Search results

EIA reports for public comment

These reports are listed currently or were previously listed on the Department of Environmental Affairs ECC Portal https://eia.meft.gov.na/.

The dates indicate the last date that it was/will be possible to comment on the project on the portal.

You can also track the progress of EIAs in Namibia using the EIA Tracker website on https://eia-tracker.org.na and you can learn more about the EIA process in Namibia here.

Explore your search results using the filter checkboxes, or amend your search or start a new search.

Displaying results 5351 - 5400 of 5803
Wednesday, 2 September 2020
Urban Green 2020. APP-001771: Application for an Environmental Clearance Certificate for the proposed township establishment of Amraalsduin Extensions 1 and 2, Leonardville Village, Omaheke Region.

The Environmental Clearance Certificate is for: 1. (b) The transmission and supply of electricity. 4. Any other related activity that requires authorisation in terms of the forest Act (Act No. 12 of 2001) or any other law. 5.2 The establishment of land resettlement schemes. 10.1 (b) The construction of public roads. 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1 Title of the Activity: Township Establishment: Amraalsduin Extensions 1 and 2.

Wednesday, 2 September 2020
Excel Dynamic Solutions 2020. APP-001576: Environmental Assessment (EA) for a Road Construction Stones Quarry located near Okahandja Town in the Otjozondjupa region, Namibia.

The Lewcor Group (hereinafter referred to as The Proponent) is contracted by the Road Authority (RA) to supply road construction materials and/or aggregates for the rehabilitation and upgrading of the TR1/6 Road between Windhoek and Okahandja. The Proponent has been involved in a wide range of commercial, mining and infrastructure development projects, undertakings and businesses for over 30 years.

Wednesday, 2 September 2020
Plan Africa Consulting 2020. APP-001239: Subdivision of Portion 41 of the Farm Rehoboth Dorpsgrond No. 302 into Portions 144 and 145 and the remainder, Rehoboth, Hardap Region-Namibia.

Subdivide a 3 ha. portion A and B into 1.5 ha. each. There will be no land use change.

Wednesday, 2 September 2020
Enviro Dynamics 2020. APP-001076: Proposed Windhoek - Rehoboth Freeway.

The Proposed route, construction and operation for the Windhoek-Rehoboth Freeway.

Tuesday, 1 September 2020
Namibia Water Corporation (NamWater) 2020. APP-001770: The Renewal of the Environmental Assessment and Management Plan for the Continuation of the Gobabis Water Supply Scheme and Maintenance to Infrastructure, Omaheke Region.

The ECC is for the renewal of an existing ECC for the above mentioned project.

Tuesday, 1 September 2020
Namibia Water Corporation (NamWater) 2020. APP-001769: The Renewal of the Environmental Assessment and Management Plan for the Continuation of the Gobabeb Water Supply Scheme and Maintenance to Infrastructure, Erongo Region.

The ECC is for the renewal of an existing ECC for the above mentioned project.

Tuesday, 1 September 2020
Namibia Water Corporation (NamWater) 2020. APP-001768: The Renewal of the Environmental Assessment and Management Plan for the Continuation of the Friedenau Dam Water Supply Scheme and Maintenance to Infrastructure, Khomas Region.

The ECC is for an existing ECC for the above mentioned project.

Tuesday, 1 September 2020
Namibia Water Corporation (NamWater) 2020. APP-001767: Environmental Assessment and Management Plan for the Continuation of the Ernst Meyer Water Supply Scheme and Maintenance to Infrastructure, Omaheke Region.

The ECC is for the renewal of an existing ECC.

Tuesday, 1 September 2020
Namibia Water Corporation (NamWater) 2020. APP-001766: The Renewal of the Environmental Assessment and Management Plan for the Continuation of the Du Plessis Plaas Water Supply Scheme and Maintenance to Infrastructure, Erongo Region.

The ECC is for an existing ECC.

Tuesday, 1 September 2020
Namibia Water Corporation (NamWater) 2020. APP-001765: The Renewal of the Environmental Assessment and Management Plan for the Continuation of the Anichab Water Supply Scheme and Maintenance to Infrastructure, Erongo Region.

The ECC is for the renewal of an existing ECC.

Tuesday, 1 September 2020
LM Environmental Consulting 2020. APP-001764: Environmental Scoping and Environmental Management Plan (EMP) for Quarrying and Related Activities by Peralin (Pty) Ltd’s (Claims 1-5 (Ordinal No’s); Registered No’s 70691-70695) (previously 68113 to 68117), Farm Gocheganas No. 26, Khomas Region, Namibia.

Renewal of ECC for Environmental Scoping and Environmental Management Plan (EMP) for Quarrying and Related Activities by Peralin (Pty) Ltd’s (Claims 1-5 (Ordinal No’s); Registered No’s 70691-70695) (previously 68113 to 68117), Farm Gocheganas No. 26, Khomas Region, Namibia Please note: i) the Claims have since expired; ii) Peralin (Pty) Ltd is in the process of rehabilitating the existing quarry-area; and iii) activities will continue at the Processing and Packaging Area, located on Part 1, Farm Gocheganas No.

Tuesday, 1 September 2020
Shagama FN 2020. APP-001733: The Construction and Operational Activities of the 5 MW Solar (Photovoltaic) Power Plant Project in Okatope, Oshikoto Region.

The Project's Construction (underway) and Operational and Maintenance Activities (Renewal of the Expired ECC).

Tuesday, 1 September 2020
Municipality of Walvis Bay 2020. APP-001578: Environmental Management Plan for the Operation of the Walvis Bay Cemetery.

Environmental Management Plan for the Operation of the Walvis Bay Cemetery.

Tuesday, 1 September 2020
Matrix Consulting Services 2020. APP-001523: Proposed upgrade and continued operation of the existing Hombe Engen Fuel Retail Facility, at Divundu.

Hombe Engen Fuel Retail Facility has been in operation for over 15 years before the EMA Act was promulgated. The ECC application is submitted for the proposed upgrade activities and continued operations of the existing fuel facility, in order to comply with the requirements of the Environmental Management Act (No. 7 of 2007), and its regulations of 2012.

Thursday, 27 August 2020
Green Earth Environmental Consultants 2020. APP-001758: Environmental Scoping Assessment for the creation of a street from the subdivision of the remainder of Erf 77, Klein Windhoek.

Infrastructure 10.1 The construction of- (b) public roads; 10.2 The route determination of roads and design of associated physical infrastructure where: (a) it is a public road.

Thursday, 27 August 2020
Urban Green 2020. APP-001757: Management and operations of Base Transmitter Stations in Ohangwena Region.

The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Ohangwena Region.

Thursday, 27 August 2020
Urban Green 2020. APP-001756: Management and operations of Base Transmitter Station Infrastructure in Zambezi Region.

The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Zambezi Region.

Thursday, 27 August 2020
Urban Green 2020. APP-001755: Management and operations of Base Transmitter Station Infrastructure, Otjozondjupa Region.

The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Otjozondjupa Region.

Thursday, 27 August 2020
Urban Green 2020. APP-001754: Management and operations of Base Transmitter Station Infrastructure in Oshikoto Region.

The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Oshikoto Region.

Thursday, 27 August 2020
Urban Green 2020. APP-001753: Management and operations of Base Transmitter Station Infrastructure in Oshana Region.

The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Oshana Region.

Thursday, 27 August 2020
Urban Green 2020. APP-001752: Management and operations of Base Transmitter Station Infrastructure in Omusati Region.

The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Omusati Region.

Thursday, 27 August 2020
Urban Green 2020. APP-001751: Management and operations of Base Transmitter Station Infrastructure in Omaheke Region.

The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Omaheke Region.

Thursday, 27 August 2020
Urban Green 2020. APP-001750: Management and operations of Base Transmitter Station Infrastructure in Kunene Region.

The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Kunene Region.

Thursday, 27 August 2020
Urban Green 2020. APP-001749: Management and operations of Base Transmitter Station Infrastructure in Khomas Region.

The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Khomas Region.

Thursday, 27 August 2020
Urban Green 2020. APP-001748: Management and operations of Base Transmitter Station Infrastructure in Erongo Region.

The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Erongo Region.

Thursday, 27 August 2020
Urban Green 2020. APP-001747: Management and operations of Base Transmitter Station Infrastructure in Kavango East Region.

The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Kavango Regions.

Thursday, 27 August 2020
Urban Green 2020. APP-001746: Management and operations of Base Transmitter Station Infrastructure in Karas Region.

The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Karas Region.

Thursday, 27 August 2020
Urban Green 2020. APP-001745: Management and operations of Base Transmitter Station Infrastructure in Hardap Region.

The renewal of the ECCs for existing PowerCom Base Transmitter Station infrastructure in the Hardap Region.

Thursday, 27 August 2020
Risk-Based Solutions (RBS) 2020. APP-001737: Operations and Management of a 10 MW Solar PV Park comprising of two 5 MW Plants with 11/22vK Overhead Powerline and Access Road, Usakos, Erongo Region.

Solar Photovoltaic Project (Renewable energy) - renewal/extension of ECC.

Thursday, 27 August 2020
Environmental Compliance Consultancy (ECC) 2020. APP-001698: Exploration activities on EPL 7402 for base and rare metals, industrial minerals, precious metals in the Kunene and Otjozondjupa Regions.

Exploration activities on EPL 7402 for base and rare metals, industrial minerals, precious metals in the Kunene and Otjozondjupa Regions. Nature of activity: The proposed project is for the exploration of base and rare metals, industrial minerals and precious metals.

Thursday, 27 August 2020
Environmental Compliance Consultancy (ECC) 2020. APP-001697: Exploration activities on EPL 7341 for base and rare metals, industrial minerals, precious metals in the Oshikoto and Otjozondjupa Regions.

Exploration activities on EPL 7341 for base and rare metals, industrial minerals, precious metals in the Oshikoto and Otjozondjupa Regions. Nature of activity: The proposed project is for the exploration of base and rare metals, industrial minerals and precious metals.

Thursday, 27 August 2020
EnviroSolutions 2020. APP-001647: Application for the renewal of an Environmental Clearance Certificate for the Solar Power Plant on Namagra Mining License (ML) 142, Karibib District, Erongo Region.

The Renewal of the Environmental Clearance Certificate is for: Continuation of the Solar Power Plant operation project on ML 142, for which an Environmental Clearance was obtained during September 2017 (see attached Appendix B to the cover letter), which requires authorisation in terms of the Environmental Management Act, 2007 (Act 7 of 2007) i.e. Energy Generation, Transmission and Storage activities. Title of Activity: Continuation of the Solar Power Plant operation project on ML 142.

Thursday, 27 August 2020
Urban Green 2020. APP-001465: Application for the renewal of an Environmental Clearance Certificate for the upgrade of Road DR3610 to gravel standards, Mangetti West, Nehale Lyampingana Constituency, Oshikoto Region.

The Renewal of the Environmental Clearance Certificate is for: Quarrying activities. Potential clearance of forest area (i.e. trees) that might require authorisation in terms of the Forest Act, 2001 (Act No. 12 of 2001) or any other law. The construction of public roads. 2. Details of the Activity(s) covered by the Environmental Clearance Certificate: 2.1 Title of the Activity Upgrading of road DR3610, Mangetti West, Nehale LyaMpingana Constituency to gravel standards (Oshikoto Region).

Wednesday, 26 August 2020
2020. APP-001759: Mining Activities on Mining Claim NO. 71960 - 71962 at Karibib, Erongo Region.

Mining of semi-precious stones (Green Garnet).

Wednesday, 26 August 2020
APP-001760: Mining Activities on Claim NO. 71932- 71937 at Karibib, Erongo Region.

Mining of semi-precious stones (Andradite).

Tuesday, 25 August 2020
A. Speiser Environmental Consultants 2020. APP-001718: renewal of Environmental Clearance Certificate (ECC) for EPL 3345.

Commenting of the public on this project will expire at 12h00 on the 2020-08-25.

Tuesday, 25 August 2020
Tortoise Environmental Consultants (TEC) 2020. APP-00999: Environmental Management Plan for establishment of a poultry project at TOV Farm.

TOV Multipurpose center proposes to establish a poultry farming venture on its Plot 18 of Farm Oerwoud. Although poultry farming is not specified in the Listed Act, the proponent has been request to obtain an Environmental Clearance Certificate by the project funders. As such, an ECC is being applied for.

Monday, 24 August 2020
Mafuta Environmental Consultants 2020. APP-001615: Environmental Clearance Certificate (ECC) Renewal for the Sand/Gravel Mining Activities in the Onanime Village near Oshakati, Oshana Region.

Stantoll Properties CC (hereinafter referred to as Stantoll Properties or the Proponent) intends to continue with their sand/gravel mining activities from a sand/gravel bank in the Onanime Village, Okatana Constituency of the Oshana Region. The project has been in operation since October 2015 whereby the sand/gravel has been extracted from a burrow pit with an approximate surface area of 7 hectares (ha).

Monday, 24 August 2020
Green Earth Environmental Consultants 2020. APP-001732: Environmental Impact Assessment for the proposed construction of facilities and storage and handling of oil, petrolium (diesel and petrol) and gas production on Erven 112 and 113, Lafrenz, Windhoek.

Energy generation, transmission and storage activities - The construction of facilities for refining of gas, oil and petroleum products; Hazardous substance treatment, handling and storage - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.

Monday, 24 August 2020
Green Earth Environmental Consultants 2020. APP-001719: Environmental Impact Assessment and Environmental Management Plan for the renewal of the Environmental Clearance for the closure of Portion A of Erf 2588 (Mulderine Street) as street, the creation of Portion B of Erf 2590 as street and the construction of facilities and storage and handling of petroleum products on Erven 2589 and 2590 Walvis Bay.

Energy generation, transmission and storage facilities - The construction of facilities for the refining of gas, oil and petroleum products; Hazardous substance treatment, handling and storage - The storage and handling of dangerous goods, including petrol, diesel, liquid petroleum gas or paraffin, in containers with a combined capacity of more than 30 cubic meters at any one location. - Construction of filling stations or any other facility for the underground and aboveground storage of dangerous goods, including petrol, diesel, liquid, petroleum, gas or paraffin.

Friday, 21 August 2020
NamPower 2020. APP-001727 - The operation of the 66KV Rehoboth-Blumfelde transmission line in Hardap Region.

The ECC is for the operation of 66kV Rehoboth - Blumfelde transmission line. 66kV Rehoboth - Blumfelde line was constructed IN 1996 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 21 August 2020
NamPower 2020. APP-001726: The operation of the 66KV Omburu-Uis transmission line in Erongo Region.

The ECC is for the operation of 66kV Omburu - Uis transmission line. The 66kV Omburu - Uis line was constructed was constructed in 1974 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 21 August 2020
NamPower 2020. APP-001725: The operation of the 66KV Gobabis-Omaere transmission line in Omaheke Region.

The ECC is for the operation of the 66kV Gobabis - Omaere transmission line. The 66kV Gobabis-Omaere line was constructed from 1992 and was commissioned in 1995 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 21 August 2020
NamPower 2020. APP-001724: The operation of the 66KV Gerus-Welwitchia transmission line in Otjozondjupa and Kunene Regions.

The ECC is for the operation of the 66kV Gerus -Welwitchia transmission line. 66kV Gerus – Welwitchia line was constructed in 1989 prior to the commencement of the Environmental Management Act and its regulation, as a result there was no environmental impact assessment study conducted for the project prior to its development. It is therefore against this background that NamPower intends to apply for the operational Environmental Clearance Certificate in order to comply to the Environmental Management Act (Act 7 of 2007) and its regulations.

Friday, 21 August 2020
Nghivelwa Planning Consultants 2020. APP-001722: Closure of Portion A of Erf 912, Omuthiya Extension 3 as a public open space and subsequent rezoning.

To close a portion of erf 912, Omuthiya Extension 3 as a public open space and subsequent rezoning, subdivision and consolidation to enable the Regional Government to formalise a house already constructed on the property.

Friday, 21 August 2020
Nghivelwa Planning Consultants 2020. APP-001721: Township Establishment of Onyuulaye Proper and Onyuulaye Extension 1.

For the township establishment of Onyuulaye Proper and Extension 1 in Onyuulaye Settlement in Oshikoto Region.

Friday, 21 August 2020
Environmental Compliance Consultancy (ECC) 2020. APP-001720: Proposed Otjikoto Agricultural Project on Farm Erhardshof 575, Otjozondjupa Region, Namibia.

The environmental clearance certificate is for the proposed agriculture project for farm Erhardshof 575, Otjozondjupa region, Namibia The proposed project will be located on Farm Erhardshof 575, which is approximately 3 522 hectares in size, of which the total irrigated project size at the final phase will be 135 hectares. The intention is to initially plant fodder for cattle such as Katambora Rhodes grass as well as rotational grain crops such as maize and wheat.

Friday, 21 August 2020
Stubenrauch Planning Consultants 2020. APP-001688: Environmental Assessment for the Subdivision, Permanent Closure, Consolidation and Rezoning of Erf 695, Erf 502 and Erf 683, Nkurenkuru Extension 1.

The environmental clearance certificate is for: Activity 5.1 (d) Infrastructure The rezoning of land from use for nature conservation or zoned open space to any other land use. Activity 10.1 (b) (Infrastructure) The construction of - Public roads. Activity 10.2 (a) (Infrastructure) The route determination of roads and design of associated physical infrastructure where - it is a public road. The Proponent intends to subdivide Erf 502, Nkurenkuru Extension 1 into Erf A and the Remainder.

Friday, 21 August 2020
Erongo Consulting Group 2020. APP-001638: Construction of the Swakopmund Smallholdings potable water reservoir on remainder of Portion 79 of the Swakopmund Town and Townlands 41, Erongo.

The ECC application is for the construction of the proposed Swakopmund Smallholding Potable Water Reservoir, and it will consist of the following main elements: • Supply and installation of a prefabricated water treatment plant including all fittings and accessories: • Construction of a concrete storage tank The reservoir will be a reinforced concrete structure, and will have a round shape with a smooth surface. The round shape of the reservoir will result in the strongest and most cost effective solution.

Not found what you are looking for? Amend your search...