. cell phone tower) to ensure effective communication for Swakop Uranium’s activities at the Husab Mine plant complex. Swakop Uranium required a telecommunication transmitter mast (i.e. cell phone mast) in order to meet communication requirements at their Husab Mine. As part of the original Husab Mine EIA and the EIA Amendment process, a 30 m high cell phone mast was described and assessed for radio and cell-phone communication repeaters to be installed on site near the plant complex.