These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.
The dates indicate the last date that it was/will be possible to comment on the project on the portal.
You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.
Explore your search results using the filter checkboxes, or amend your search or start a new search.
The application is for the renewal of an existing Stampriet Water Supply ECC, issued 19 April 2017 for the above-mentioned project.
The application is for the renewal of an existing Rehoboth-Oanob Dam Water supply scheme ECC issued on the 19th of April 2017, for the above-mentioned project.
The application is for the renewal of an existing Baumsgartsbrunn Water Supply ECC, issued on the 29th of May 2017, for the above-mentioned project.
The application is for the renewal of an existing Omatako Dam - Von Bach Water Pipeline ECC, issued on the 29th of May 2017, for the above-mentioned Scheme.
The application is for the renewal of an existing Schlip Water Supply ECC, issued on the 19th of April 2017 for the above-mentioned project.
Fuel Retail Facility and Convenience shop.
Sand mining activities.
| Attachment | Size |
|---|---|
| 1455_Pro Forma Environmental Contract_Sand Mining Activities at Hailulu 3.pdf | 2.45 MB |
Shalom Messenger Ministries (hereinafter referred to as the Proponent) proposes to construct and operate a 300m high and 20m x 20m base radio transmission tower in the Omindamba B Village near Ruacana in the Omusati Region. The project Proponent identified the need of radio frequency modulation (FM) and related services in the area, hence the intention to erect the said tower.
The Environmental Clearance Certificate is for: Activity 1(A) Energy generation. transmission and storage activities. The construction of facilities for the generation of electricity (solar). Activity 1(B) Energy generation. transmission and storage activities.The construction of the transmission and supply of electricity. Activity 2.3 Waste management, treatment, handling and disposal activities. Temporary storage of waste. Activity 4 Forestry activities. Removal of protected species. Activity 5.1(d) Land use and development activities. Use for nature conservation.
Renewal Application for environmental clearance certificate for mining activities for base and rare metals, industrial minerals, and precious metals on mining licence 129,133 and 134 in the Erongo Region, Namibia. The project involves, the following activities: Mining activities, and creation of tracks and access roads.
To develop a tantalite mine in Southern Namibia.
To carry out mineral exploration activities on EPL 6931.
To carry out mineral exploration activities on EPL 7572.
Agra Opuwo Fuel Retail Facility has been in operation for many years before the EMA Act was promulgated. ECC application is for proposed upgrade activities and continued operations of the existing fuel facility. In order to comply with the requirements of the Environmental Management Act (No. 7 of 2007), and its regulations of 2012.
Agra Omaruru Fuel Retail Facility has been in operation for many years before the EMA Act was promulgated. ECC application is for proposed upgrade activities and continued operations of the existing fuel facility. In order to comply with the requirements of the Environmental Management Act (No. 7 of 2007), and its regulations of 2012.
Agra Karibib Fuel Retail Facility has been in operation for many years before the EMA Act was promulgated. ECC application is for proposed upgrade activities and continued operations of the existing fuel facility. In order to comply with the requirements of the Environmental Management Act (No. 7 of 2007), and its regulations of 2012.
For Groundwater Abstraction for industrial purposes.
| Attachment | Size |
|---|---|
| 1407_NBL_Environmental Performance Report and EMP.pdf | 2.27 MB |
The TradePort Namibia's trade operations of import and exporting fuel (petroleum products including diesel, petrol and lubricants) and mineral (Copper, Coal, Manganese and Sulphur) commodities.
ECC is for the mariculture of abalone and mussels as well as the collection of washed out seaweed at Lüderitz.
Enviro Dynamics, Norman van Zyl (ID 68072700855) apply for the environmental clearance renewal of the 10 MV solar PV power plant at Ohorongo Cement Dated 12 July 2017 On behalf of SunEQ Four Investments (Namibia) Pty (Ltd).
In 2012, Namwater initiated the Divundu Bulk Water Supply Scheme to provide potable, good quality, treated water to Bagani and Divundu, along the Eastern Okavango River (Map below). An EIA was completed for the project, and an Environmental Clearance Certificate was obtained for the construction, operation and decommissioning of the project.
| Attachment | Size |
|---|---|
| 940_EMP_Divundu Water Supply Extention Project.pdf | 1.81 MB |
Mining Of Semi Precious Stones.
| Attachment | Size |
|---|---|
| 1400_MC_Mining Activities on Mining Claim no 71731_71733 at Farm Tumib 20.pdf | 3.66 MB |
Mining of Semi Precious Stones.
| Attachment | Size |
|---|---|
| 1399_MC_Mining activities on Mining Claim no 71738 at Oroutumba.pdf | 2.58 MB |
Mining of Semi Precious Stones.
| Attachment | Size |
|---|---|
| 1398_MC_Mining Activities on Mining Claim no 71734_71737 at Opuwo.pdf | 3.56 MB |
Mining of Semi Precious Stones.
| Attachment | Size |
|---|---|
| 1397_MC_Mining Activities on Mining Claim no 71175_71178 at Kanbeb.pdf | 4.4 MB |
Mining of Semi Precious Stones.
| Attachment | Size |
|---|---|
| 1396_MC_Mining Activities on Mining Claim no 70960 at Farm Kaliambo.pdf | 2.46 MB |
Mining of semi precious stones.
| Attachment | Size |
|---|---|
| 1395_MC_Mining Activities on Mining Claim no Karibib.pdf | 2.66 MB |
Mining of Semi Precious Stones.
| Attachment | Size |
|---|---|
| 1394_MC_Mining Activities on Mining Claim 69805_69807 at Outjo Kunene Region.pdf | 3.09 MB |
Mining of Semi Precious stones.
| Attachment | Size |
|---|---|
| 1393_MC_Mining activities on Mining Claim no 71720 at Stateland_Erongo Region.pdf | 2.86 MB |
Mining of Semi Precious Stones.
| Attachment | Size |
|---|---|
| 1392_MC_Mining activities On Mining Claim No 70814_70816 at Luderitz.pdf | 3.21 MB |
Mining of Semi Precious Stones.
| Attachment | Size |
|---|---|
| 1391_MC_Mining activities on mining claim no 71102_71111 at Luderitz.pdf | 4.86 MB |
Mining of semi precious stones.
| Attachment | Size |
|---|---|
| 1390_MC_Mining Activities on mining claim no 71715_71719 at Uis.pdf | 3.59 MB |
Mining of Semi precious stones.
| Attachment | Size |
|---|---|
| 1384_MC_Mining activities on mining claim no 56405 at Omake.pdf | 3.28 MB |
Mining of semi precious stones.
| Attachment | Size |
|---|---|
| 1383_MC_Mining activities on mining claim no 71685_71391 at Naies No 338.pdf | 4.17 MB |
Mining of Semi Precious Stones Chrysocolla.
| Attachment | Size |
|---|---|
| 1414_MC_Mining activities on Mining Claim no 71796 at Opuwo.pdf | 1.97 MB |
Gobabis Agra Fuel Retail Facility has been in operation for many years before the EMA Act was promulgated. ECC application is for the proposed upgrade activities and continued operations of the existing fuel facility. In order to comply with the requirements of the Environmental Management Act (No. 7 of 2007), and its regulations of 2012.
Renewal of Environmental Clearance Certificate.
Okahao Town Council has appointed John Heita Urban and Regional Planners cc to apply to apply for the subdivision of Erf 1225 (5174sq) Okahao Extension 2, into Portion “A” (4191sq) and Remainder (9831sq) and permanent Closure of Portion A as a “Public Open Spaces” and Rezone to “Business” for the construction of business complex and shopping center.
For the construction and operation of a small waste disposal site.
The TradePort Namibia's trade operations of import and exporting fuel (petroleum products including diesel, petrol and lubricants) and mineral (Copper, Coal, Manganese and Sulphur) commodities.
The TradePort Namibia's trade operations of import and exporting fuel (petroleum products including diesel, petrol and lubricants) and mineral (Copper, Coal, Manganese and Sulphur) commodities.
Establishment of a clay processing facility.
The proposed establishment of clay processing facility.
Mining of semi precious stones.
| Attachment | Size |
|---|---|
| 1251_Environmental Contract_Mining Activities on mining claim no 71056_71058 at Damaraland.pdf | 3.74 MB |
Namfocus Investments cc (CC/2011/6408) intends to construct and operate a fuel service station at Ondalaye yaElim growth point in Ekanda Village, Omusati Region at the junction between the Oshakati-Okahao C41 Highway and the newly constructed D3615 road to Oshikuku. The proposed development will entail the establishment of a convenience store, a fuel canopy with four (4) dispersive pumps, a small carwash bay, and the installation of two (2) underground fuel storage tanks, one for diesel and another for petrol.
Renewal application: SwaCa lime project; Environmental clearance for the development, construction and operation of the mining and processing of calcitic marble. Storage and transport of raw material and product.
| Attachment | Size |
|---|---|
| 1280_EMP_ Swakopmund Calcite and Lime Project.pdf | 846.07 KB |
| 1280_ECC_ Swakopmund Calcite and Lime Project.pdf | 93.63 KB |
| 1280_Map_ Swakopmund Calcite and Lime Project.pdf | 2.38 MB |
Waste management, treatment, handling and disposal activities 2.1: The construction of facilities for waste sites, treatment of waste and disposal of waste. 2.2 Any activity entailing a scheduled process referred to in the Atmospheric Pollution Prevention Ordinance, 1976. 2.3 The import, processing, use and recycling, temporary storage, transit or export of waste.
Proponents wishes a cultural village to teach the culture of the Damara People to visitors of the Spitzkoppe.
| Attachment | Size |
|---|---|
| 1216_EMP_Spitzkoppe Cultural Village.pdf | 2.72 MB |
Kalkrand Village Council is in the process of upgrading and promoting development in the Donker hoek settlement area of Farm Gurus No. 150 Kalkrand by formalising informal settlements and in so doing improve the economy of Kalkrand. Therefore, the proponent being Kalkrand Village Council approved the creation of Portion 21 (Donker Hoek), Extension 3 of the Remainder of Farm Gurus No. 150, Kalkrand measuring approximately (141, 757.68 m²) for use to formalise the existing informal settlement.
Waste Management, Treatment, Handling and Disposal Activities 2.3 The import, processing, use and recycling, temporary storage, transit or export of waste.