These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Kunene Region.
The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Khomas Region.
The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Erongo Region.
The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Kavango Regions.
The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Karas Region.
The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Hardap Region.
Solar Photovoltaic Project (Renewable energy) - renewal/extension of ECC.
Exploration activities on EPL 7402 for base and rare metals, industrial minerals, precious metals in the Kunene and Otjozondjupa Regions. Nature of activity: The proposed project is for the exploration of base and rare metals, industrial minerals and precious metals.
Exploration activities on EPL 7341 for base and rare metals, industrial minerals, precious metals in the Oshikoto and Otjozondjupa Regions. Nature of activity: The proposed project is for the exploration of base and rare metals, industrial minerals and precious metals.
The Renewal of the Environmental Clearance Certificate is for: Continuation of the Solar Power Plant operation project on ML 142, for which an Environmental Clearance was obtained during September 2017 (see attached Appendix B to the cover letter), which requires authorisation in terms of the Environmental Management Act, 2007 (Act 7 of 2007) i.e. Energy Generation, Transmission and Storage activities. Title of Activity: Continuation of the Solar Power Plant operation project on ML 142.
The Renewal of the Environmental Clearance Certificate is for: Quarrying activities. Potential clearance of forest area (i.e. trees) that might require authorisation in terms of the Forest Act, 2001 (Act No. 12 of 2001) or any other law. The construction of public roads. 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1 Title of the Activity Upgrading of road DR3610, Mangetti West, Nehale LyaMpingana Constituency to gravel standards (Oshikoto Region).
Mining of semi-precious stones (Green Garnet).
| Attachment | Size |
|---|---|
| 1759_Proforma EC_Mining Activities on Mining Claim No 71960_71962 at Karibib.pdf | 3.57 MB |
Solar Photovoltaic Project (Renewable energy) - renewal/extension.
Commenting of the public on this project will expire at 12h00 on the 2020-08-25.
TOV Multipurpose center proposes to establish a poultry farming venture on its Plot 18 of Farm Oerwoud. Although poultry farming is not specified in the Listed Act, the proponent has been request to obtain an Environmental Clearance Certificate by the project funders. As such, an ECC is being applied for.
| Attachment | Size |
|---|---|
| 999_EMP_Environmental Management Plan for establishment of a poultry project at TOV Farm.pdf | 1.62 MB |
Stantoll Properties CC (hereinafter referred to as Stantoll Properties or the Proponent) intends to continue with their sand/gravel mining activities from a sand/gravel bank in the Onanime Village, Okatana Constituency of the Oshana Region. The project has been in operation since October 2015 whereby the sand/gravel has been extracted from a burrow pit with an approximate surface area of 7 hectares (ha).
Energy generation, transmission and storage activities - The construction of facilities for refining of gas, oil and petroleum products; Hazardous substance treatment, handling and storage - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.
Energy generation, transmission and storage facilities - The construction of facilities for the refining of gas, oil and petroleum products; Hazardous substance treatment, handling and storage - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.
The ECC is for the operation of 66kV Rehoboth - Blumfelde transmission line. 66kV Rehoboth - Blumfelde line was constructed IN 1996 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.
The ECC is for the operation of 66kV Omburu - Uis transmission line. The 66kV Omburu - Uis line was constructed was constructed in 1974 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.
The ECC is for the operation of the 66kV Gobabis - Omaere transmission line. The 66kV Gobabis-Omaere line was constructed from 1992 and was commissioned in 1995 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.
The ECC is for the operation of the 66kV Gerus -Welwitchia transmission line. 66kV Gerus – Welwitchia line was constructed in 1989 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.
To close a portion of erf 912, Omuthiya Extension 3 as a public open space and subsequent rezoning, subdivision and consolidation to enable the Regional Government to formalise a house already constructed on the property.
For the township establishment of Onyuulaye Proper and Extension 1 in Onyuulaye Settlement in Oshikoto Region.
The environmental clearance certificate is for the proposed agriculture project for farm Erhardshof 575, Otjozondjupa region, Namibia The proposed project will be located on Farm Erhardshof 575, which is approximately 3 522 hectares in size, of which the total irrigated project size at the final phase will be 135 hectares. The intention is to initially plant fodder for cattle such as Katambora Rhodes grass as well as rotational grain crops such as maize and wheat.
The environmental clearance certificate is for: Activity 5.1 (d) Infrastructure The rezoning of land from use for nature conservation or zoned open space to any other land use. Activity 10.1 (b) (Infrastructure) The construction of - Public roads. Activity 10.2 (a) (Infrastructure) The route determination of roads and design of associated physical infrastructure where - it is a public road. The Proponent intends to subdivide Erf 502, Nkurenkuru Extension 1 into Erf A and the Remainder.
The ECC application is for the construction of the proposed Swakopmund Smallholding Potable Water Reservoir, and it will consist of the following main elements: • Supply and installation of a prefabricated water treatment plant including all fittings and accessories: • Construction of a concrete storage tank The reservoir will be a reinforced concrete structure, and will have a round shape with a smooth surface. The round shape of the reservoir will result in the strongest and most cost effective solution.
The proponents intents to establish and operate the proposed 5 MW Solar Photovoltaic Power Plant with 33 kV Powerline next to the NamPower Otjongava Substation at Oukongo–Okomize Village, Epupa Constituency, Kunene Region, Namibia.
Permanent Closure of a Portion of Abalone Avenue, Mile 4, Swakopmund in order to consolidate such closed street portion with Erf 40, Mile 4, Swakopmund.
ECC is for the Construction and Operations of a Fuel Retail Facility and Truck Port in Katima Mulilo.
Sand mining activities for Oukwanyama Traditional Authority.
| Attachment | Size |
|---|---|
| 1056_Proforma EC_Sand Mining Activities at Omakango_Endola Constituency.pdf | 3.52 MB |
Mining of semi-precious stones (Blue Sodalite).
| Attachment | Size |
|---|---|
| 1651_Proforma EC_Mining Activities on Mining Claim No 70488_70490 at Otjimuhaka_Kunene Region.pdf | 2.21 MB |
Exploration and small-scale test mining activities, Katima Mulilo.
| Attachment | Size |
|---|---|
| 1744_EMP_Proposed exploration_Exclusive Prospecting License EPL 6952.pdf | 537.9 KB |
Mining of semi- precious stones ( Quartz).
| Attachment | Size |
|---|---|
| 1717_Proforma EC_Mining Activities on Mining Claim No 71579 at Karibib Erongo Region.pdf | 2.45 MB |
Mining of semi-precious stones.
| Attachment | Size |
|---|---|
| 1716_Proforma EC_Mining Activities on Mining Claim No 72031_72033 at Sesfontein.pdf | 2.4 MB |
Mining of semi-precious stones.
| Attachment | Size |
|---|---|
| 1700_Proforma EC_Mining Activities on Mining Claim No 72016 at Farm Ram Kamp.pdf | 1.75 MB |
Mining of semi-precious Stones.
| Attachment | Size |
|---|---|
| 1699_Proforma EC_Mining Activities on Mining Claim No 72034_72036 at Sesfontein.pdf | 1.57 MB |
Mining of semi-precious stones.
| Attachment | Size |
|---|---|
| 1696_Proforma EC_Mining Activities on Mining Claim No 71710_71712 at Farm Tsawises_93.pdf | 2.85 MB |
Mining of semi-precious stones.
| Attachment | Size |
|---|---|
| 1695_Proforma EC_Mining Activities on Mining Claim No 70121_70123 at Fyndraai.pdf | 1.59 MB |
Mining of semi-precious stones.
| Attachment | Size |
|---|---|
| 1694_Proforma EC_Mining Activities on Mining Claim No 72028_72030 at Sesfontein.pdf | 1.68 MB |
Mining of semi-precious stones.
| Attachment | Size |
|---|---|
| 1693_Proforma EC_Mining Activities on Mining Claim No 72011_72012.pdf | 2 MB |
Mining of semi-precious stones.
| Attachment | Size |
|---|---|
| 1692_Proforma EC_Mining Activities on Mining Claim No 72004_72008 at Rosh Pina.pdf | 3.05 MB |
Mining of semi-precious stones.
| Attachment | Size |
|---|---|
| 1656_Proforma EC_Mining Activities on Mining Claim No 71802_71803 at Farm Freyer No 671.pdf | 2.29 MB |
Mining of semi-precious stones.
| Attachment | Size |
|---|---|
| 1655_Proforma EC_Mining Activities on Mining Claim No 71799_71801 at farm Goeigeluk.pdf | 1.95 MB |
Mining of semi-precious stones.
| Attachment | Size |
|---|---|
| 1654_Proforma EC_Mining Activities on Mining Claim No 71515 at Otjikukutu.pdf | 1.43 MB |
Mining of semi- precious stones ( Tourmaline).
| Attachment | Size |
|---|---|
| 1653_Proforma EC_Mining Activities on Mining Claim No 70370_70372 at Okongava 72.pdf | 3.71 MB |
Mining of semi-precious stones.
| Attachment | Size |
|---|---|
| 1652_Proforma EC_Mining Activities on Mining Claim No 71855_71857 at Farm Estoll Rospoort.pdf | 1.54 MB |
For the subdivision and the creation of a street.
Mining of semi-precious stones.
| Attachment | Size |
|---|---|
| 1666_Proforma EC_ Mining Activities on Mining Claim No 71416_71419 at Post 5 Goabeb.pdf | 2.11 MB |
Environmental Impact Assessment for mineral exploration on EPL 7261.